If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354241015002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.975124,"lon":-113.347135,"icon":""}]} |
Location: 00/15-10-035-24W4/2 | |
Location Alias: 00/15-10-35-24 W4M | |
Location Alias 2: 00/15-10-035-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 24 | |
Section: 10 | |
County/Municipality: Kneehill County | |
Well Name: ARTIS HZ HUXLEY 15-10-35-24 | |
Operator Name: Artis Exploration Ltd. | |
License Number: 0483231 | |
License Date: 2017-03-20 | |
License Status: Amended | |
Spud Date: 2017-03-25 | |
Final Drill Date: 2017-04-10 | |
Well Total Depth: 4431.00 m | |
Surface Hole Latitude: 51.975124 | |
Surface Hole Longitude: -113.347135 |
Date | Event |
---|---|
2017-03-20 | Obtained License |
2017-03-26 | Surface Casing Operation Performed |
2017-03-31 | Direction Drilling Operation Performed - Horizontal |
2017-04-10 | Finished Drilling |
2017-04-10 | Well Log Performed |
2017-04-10 | Well Mode changed to Drilled and Cased |
2017-04-11 | Production Casing Operation Performed |
2017-04-12 | Rig Released |
2017-05-11 | Perforation Treatment Performed - Jet Perforation |
2017-06-01 | Perforation Treatment Performed - Jet Perforation |
2017-06-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-01 | Well Began Production |
2017-06-01 | Well Fluid changed to Crude Oil |
2017-06-01 | Well Mode changed to Pumping |
2017-06-03 | Perforation Treatment Performed - Jet Perforation |
2017-06-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-04 | Perforation Treatment Performed - Jet Perforation |
2017-06-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-05 | Perforation Treatment Performed - Jet Perforation |
2017-06-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-06 | Perforation Treatment Performed - Jet Perforation |
2017-06-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-07 | Perforation Treatment Performed - Jet Perforation |
2017-06-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-08 | Perforation Treatment Performed - Jet Perforation |
2017-06-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-06-09 | Perforation Treatment Performed - Jet Perforation |
2017-06-09 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-03-31 | 1849.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-05-11 | Perforation | 4426.00 | 4427.00 | 17 |
2017-06-01 | Perforation | 4325.00 | 4326.00 | 17 |
2017-06-07 | Multi-Stage Fracture | 3256.30 | 3294.80 | 0 |
2017-06-07 | Perforation | 3243.80 | 3244.80 | 13 |
2017-06-07 | Perforation | 3231.30 | 3232.30 | 13 |
2017-06-07 | Perforation | 3218.80 | 3219.80 | 13 |
2017-06-07 | Perforation | 3206.30 | 3207.30 | 13 |
2017-06-07 | Multi-Stage Fracture | 3206.30 | 3244.80 | 0 |
2017-06-07 | Perforation | 3193.80 | 3194.80 | 13 |
2017-06-07 | Perforation | 3181.30 | 3182.30 | 13 |
2017-06-07 | Perforation | 3168.80 | 3169.80 | 13 |
2017-06-07 | Perforation | 3156.30 | 3157.30 | 13 |
2017-06-01 | Perforation | 4308.40 | 4309.40 | 17 |
2017-06-07 | Multi-Stage Fracture | 3156.30 | 3194.80 | 0 |
2017-06-07 | Perforation | 3143.80 | 3144.80 | 13 |
2017-06-07 | Perforation | 3131.30 | 3132.30 | 13 |
2017-06-07 | Perforation | 3118.80 | 3119.80 | 13 |
2017-06-07 | Perforation | 3106.30 | 3107.30 | 13 |
2017-06-07 | Multi-Stage Fracture | 3106.30 | 3144.80 | 0 |
2017-06-07 | Perforation | 3093.80 | 3094.80 | 13 |
2017-06-07 | Perforation | 3081.30 | 3082.30 | 13 |
2017-06-07 | Perforation | 3068.80 | 3069.80 | 13 |
2017-06-07 | Perforation | 3056.30 | 3057.30 | 13 |
2017-06-01 | Multi-Stage Fracture | 4308.40 | 4342.70 | 0 |
2017-06-07 | Multi-Stage Fracture | 3056.30 | 3094.80 | 0 |
2017-06-08 | Perforation | 3043.80 | 3044.80 | 13 |
2017-06-08 | Perforation | 3030.30 | 3031.30 | 13 |
2017-06-08 | Perforation | 3018.80 | 3019.80 | 13 |
2017-06-08 | Perforation | 3006.30 | 3007.30 | 13 |
2017-06-08 | Multi-Stage Fracture | 3006.30 | 3044.80 | 0 |
2017-06-08 | Perforation | 2993.80 | 2994.80 | 13 |
2017-06-08 | Perforation | 2981.30 | 3982.30 | 13 |
2017-06-08 | Perforation | 2968.80 | 2969.80 | 13 |
2017-06-08 | Perforation | 2956.30 | 2957.30 | 13 |
2017-06-03 | Perforation | 4291.70 | 4292.70 | 17 |
2017-06-08 | Multi-Stage Fracture | 2956.30 | 2994.80 | 0 |
2017-06-08 | Perforation | 2943.80 | 2944.80 | 17 |
2017-06-08 | Perforation | 2927.10 | 2928.10 | 17 |
2017-06-08 | Perforation | 2910.40 | 2911.40 | 17 |
2017-06-08 | Multi-Stage Fracture | 2910.40 | 2944.80 | 0 |
2017-06-08 | Perforation | 2893.80 | 2894.80 | 17 |
2017-06-08 | Perforation | 2877.10 | 2878.10 | 17 |
2017-06-08 | Perforation | 2864.60 | 2865.60 | 17 |
2017-06-08 | Multi-Stage Fracture | 2864.60 | 2894.80 | 0 |
2017-06-08 | Perforation | 2843.80 | 2844.80 | 17 |
2017-06-03 | Perforation | 4275.00 | 4276.00 | 17 |
2017-06-08 | Perforation | 2827.10 | 2828.10 | 17 |
2017-06-08 | Perforation | 2810.40 | 2811.40 | 17 |
2017-06-08 | Multi-Stage Fracture | 2810.40 | 2844.80 | 0 |
2017-06-08 | Perforation | 2793.80 | 2794.80 | 17 |
2017-06-08 | Perforation | 2777.10 | 2778.10 | 17 |
2017-06-08 | Perforation | 2760.40 | 2761.40 | 17 |
2017-06-08 | Multi-Stage Fracture | 2760.40 | 2794.80 | 0 |
2017-06-09 | Perforation | 2743.80 | 2744.80 | 17 |
2017-06-09 | Perforation | 2727.10 | 2728.10 | 17 |
2017-06-09 | Perforation | 2710.40 | 2711.40 | 17 |
2017-06-03 | Perforation | 4258.40 | 4259.40 | 17 |
2017-06-09 | Multi-Stage Fracture | 2710.40 | 2744.80 | 0 |
2017-06-09 | Perforation | 2693.80 | 2694.80 | 17 |
2017-06-09 | Perforation | 2677.10 | 2678.10 | 17 |
2017-06-09 | Perforation | 2660.40 | 2661.40 | 17 |
2017-06-09 | Multi-Stage Fracture | 2660.40 | 2694.80 | 0 |
2017-06-09 | Perforation | 2643.80 | 2644.80 | 17 |
2017-06-09 | Perforation | 2627.10 | 2628.10 | 17 |
2017-06-09 | Perforation | 2610.40 | 2611.40 | 17 |
2017-06-09 | Multi-Stage Fracture | 2610.40 | 2644.80 | 0 |
2017-06-09 | Perforation | 2593.80 | 2594.80 | 17 |
2017-06-03 | Multi-Stage Fracture | 4258.40 | 4292.70 | 0 |
2017-06-09 | Perforation | 2577.10 | 2578.10 | 17 |
2017-06-09 | Perforation | 2560.40 | 2561.40 | 17 |
2017-06-09 | Multi-Stage Fracture | 2560.40 | 2594.80 | 0 |
2017-06-09 | Perforation | 2543.80 | 2544.80 | 17 |
2017-06-09 | Perforation | 2527.10 | 2528.10 | 17 |
2017-06-09 | Perforation | 2510.40 | 2511.40 | 17 |
2017-06-09 | Multi-Stage Fracture | 2510.40 | 2544.80 | 0 |
2017-06-09 | Perforation | 2493.80 | 2494.80 | 17 |
2017-06-09 | Perforation | 2477.10 | 2478.10 | 17 |
2017-06-09 | Perforation | 2460.40 | 2461.40 | 17 |
2017-06-03 | Perforation | 4241.70 | 4242.70 | 17 |
2017-06-09 | Multi-Stage Fracture | 2460.40 | 2494.80 | 0 |
2017-06-03 | Perforation | 4225.00 | 4226.00 | 17 |
2017-06-03 | Perforation | 4208.40 | 4209.40 | 17 |
2017-05-11 | Perforation | 4419.00 | 4420.00 | 17 |
2017-06-03 | Multi-Stage Fracture | 4208.40 | 4242.70 | 0 |
2017-06-03 | Perforation | 4191.70 | 4192.70 | 17 |
2017-06-03 | Perforation | 4175.00 | 4176.00 | 17 |
2017-06-03 | Perforation | 4158.40 | 4159.40 | 17 |
2017-06-03 | Multi-Stage Fracture | 4158.40 | 4192.70 | 0 |
2017-06-03 | Perforation | 4141.70 | 4142.70 | 17 |
2017-06-03 | Perforation | 4125.00 | 4126.00 | 17 |
2017-06-03 | Perforation | 4108.40 | 4109.40 | 17 |
2017-06-04 | Multi-Stage Fracture | 4108.40 | 4142.70 | 0 |
2017-06-04 | Perforation | 4091.70 | 4092.70 | 17 |
2017-05-11 | Perforation | 4414.00 | 4415.00 | 17 |
2017-06-04 | Perforation | 4076.00 | 4077.00 | 17 |
2017-06-04 | Perforation | 4058.40 | 4059.40 | 17 |
2017-06-04 | Multi-Stage Fracture | 4058.40 | 4092.70 | 0 |
2017-06-04 | Perforation | 4041.70 | 4042.70 | 17 |
2017-06-04 | Perforation | 4025.00 | 4026.00 | 17 |
2017-06-04 | Perforation | 4008.40 | 4009.40 | 17 |
2017-06-04 | Multi-Stage Fracture | 4008.40 | 4042.70 | 0 |
2017-06-04 | Perforation | 3991.70 | 3992.70 | 17 |
2017-06-04 | Perforation | 3975.00 | 3976.00 | 17 |
2017-06-04 | Perforation | 3958.40 | 3959.40 | 17 |
2017-06-01 | Multi-Stage Fracture | 4414.00 | 4427.00 | 0 |
2017-06-04 | Multi-Stage Fracture | 3958.40 | 3992.70 | 0 |
2017-06-04 | Perforation | 3941.70 | 3942.70 | 17 |
2017-06-04 | Perforation | 3925.00 | 3926.00 | 17 |
2017-06-04 | Perforation | 3908.40 | 3909.40 | 17 |
2017-06-04 | Multi-Stage Fracture | 3908.40 | 3942.70 | 0 |
2017-06-04 | Perforation | 3891.70 | 3892.70 | 17 |
2017-06-04 | Perforation | 3875.00 | 3876.00 | 17 |
2017-06-04 | Perforation | 3858.40 | 3859.40 | 17 |
2017-06-05 | Multi-Stage Fracture | 3859.40 | 3891.70 | 0 |
2017-06-05 | Perforation | 3841.70 | 3842.70 | 17 |
2017-06-01 | Perforation | 4391.70 | 4392.70 | 17 |
2017-06-05 | Perforation | 3825.00 | 3826.00 | 17 |
2017-06-05 | Perforation | 3813.00 | 3814.00 | 17 |
2017-06-05 | Multi-Stage Fracture | 3813.00 | 3842.70 | 0 |
2017-06-05 | Perforation | 3791.70 | 3792.70 | 17 |
2017-06-05 | Perforation | 3775.00 | 3776.00 | 17 |
2017-06-05 | Perforation | 3763.00 | 3764.00 | 17 |
2017-06-05 | Multi-Stage Fracture | 3763.00 | 3792.70 | 0 |
2017-06-05 | Perforation | 3741.70 | 3742.70 | 17 |
2017-06-05 | Perforation | 3725.00 | 3726.00 | 17 |
2017-06-05 | Perforation | 3708.40 | 3709.40 | 17 |
2017-06-01 | Perforation | 4375.00 | 4376.00 | 17 |
2017-06-05 | Multi-Stage Fracture | 3708.40 | 3742.70 | 0 |
2017-06-05 | Perforation | 3691.70 | 3692.70 | 17 |
2017-06-05 | Perforation | 3675.00 | 3676.00 | 17 |
2017-06-05 | Perforation | 3658.40 | 3659.40 | 17 |
2017-06-05 | Multi-Stage Fracture | 3658.40 | 3692.70 | 0 |
2017-06-06 | Perforation | 3641.70 | 3642.70 | 17 |
2017-06-06 | Perforation | 3625.00 | 3626.00 | 17 |
2017-06-06 | Perforation | 3608.40 | 3609.40 | 17 |
2017-06-06 | Multi-Stage Fracture | 3608.40 | 3642.70 | 0 |
2017-06-06 | Perforation | 3591.70 | 3592.70 | 17 |
2017-06-01 | Perforation | 4358.40 | 4359.40 | 17 |
2017-06-06 | Perforation | 3575.00 | 3576.00 | 17 |
2017-06-06 | Perforation | 3558.40 | 3559.40 | 17 |
2017-06-06 | Multi-Stage Fracture | 3558.40 | 3592.70 | 0 |
2017-06-06 | Perforation | 3541.70 | 3542.70 | 17 |
2017-06-06 | Perforation | 3525.00 | 3526.00 | 17 |
2017-06-06 | Perforation | 3508.40 | 3509.40 | 17 |
2017-06-06 | Multi-Stage Fracture | 3508.40 | 3542.70 | 0 |
2017-06-06 | Perforation | 3493.80 | 3494.80 | 17 |
2017-06-06 | Perforation | 3481.30 | 3482.30 | 17 |
2017-06-06 | Perforation | 3468.80 | 3469.80 | 17 |
2017-06-01 | Multi-Stage Fracture | 4358.40 | 4392.70 | 0 |
2017-06-06 | Multi-Stage Fracture | 3468.80 | 3494.80 | 0 |
2017-06-06 | Perforation | 3443.80 | 3444.80 | 13 |
2017-06-06 | Perforation | 3431.30 | 3432.30 | 13 |
2017-06-06 | Perforation | 3418.80 | 3419.80 | 13 |
2017-06-06 | Perforation | 3406.30 | 3407.30 | 13 |
2017-06-06 | Multi-Stage Fracture | 3406.30 | 3444.80 | 0 |
2017-06-06 | Perforation | 3393.80 | 3394.80 | 13 |
2017-06-06 | Perforation | 3381.30 | 3382.30 | 13 |
2017-06-06 | Perforation | 3368.80 | 3369.80 | 13 |
2017-06-06 | Perforation | 3356.30 | 3357.30 | 13 |
2017-06-01 | Perforation | 4341.70 | 4342.70 | 17 |
2017-06-06 | Multi-Stage Fracture | 3356.30 | 3394.80 | 0 |
2017-06-07 | Perforation | 3343.80 | 3344.80 | 13 |
2017-06-07 | Perforation | 3331.30 | 3332.30 | 13 |
2017-06-07 | Perforation | 3318.80 | 3319.80 | 13 |
2017-06-07 | Perforation | 3306.30 | 3307.30 | 13 |
2017-06-07 | Multi-Stage Fracture | 3306.30 | 3344.80 | 0 |
2017-06-07 | Perforation | 3293.80 | 3294.80 | 13 |
2017-06-07 | Perforation | 3281.30 | 3282.30 | 13 |
2017-06-07 | Perforation | 3268.80 | 3269.80 | 13 |
2017-06-07 | Perforation | 3256.30 | 3257.30 | 13 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-06-01 | 2017-06-09 | 2,217 | 32,997 | N/A |
2 | 2017-06-05 | 2017-06-09 | 2,217 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 86.4676 | N/A | |||
Prime Plus (30/50) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 0.9969 | N/A | ||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 6.0952 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 6.0952 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 6.0952 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 6.0951 | N/A | ||||
Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.205 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.205 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.205 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.205 | N/A | ||||
Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.5782 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 0.5782 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.5782 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.5781 | N/A | ||||
HCL 15% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 1.1307 | N/A | |
Water | 7732-18-5 | 100 | 1.1307 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0255 | N/A | |
Water | 7732-18-5 | 100 | 0.0255 | N/A | ||||
CAN-2323 Breaker (Oxidizer Delayed LT) | Canyon Technical Services | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0101 | N/A | |
Crystalline silica. quartz | 14808-60-7 | 100 | 0.0101 | N/A | ||||
Cured acrylic resin | Not Available | 100 | 0.0101 | N/A | ||||
Talc | 14807-96-6 | 100 | 0.0101 | N/A | ||||
CAN-1000 Corrosion Inhibitor | Canyon Technical Services | Corrosion Inhibitor | Refer to MSDS | 8141 | 100 | 0.0073 | N/A | |
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0607 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.0607 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0607 | N/A | ||||
CAN-1200 Anti-Sludge Agent / Non-Emulsifier | Canyon Technical Services | Demulsifier | Refer to MSDS | 8251 | 100 | 0.0099 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0878 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0878 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0878 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0878 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0878 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.1892 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0722 | N/A | |
CAN-1101 Iron Control Reduction | Canyon Technical Services | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.015 | N/A | |
Cupric Chloride | 7447-39-4 | 100 | 0.015 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.015 | N/A | ||||
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0356 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0356 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0356 | N/A | ||||
CAN-1202 Acid Wetting Agent | Canyon Technical Services | Surfactant | 1-Methoxy-2-Propanol | 107-98-2 | 100 | 0.0106 | N/A | |
Water | 7732-18-5 | 100 | 0.0106 | N/A | ||||
2 | CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0033 | N/A |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0033 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-06-01 | 2017-06-10 | Surface Water - Lake | 35185 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 2909 | 0.0 | 0.0 | 0.0 |
2018 | 5422 | 0.0 | 0.0 | 0.0 |
2019 | 8537 | 0.0 | 0.0 | 0.0 |
2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-04-05 | No Incident Encountered | 0.00 | 0.00 |
2017-06-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]