If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354250208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.973143,"lon":-113.461331,"icon":""}]} |
Location: 00/08-02-035-25W4/0 | |
Location Alias: 00/08-02-35-25 W4M | |
Location Alias 2: 00/08-02-035-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 25 | |
Section: 02 | |
County/Municipality: Kneehill County | |
Well Name: CPC RESOURCES HUXLEY 8-2-35-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0345796 | |
License Date: 2005-12-16 | |
License Status: Issued | |
Spud Date: 2006-01-06 | |
Final Drill Date: 2006-01-08 | |
Well Total Depth: 1027.00 m | |
Surface Hole Latitude: 51.973143 | |
Surface Hole Longitude: -113.461331 |
Date | Event |
---|---|
2005-12-16 | Obtained License |
2006-01-06 | Surface Casing Operation Performed |
2006-01-08 | Finished Drilling |
2006-01-08 | Production Casing Operation Performed |
2006-01-08 | Rig Released |
2006-01-08 | Well Mode changed to Drilled and Cased |
2006-01-15 | Well Log Performed |
2006-02-12 | Well Log Performed |
2006-02-22 | Perforation Treatment Performed - Jet Perforation |
2006-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-03 | Perforation Treatment Performed - Jet Perforation |
2006-03-05 | Perforation Treatment Performed - Fractured |
2006-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-03-07 | Well Mode changed to Testing |
2006-03-14 | Well Began Production |
2006-03-14 | Well Fluid changed to Gas |
2006-03-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-22 | Perforation | 920.00 | 921.50 | 13 |
2006-03-03 | Perforation | 651.10 | 651.60 | 13 |
2006-03-03 | Perforation | 648.40 | 648.90 | 13 |
2006-03-03 | Perforation | 643.00 | 643.50 | 13 |
2006-03-03 | Perforation | 629.00 | 629.50 | 13 |
2006-03-03 | Perforation | 620.60 | 621.10 | 13 |
2006-03-03 | Perforation | 597.50 | 599.00 | 13 |
2006-03-03 | Perforation | 581.50 | 582.50 | 13 |
2006-03-03 | Perforation | 576.20 | 576.70 | 13 |
2006-03-03 | Perforation | 575.50 | 576.00 | 13 |
2006-03-03 | Perforation | 571.10 | 571.60 | 13 |
2006-03-01 | Packing Device Capped w/Cement | 909.00 | 917.00 | 0 |
2006-03-03 | Perforation | 538.20 | 538.70 | 13 |
2006-03-03 | Perforation | 534.60 | 535.10 | 13 |
2006-03-03 | Perforation | 525.30 | 526.30 | 13 |
2006-03-03 | Perforation | 518.20 | 518.70 | 13 |
2006-03-03 | Perforation | 454.80 | 455.30 | 13 |
2006-03-03 | Perforation | 418.70 | 419.20 | 13 |
2006-03-03 | Perforation | 390.40 | 390.90 | 13 |
2006-03-03 | Perforation | 295.30 | 295.80 | 13 |
2006-03-03 | Perforation | 288.00 | 289.00 | 13 |
2006-03-03 | Perforation | 287.00 | 287.50 | 13 |
2006-03-03 | Perforation | 679.20 | 679.70 | 13 |
2006-03-03 | Perforation | 283.50 | 284.00 | 13 |
2006-03-03 | Perforation | 562.50 | 563.50 | 13 |
2006-03-03 | Perforation | 560.50 | 561.50 | 13 |
2006-03-03 | Perforation | 556.00 | 559.00 | 13 |
2006-03-03 | Perforation | 553.50 | 554.50 | 13 |
2006-03-05 | Fracture | 283.50 | 679.70 | 0 |
2006-03-03 | Perforation | 677.60 | 678.10 | 13 |
2006-03-03 | Perforation | 676.80 | 677.30 | 13 |
2006-03-03 | Perforation | 671.40 | 671.90 | 13 |
2006-03-03 | Perforation | 664.60 | 665.10 | 13 |
2006-03-03 | Perforation | 659.60 | 660.10 | 13 |
2006-03-03 | Perforation | 654.20 | 654.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7175 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8729 | 0.0 | 0.0 | 0.0 |
2011 | 8636 | 0.0 | 0.0 | 0.0 |
2012 | 8492 | 0.0 | 0.0 | 0.0 |
2013 | 8624 | 0.0 | 0.0 | 0.0 |
2014 | 8751 | 0.0 | 0.0 | 0.0 |
2015 | 8629 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]