If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354231906002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.017258,"lon":-113.279727,"icon":""}]} |
Location: 00/06-19-035-23W4/2 | |
Location Alias: 00/06-19-35-23 W4M | |
Location Alias 2: 00/06-19-035-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 23 | |
Section: 19 | |
County/Municipality: Red Deer County | |
Well Name: EMBER ELNORA 6-19-35-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425268 | |
License Date: 2010-10-28 | |
License Status: Issued | |
Spud Date: 2010-12-12 | |
Final Drill Date: 2010-12-15 | |
Well Total Depth: 868.20 m | |
Surface Hole Latitude: 52.017258 | |
Surface Hole Longitude: -113.279727 |
Date | Event |
---|---|
2010-10-28 | Obtained License |
2010-12-12 | Surface Casing Operation Performed |
2010-12-15 | Finished Drilling |
2010-12-15 | Well Mode changed to Drilled and Cased |
2010-12-16 | Production Casing Operation Performed |
2010-12-16 | Rig Released |
2011-01-05 | Well Log Performed |
2011-02-11 | Perforation Treatment Performed - Jet Perforation |
2011-02-25 | Well Log Performed |
2011-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-06 | Perforation Treatment Performed - Jet Perforation |
2011-03-06 | Plug Back Performed |
2011-03-11 | Perforation Treatment Performed - Jet Perforation |
2011-03-15 | Perforation Treatment Performed - Fractured |
2011-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-18 | Well Mode changed to Testing |
2011-03-23 | Well Began Production |
2011-03-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-11 | Perforation | 844.00 | 848.00 | 13 |
2011-03-11 | Perforation | 425.00 | 426.50 | 13 |
2011-03-11 | Perforation | 407.30 | 408.80 | 13 |
2011-03-11 | Perforation | 291.20 | 291.70 | 13 |
2011-03-11 | Perforation | 285.90 | 286.90 | 13 |
2011-03-11 | Perforation | 275.00 | 275.50 | 13 |
2011-03-11 | Perforation | 328.30 | 328.80 | 13 |
2011-03-11 | Perforation | 365.90 | 366.90 | 13 |
2011-03-11 | Perforation | 353.80 | 354.80 | 13 |
2011-03-11 | Perforation | 345.80 | 346.80 | 13 |
2011-03-11 | Perforation | 557.50 | 558.00 | 13 |
2011-03-06 | Packing Device Capped w/Cement | 834.00 | 842.00 | 0 |
2011-03-11 | Perforation | 553.20 | 554.20 | 13 |
2011-03-11 | Perforation | 550.90 | 551.90 | 13 |
2011-03-11 | Perforation | 561.00 | 562.00 | 13 |
2011-03-11 | Perforation | 494.50 | 497.00 | 13 |
2011-03-11 | Perforation | 476.50 | 478.00 | 13 |
2011-03-11 | Perforation | 541.60 | 542.60 | 13 |
2011-03-11 | Perforation | 456.00 | 458.50 | 13 |
2011-03-11 | Perforation | 500.90 | 501.90 | 13 |
2011-03-11 | Perforation | 473.60 | 475.60 | 13 |
2011-03-11 | Perforation | 513.10 | 513.60 | 13 |
2011-03-06 | Perforation | 607.00 | 609.00 | 13 |
2011-03-11 | Perforation | 536.80 | 537.80 | 13 |
2011-03-11 | Perforation | 525.20 | 525.70 | 13 |
2011-03-15 | Fracture | 275.00 | 554.20 | 0 |
2011-03-15 | Fracture | 557.50 | 558.00 | 0 |
2011-03-15 | Fracture | 476.50 | 562.00 | 0 |
2011-03-11 | Perforation | 417.30 | 418.30 | 13 |
2011-03-11 | Perforation | 414.30 | 414.80 | 13 |
2011-03-11 | Perforation | 411.60 | 412.60 | 13 |
2011-03-11 | Perforation | 423.90 | 424.40 | 13 |
2011-03-11 | Perforation | 453.50 | 454.00 | 13 |
2011-03-11 | Perforation | 430.60 | 431.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6763 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8708 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]