If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354231416002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.009026,"lon":-113.176733,"icon":""}]} |
Location: 00/16-14-035-23W4/2 | |
Location Alias: 00/16-14-35-23 W4M | |
Location Alias 2: 00/16-14-035-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 23 | |
Section: 14 | |
County/Municipality: Red Deer County | |
Well Name: EMBER ELNORA 16-14-35-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0348243 | |
License Date: 2006-01-10 | |
License Status: Amended | |
Spud Date: 2006-01-19 | |
Final Drill Date: 2006-01-22 | |
Well Total Depth: 927.00 m | |
Surface Hole Latitude: 52.009026 | |
Surface Hole Longitude: -113.176733 |
Date | Event |
---|---|
2006-01-10 | Obtained License |
2006-01-20 | Surface Casing Operation Performed |
2006-01-22 | Finished Drilling |
2006-01-22 | Production Casing Operation Performed |
2006-01-22 | Rig Released |
2006-01-22 | Well Mode changed to Drilled and Cased |
2006-01-29 | Well Log Performed |
2006-02-05 | Perforation Treatment Performed - Jet Perforation |
2006-02-05 | Well Log Performed |
2006-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-07-13 | Perforation Treatment Performed - Jet Perforation |
2006-07-13 | Plug Back Performed |
2006-07-13 | Well Log Performed |
2006-08-27 | Perforation Treatment Performed - Jet Perforation |
2006-09-07 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-05 | Perforation | 847.50 | 849.00 | 17 |
2006-08-27 | Perforation | 557.00 | 557.80 | 14 |
2006-08-27 | Perforation | 539.90 | 540.80 | 14 |
2006-08-27 | Perforation | 537.50 | 538.80 | 14 |
2006-08-27 | Perforation | 536.40 | 536.70 | 14 |
2006-08-27 | Perforation | 527.50 | 528.20 | 14 |
2006-08-27 | Perforation | 521.20 | 521.50 | 14 |
2006-08-27 | Perforation | 518.70 | 519.10 | 14 |
2006-08-27 | Perforation | 505.40 | 506.00 | 14 |
2006-08-27 | Perforation | 501.50 | 503.50 | 17 |
2006-08-27 | Perforation | 473.90 | 475.10 | 14 |
2006-07-13 | Packing Device Capped w/Cement | 837.00 | 845.00 | 0 |
2006-08-27 | Perforation | 466.20 | 466.50 | 14 |
2006-08-27 | Perforation | 460.40 | 462.40 | 14 |
2006-08-27 | Perforation | 458.70 | 460.00 | 14 |
2006-08-27 | Perforation | 438.10 | 438.40 | 14 |
2006-08-27 | Perforation | 436.40 | 437.20 | 14 |
2006-08-27 | Perforation | 435.20 | 436.00 | 14 |
2006-08-27 | Perforation | 427.30 | 428.10 | 14 |
2006-08-27 | Perforation | 426.50 | 427.00 | 14 |
2006-08-27 | Perforation | 420.20 | 420.70 | 14 |
2006-08-27 | Perforation | 405.00 | 408.00 | 17 |
2006-07-13 | Perforation | 611.00 | 613.00 | 17 |
2006-08-27 | Perforation | 402.00 | 403.50 | 17 |
2006-08-27 | Perforation | 392.70 | 393.30 | 14 |
2006-08-27 | Perforation | 354.10 | 354.40 | 14 |
2006-08-27 | Perforation | 343.70 | 344.00 | 14 |
2006-08-27 | Perforation | 333.10 | 333.40 | 14 |
2006-08-27 | Perforation | 323.00 | 323.30 | 14 |
2006-08-27 | Perforation | 317.10 | 317.40 | 14 |
2006-09-07 | Fracture | 317.10 | 577.30 | 0 |
2006-08-27 | Perforation | 577.00 | 577.30 | 14 |
2006-08-27 | Perforation | 575.70 | 576.00 | 14 |
2006-08-27 | Perforation | 574.90 | 575.20 | 14 |
2006-08-27 | Perforation | 568.90 | 569.20 | 14 |
2006-08-27 | Perforation | 565.80 | 566.20 | 14 |
2006-08-27 | Perforation | 560.70 | 561.00 | 14 |
For data sources see[4]