If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354210915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.990988,"lon":-112.944409,"icon":""}]} |
Location: 00/15-09-035-21W4/0 | |
Location Alias: 00/15-09-35-21 W4M | |
Location Alias 2: 00/15-09-035-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 09 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD RICH 15-9-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0437622 | |
License Date: 2011-10-13 | |
License Status: Issued | |
Spud Date: 2012-01-28 | |
Final Drill Date: 2012-01-30 | |
Well Total Depth: 943.00 m | |
Surface Hole Latitude: 51.990988 | |
Surface Hole Longitude: -112.944409 |
Date | Event |
---|---|
2011-10-13 | Obtained License |
2012-01-28 | Conductor Casing Operation Performed |
2012-01-28 | Direction Drilling Operation Performed - Deviate |
2012-01-29 | Surface Casing Operation Performed |
2012-01-30 | Finished Drilling |
2012-01-30 | Production Casing Operation Performed |
2012-01-30 | Rig Released |
2012-01-30 | Well Mode changed to Drilled and Cased |
2012-02-03 | Well Log Performed |
2012-02-13 | Perforation Treatment Performed - Jet Perforation |
2012-02-19 | Perforation Treatment Performed - Fractured |
2012-02-24 | Well Began Production |
2012-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-28 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-28 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-13 | Perforation | 281.30 | 281.80 | 13 |
2012-02-13 | Perforation | 391.60 | 392.60 | 13 |
2012-02-13 | Perforation | 395.60 | 396.10 | 13 |
2012-02-13 | Perforation | 405.40 | 407.40 | 13 |
2012-02-13 | Perforation | 407.10 | 409.60 | 13 |
2012-02-13 | Perforation | 412.20 | 413.20 | 13 |
2012-02-13 | Perforation | 427.00 | 427.50 | 13 |
2012-02-13 | Perforation | 431.20 | 432.70 | 13 |
2012-02-13 | Perforation | 435.40 | 437.40 | 13 |
2012-02-13 | Perforation | 448.50 | 451.50 | 13 |
2012-02-13 | Perforation | 451.50 | 453.50 | 13 |
2012-02-13 | Perforation | 288.10 | 288.60 | 13 |
2012-02-13 | Perforation | 458.70 | 459.20 | 13 |
2012-02-13 | Perforation | 463.80 | 464.80 | 13 |
2012-02-13 | Perforation | 474.40 | 475.40 | 13 |
2012-02-13 | Perforation | 476.70 | 479.70 | 13 |
2012-02-13 | Perforation | 479.50 | 482.00 | 13 |
2012-02-13 | Perforation | 512.20 | 513.70 | 13 |
2012-02-13 | Perforation | 528.50 | 529.00 | 13 |
2012-02-13 | Perforation | 537.50 | 539.00 | 13 |
2012-02-13 | Perforation | 554.90 | 555.90 | 13 |
2012-02-13 | Perforation | 586.10 | 586.60 | 13 |
2012-02-13 | Perforation | 290.40 | 290.90 | 13 |
2012-02-13 | Perforation | 598.30 | 598.80 | 13 |
2012-02-13 | Perforation | 639.50 | 644.00 | 13 |
2012-02-13 | Perforation | 864.70 | 865.20 | 13 |
2012-02-13 | Perforation | 869.00 | 869.50 | 13 |
2012-02-13 | Perforation | 873.60 | 874.60 | 13 |
2012-02-13 | Perforation | 875.40 | 876.90 | 13 |
2012-02-13 | Perforation | 877.60 | 878.60 | 13 |
2012-02-19 | Fracture | 324.60 | 878.60 | 0 |
2012-02-13 | Perforation | 325.10 | 325.60 | 13 |
2012-02-13 | Perforation | 329.30 | 329.80 | 13 |
2012-02-13 | Perforation | 339.50 | 340.50 | 13 |
2012-02-13 | Perforation | 354.60 | 355.10 | 13 |
2012-02-13 | Perforation | 362.70 | 363.20 | 13 |
2012-02-13 | Perforation | 389.80 | 390.30 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7381 | 0.0 | 0.0 | 0.0 |
2013 | 8220 | 0.0 | 0.0 | 0.0 |
2014 | 8610 | 0.0 | 0.0 | 0.0 |
2015 | 8715 | 0.0 | 0.0 | 0.0 |
2016 | 8641 | 0.0 | 0.0 | 0.0 |
2017 | 8566 | 0.0 | 0.0 | 0.0 |
2018 | 8448 | 0.0 | 0.0 | 0.0 |
2019 | 8585 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[7]