If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354241516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.009115,"lon":-113.339059,"icon":""}]} |
Location: 00/16-15-035-24W4/0 | |
Location Alias: 00/16-15-35-24 W4M | |
Location Alias 2: 00/16-15-035-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Red Deer County | |
Well Name: PINE CLIFF HUXLEY 16-15-35-24 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0405349 | |
License Date: 2008-12-04 | |
License Status: Issued | |
Spud Date: 2008-12-12 | |
Final Drill Date: 2008-12-13 | |
Well Total Depth: 939.00 m | |
Surface Hole Latitude: 52.009115 | |
Surface Hole Longitude: -113.339059 |
Date | Event |
---|---|
2008-12-04 | Obtained License |
2008-12-12 | Surface Casing Operation Performed |
2008-12-13 | Finished Drilling |
2008-12-13 | Production Casing Operation Performed |
2008-12-13 | Well Mode changed to Drilled and Cased |
2008-12-14 | Rig Released |
2009-01-14 | Perforation Treatment Performed - Jet Perforation |
2009-01-23 | Perforation Treatment Performed - Jet Perforation |
2009-02-13 | Perforation Treatment Performed - Jet Perforation |
2009-02-18 | Perforation Treatment Performed - Fractured |
2009-02-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-02-19 | Well Mode changed to Testing |
2009-11-10 | Well Began Production |
2009-11-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-11-10 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-14 | Perforation | 885.00 | 887.00 | 13 |
2009-02-13 | Perforation | 338.00 | 339.50 | 7 |
2009-02-13 | Perforation | 365.00 | 367.00 | 7 |
2009-02-13 | Perforation | 391.60 | 392.60 | 7 |
2009-02-13 | Perforation | 396.50 | 397.50 | 7 |
2009-02-13 | Perforation | 438.50 | 439.50 | 7 |
2009-02-13 | Perforation | 441.80 | 442.80 | 7 |
2009-02-13 | Perforation | 449.00 | 450.00 | 7 |
2009-02-13 | Perforation | 460.70 | 461.70 | 7 |
2009-02-13 | Perforation | 491.80 | 493.30 | 7 |
2009-02-13 | Perforation | 499.50 | 500.50 | 7 |
2009-01-23 | Perforation | 815.00 | 816.00 | 13 |
2009-02-13 | Perforation | 510.00 | 513.50 | 7 |
2009-02-13 | Perforation | 533.30 | 534.30 | 7 |
2009-02-13 | Perforation | 559.00 | 560.00 | 7 |
2009-02-13 | Perforation | 570.20 | 571.70 | 7 |
2009-02-13 | Perforation | 573.00 | 574.50 | 7 |
2009-02-13 | Perforation | 578.50 | 579.50 | 7 |
2009-02-13 | Perforation | 580.80 | 581.80 | 7 |
2009-02-13 | Perforation | 584.50 | 586.00 | 7 |
2009-02-13 | Perforation | 587.50 | 588.50 | 7 |
2009-02-13 | Perforation | 590.00 | 591.00 | 7 |
2009-01-23 | Perforation | 771.50 | 772.50 | 13 |
2009-02-18 | Fracture | 223.50 | 887.00 | 0 |
2009-01-23 | Perforation | 647.50 | 648.50 | 13 |
2009-01-23 | Perforation | 644.50 | 646.00 | 13 |
2009-01-23 | Perforation | 624.00 | 627.00 | 13 |
2009-02-13 | Perforation | 223.50 | 224.50 | 7 |
2009-02-13 | Perforation | 303.50 | 304.50 | 7 |
2009-02-13 | Perforation | 317.20 | 318.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1272 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8752 | 0.0 | 0.0 | 0.0 |
2012 | 8657 | 0.0 | 0.0 | 0.0 |
2013 | 8497 | 0.0 | 0.0 | 0.0 |
2014 | 8611 | 0.0 | 0.0 | 0.0 |
2015 | 8608 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]