X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354240102002

Well Details

Well ID: 0354240102002
Loading map...
Location: 00/02-01-035-24W4/2
Location Alias: 00/02-01-35-24 W4M
Location Alias 2: 00/02-01-035-24 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 24
Section: 01
County/Municipality: Kneehill County
Well Name: PINE CLIFF HUXLEY 2-1-35-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0199179
License Date: 1997-03-10
License Status: Issued
Spud Date: 1997-03-14
Final Drill Date: 1997-03-18
Well Total Depth: 1687.00 m
Surface Hole Latitude: 51.970292
Surface Hole Longitude: -113.297549

For data sources see[1][2]

Well History

Date Event
1997-03-10 Obtained License
1997-03-14 Lost Circulation Occurred
1997-03-16 Surface Casing Operation Performed
1997-03-18 Finished Drilling
1997-03-18 Well Mode changed to Drilled and Cased
1997-03-19 Well Log Performed
1997-03-20 Production Casing Operation Performed
1997-03-20 Rig Released
1997-04-11 Perforation Treatment Performed - Jet Perforation
1997-04-11 Well Log Performed
1997-04-12 Perforation Treatment Performed - Fractured
1998-03-19 Well Log Performed
1998-05-19 Well Log Performed
2002-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-10 Perforation Treatment Performed - Jet Perforation
2002-10-10 Plug Back Performed
2002-10-10 Well Log Performed
2002-10-11 Perforation Treatment Performed - Jet Perforation
2002-10-11 Well Log Performed
2003-01-14 Well Began Production
2003-01-14 Well Fluid changed to Gas
2003-01-14 Well Mode changed to Flowing
2006-01-01 Well Fluid changed to Gas
2006-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-11 Perforation 1609.00 1611.50 17
1997-04-12 Fracture 1609.00 1611.50 0
2002-10-10 Packing Device Capped w/Cement 1592.00 1600.00 0
2002-10-10 Perforation 1421.50 1423.50 17
2002-10-11 Perforation 1441.50 1444.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 8447 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8708 0.0 0.0 0.0
2012 8633 0.0 0.0 0.0
2013 8578 0.0 0.0 0.0
2014 8532 0.0 0.0 0.0
2015 8741 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-03-14 Lost Circulation 26.00 87.00

For data sources see[6]

References