If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354233010030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.034401,"lon":-113.273553,"icon":""}]} |
Location: 03/10-30-035-23W4/0 | |
Location Alias: 03/10-30-35-23 W4M | |
Location Alias 2: 03/10-30-035-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 23 | |
Section: 30 | |
County/Municipality: Red Deer County | |
Well Name: EMBER 103 ELNORA 10-30-35-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425481 | |
License Date: 2010-11-03 | |
License Status: Issued | |
Spud Date: 2010-12-14 | |
Final Drill Date: 2010-12-19 | |
Well Total Depth: 623.80 m | |
Surface Hole Latitude: 52.034401 | |
Surface Hole Longitude: -113.273553 |
Date | Event |
---|---|
2010-11-03 | Obtained License |
2010-12-14 | Surface Casing Operation Performed |
2010-12-19 | Finished Drilling |
2010-12-19 | Well Mode changed to Drilled and Cased |
2010-12-20 | Production Casing Operation Performed |
2010-12-20 | Rig Released |
2011-01-06 | Well Log Performed |
2011-02-07 | Perforation Treatment Performed - Jet Perforation |
2011-02-17 | Perforation Treatment Performed - Fractured |
2011-02-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-20 | Well Mode changed to Testing |
2011-03-02 | Well Began Production |
2011-03-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-02 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-07 | Perforation | 440.30 | 441.30 | 13 |
2011-02-07 | Perforation | 319.60 | 320.10 | 13 |
2011-02-07 | Perforation | 352.00 | 354.00 | 13 |
2011-02-07 | Perforation | 360.00 | 361.50 | 13 |
2011-02-07 | Perforation | 422.80 | 423.30 | 13 |
2011-02-07 | Perforation | 428.50 | 429.00 | 13 |
2011-02-07 | Perforation | 376.40 | 378.40 | 13 |
2011-02-07 | Perforation | 380.30 | 381.30 | 13 |
2011-02-07 | Perforation | 484.20 | 486.70 | 13 |
2011-02-07 | Perforation | 577.30 | 578.30 | 13 |
2011-02-07 | Perforation | 574.00 | 575.50 | 13 |
2011-02-07 | Perforation | 443.90 | 444.90 | 13 |
2011-02-07 | Perforation | 556.50 | 557.50 | 13 |
2011-02-07 | Perforation | 580.90 | 581.90 | 13 |
2011-02-07 | Perforation | 590.70 | 591.70 | 13 |
2011-02-07 | Perforation | 585.40 | 585.90 | 13 |
2011-02-07 | Perforation | 582.40 | 583.90 | 13 |
2011-02-07 | Perforation | 544.60 | 546.10 | 13 |
2011-02-07 | Perforation | 510.20 | 510.70 | 13 |
2011-02-07 | Perforation | 523.40 | 524.90 | 13 |
2011-02-07 | Perforation | 496.10 | 498.10 | 13 |
2011-02-07 | Perforation | 500.70 | 502.20 | 13 |
2011-02-07 | Perforation | 433.10 | 435.10 | 13 |
2011-02-07 | Perforation | 539.30 | 539.80 | 13 |
2011-02-07 | Perforation | 536.30 | 536.80 | 13 |
2011-02-07 | Perforation | 535.10 | 535.60 | 13 |
2011-02-17 | Fracture | 352.00 | 361.50 | 0 |
2011-02-17 | Fracture | 580.90 | 591.70 | 0 |
2011-02-17 | Fracture | 313.30 | 578.30 | 0 |
2011-02-07 | Perforation | 437.40 | 438.40 | 13 |
2011-02-07 | Perforation | 457.20 | 458.70 | 13 |
2011-02-07 | Perforation | 480.20 | 480.70 | 13 |
2011-02-07 | Perforation | 450.40 | 452.40 | 13 |
2011-02-07 | Perforation | 454.90 | 455.90 | 13 |
2011-02-07 | Perforation | 313.30 | 313.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7267 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8708 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]