If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354211903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.014804,"lon":-112.998484,"icon":""}]} |
Location: 00/03-19-035-21W4/0 | |
Location Alias: 00/03-19-35-21 W4M | |
Location Alias 2: 00/03-19-035-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 19 | |
County/Municipality: Red Deer County | |
Well Name: EMBER RICH 3-19-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425358 | |
License Date: 2010-11-01 | |
License Status: Issued | |
Spud Date: 2010-12-12 | |
Final Drill Date: 2010-12-14 | |
Well Total Depth: 797.00 m | |
Surface Hole Latitude: 52.014804 | |
Surface Hole Longitude: -112.998484 |
Date | Event |
---|---|
2010-11-01 | Obtained License |
2010-12-12 | Surface Casing Operation Performed |
2010-12-14 | Finished Drilling |
2010-12-14 | Well Mode changed to Drilled and Cased |
2010-12-15 | Production Casing Operation Performed |
2010-12-15 | Rig Released |
2011-01-04 | Well Log Performed |
2011-02-11 | Perforation Treatment Performed - Jet Perforation |
2011-03-03 | Perforation Treatment Performed - Jet Perforation |
2011-03-14 | Perforation Treatment Performed - Fractured |
2011-03-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-17 | Well Mode changed to Testing |
2011-03-23 | Well Began Production |
2011-03-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-11 | Perforation | 776.00 | 778.00 | 13 |
2011-03-03 | Perforation | 242.40 | 243.90 | 13 |
2011-03-03 | Perforation | 247.50 | 248.00 | 13 |
2011-03-03 | Perforation | 394.00 | 397.00 | 13 |
2011-03-03 | Perforation | 236.40 | 237.90 | 13 |
2011-03-03 | Perforation | 292.40 | 293.40 | 13 |
2011-03-03 | Perforation | 303.20 | 303.70 | 13 |
2011-03-03 | Perforation | 262.60 | 264.10 | 13 |
2011-03-03 | Perforation | 271.00 | 271.50 | 13 |
2011-03-03 | Perforation | 462.30 | 463.80 | 13 |
2011-03-03 | Perforation | 457.90 | 458.90 | 13 |
2011-03-03 | Perforation | 318.00 | 319.00 | 13 |
2011-03-03 | Perforation | 442.50 | 443.50 | 13 |
2011-03-03 | Perforation | 477.30 | 478.80 | 13 |
2011-03-03 | Perforation | 757.90 | 758.90 | 13 |
2011-03-03 | Perforation | 749.70 | 750.20 | 13 |
2011-03-03 | Perforation | 502.90 | 504.40 | 13 |
2011-03-03 | Perforation | 384.40 | 386.90 | 13 |
2011-03-03 | Perforation | 408.40 | 409.40 | 13 |
2011-03-03 | Perforation | 377.10 | 380.10 | 13 |
2011-03-03 | Perforation | 381.40 | 382.90 | 13 |
2011-03-03 | Perforation | 416.40 | 418.90 | 13 |
2011-03-03 | Perforation | 329.20 | 329.70 | 13 |
2011-03-03 | Perforation | 410.60 | 412.60 | 13 |
2011-03-03 | Perforation | 413.70 | 416.70 | 13 |
2011-03-14 | Fracture | 394.00 | 397.00 | 0 |
2011-03-14 | Fracture | 236.40 | 463.80 | 0 |
2011-03-14 | Fracture | 749.70 | 758.90 | 0 |
2011-03-14 | Fracture | 477.30 | 504.40 | 0 |
2011-03-03 | Perforation | 310.90 | 311.90 | 13 |
2011-03-03 | Perforation | 315.00 | 316.50 | 13 |
2011-03-03 | Perforation | 373.90 | 374.90 | 13 |
2011-03-03 | Perforation | 374.90 | 377.40 | 13 |
2011-03-03 | Perforation | 338.10 | 339.10 | 13 |
2011-03-03 | Perforation | 367.00 | 368.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6809 | 0.0 | 0.0 | 0.0 |
2012 | 8613 | 0.0 | 0.0 | 0.0 |
2013 | 8646 | 0.0 | 0.0 | 0.0 |
2014 | 8662 | 0.0 | 0.0 | 0.0 |
2015 | 8659 | 0.0 | 0.0 | 0.0 |
2016 | 8676 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8656 | 0.0 | 0.0 | 0.0 |
2019 | 8704 | 0.0 | 0.0 | 0.0 |
2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]