If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354222111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.022018,"lon":-113.092494,"icon":""}]} |
Location: 00/11-21-035-22W4/0 | |
Location Alias: 00/11-21-35-22 W4M | |
Location Alias 2: 00/11-21-035-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 22 | |
Section: 21 | |
County/Municipality: Red Deer County | |
Well Name: EMBER ELNORA 11-21-35-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0419447 | |
License Date: 2010-03-31 | |
License Status: Issued | |
Spud Date: 2010-11-20 | |
Final Drill Date: 2010-11-30 | |
Well Total Depth: 882.00 m | |
Surface Hole Latitude: 52.022018 | |
Surface Hole Longitude: -113.092494 |
Date | Event |
---|---|
2010-03-31 | Obtained License |
2010-11-20 | Lost Circulation Occurred |
2010-11-20 | Surface Casing Operation Performed |
2010-11-30 | Finished Drilling |
2010-11-30 | Production Casing Operation Performed |
2010-11-30 | Rig Released |
2010-11-30 | Well Mode changed to Drilled and Cased |
2010-12-05 | Well Log Performed |
2011-01-18 | Perforation Treatment Performed - Jet Perforation |
2011-02-04 | Perforation Treatment Performed - Jet Perforation |
2011-02-15 | Perforation Treatment Performed - Fractured |
2011-02-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-18 | Well Mode changed to Testing |
2011-02-27 | Well Began Production |
2011-02-27 | Well Fluid changed to Coalbed Methane-Coals Only |
2011-02-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-18 | Perforation | 801.00 | 803.00 | 13 |
2011-02-04 | Perforation | 296.90 | 297.40 | 13 |
2011-02-04 | Perforation | 259.70 | 260.20 | 13 |
2011-02-04 | Perforation | 270.40 | 270.90 | 13 |
2011-02-04 | Perforation | 308.50 | 313.00 | 13 |
2011-02-04 | Perforation | 315.00 | 320.00 | 13 |
2011-02-04 | Perforation | 293.40 | 293.90 | 13 |
2011-02-04 | Perforation | 295.40 | 295.90 | 13 |
2011-02-04 | Perforation | 272.70 | 273.70 | 13 |
2011-02-04 | Perforation | 281.20 | 281.70 | 13 |
2011-02-04 | Perforation | 486.40 | 487.40 | 13 |
2011-02-04 | Perforation | 386.50 | 387.50 | 13 |
2011-02-04 | Perforation | 487.40 | 487.90 | 13 |
2011-02-04 | Perforation | 468.50 | 469.00 | 13 |
2011-02-04 | Perforation | 478.90 | 479.90 | 13 |
2011-02-04 | Perforation | 527.20 | 527.70 | 13 |
2011-02-04 | Perforation | 547.00 | 547.50 | 13 |
2011-02-04 | Perforation | 497.30 | 497.80 | 13 |
2011-02-04 | Perforation | 502.40 | 502.90 | 13 |
2011-02-04 | Perforation | 422.80 | 423.30 | 13 |
2011-02-04 | Perforation | 423.20 | 425.20 | 13 |
2011-02-04 | Perforation | 404.70 | 405.70 | 13 |
2011-02-04 | Perforation | 389.10 | 389.60 | 13 |
2011-02-04 | Perforation | 422.10 | 422.60 | 13 |
2011-02-04 | Perforation | 440.40 | 441.40 | 13 |
2011-02-04 | Perforation | 468.10 | 468.60 | 13 |
2011-02-04 | Perforation | 426.90 | 427.90 | 13 |
2011-02-04 | Perforation | 429.80 | 430.80 | 13 |
2011-02-15 | Fracture | 308.50 | 320.00 | 0 |
2011-02-15 | Fracture | 259.70 | 527.70 | 0 |
2011-02-15 | Fracture | 547.00 | 547.50 | 0 |
2011-02-04 | Perforation | 323.80 | 324.80 | 13 |
2011-02-04 | Perforation | 341.40 | 341.90 | 13 |
2011-02-04 | Perforation | 402.70 | 403.70 | 13 |
2011-02-04 | Perforation | 403.80 | 404.80 | 13 |
2011-02-04 | Perforation | 392.00 | 393.00 | 13 |
2011-02-04 | Perforation | 395.80 | 396.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7188 | 0.0 | 0.0 | 0.0 |
2012 | 8648 | 0.0 | 0.0 | 0.0 |
2013 | 8682 | 0.0 | 0.0 | 0.0 |
2014 | 8653 | 0.0 | 0.0 | 0.0 |
2015 | 8715 | 0.0 | 0.0 | 0.0 |
2016 | 8677 | 0.0 | 0.0 | 0.0 |
2017 | 8696 | 0.0 | 0.0 | 0.0 |
2018 | 8564 | 0.0 | 0.0 | 0.0 |
2019 | 8278 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-11-20 | Lost Circulation | 52.00 | 63.00 |
For data sources see[6]