If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354210907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.990945,"lon":-112.944572,"icon":""}]} |
Location: 00/07-09-035-21W4/0 | |
Location Alias: 00/07-09-35-21 W4M | |
Location Alias 2: 00/07-09-035-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 09 | |
County/Municipality: Red Deer County | |
Well Name: EMBER SD RICH 7-9-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0437425 | |
License Date: 2011-10-04 | |
License Status: Issued | |
Spud Date: 2012-01-26 | |
Final Drill Date: 2012-01-27 | |
Well Total Depth: 905.00 m | |
Surface Hole Latitude: 51.990945 | |
Surface Hole Longitude: -112.944572 |
Date | Event |
---|---|
2011-10-04 | Obtained License |
2012-01-26 | Conductor Casing Operation Performed |
2012-01-26 | Direction Drilling Operation Performed - Deviate |
2012-01-27 | Finished Drilling |
2012-01-27 | Surface Casing Operation Performed |
2012-01-27 | Well Mode changed to Drilled and Cased |
2012-01-28 | Production Casing Operation Performed |
2012-01-28 | Rig Released |
2012-01-31 | Well Log Performed |
2012-02-10 | Perforation Treatment Performed - Jet Perforation |
2012-02-18 | Perforation Treatment Performed - Fractured |
2012-02-24 | Well Began Production |
2012-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-26 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-26 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-10 | Perforation | 331.60 | 332.60 | 13 |
2012-02-10 | Perforation | 405.10 | 406.10 | 13 |
2012-02-10 | Perforation | 417.90 | 418.40 | 13 |
2012-02-10 | Perforation | 422.80 | 423.80 | 13 |
2012-02-10 | Perforation | 426.10 | 428.60 | 13 |
2012-02-10 | Perforation | 445.90 | 446.40 | 13 |
2012-02-10 | Perforation | 450.40 | 450.90 | 13 |
2012-02-10 | Perforation | 451.90 | 452.40 | 13 |
2012-02-10 | Perforation | 456.60 | 458.10 | 13 |
2012-02-10 | Perforation | 459.20 | 462.20 | 13 |
2012-02-10 | Perforation | 462.20 | 464.20 | 13 |
2012-02-10 | Perforation | 335.40 | 335.90 | 13 |
2012-02-10 | Perforation | 489.00 | 490.00 | 13 |
2012-02-10 | Perforation | 491.00 | 492.00 | 13 |
2012-02-10 | Perforation | 504.80 | 505.80 | 13 |
2012-02-10 | Perforation | 513.00 | 514.00 | 13 |
2012-02-10 | Perforation | 528.00 | 529.00 | 13 |
2012-02-10 | Perforation | 557.10 | 557.60 | 13 |
2012-02-10 | Perforation | 558.20 | 558.70 | 13 |
2012-02-10 | Perforation | 568.10 | 568.60 | 13 |
2012-02-10 | Perforation | 590.00 | 593.00 | 13 |
2012-02-10 | Perforation | 605.50 | 608.50 | 13 |
2012-02-10 | Perforation | 349.70 | 351.20 | 13 |
2012-02-10 | Perforation | 610.50 | 612.50 | 13 |
2012-02-10 | Perforation | 818.80 | 819.30 | 13 |
2012-02-10 | Perforation | 825.20 | 825.70 | 13 |
2012-02-10 | Perforation | 828.50 | 830.00 | 13 |
2012-02-10 | Perforation | 830.50 | 833.00 | 13 |
2012-02-10 | Perforation | 834.20 | 834.70 | 13 |
2012-02-10 | Perforation | 836.10 | 837.10 | 13 |
2012-02-18 | Fracture | 331.60 | 837.10 | 0 |
2012-02-10 | Perforation | 356.90 | 357.40 | 13 |
2012-02-10 | Perforation | 361.90 | 362.40 | 13 |
2012-02-10 | Perforation | 370.50 | 373.00 | 13 |
2012-02-10 | Perforation | 382.20 | 383.20 | 13 |
2012-02-10 | Perforation | 389.00 | 392.00 | 13 |
2012-02-10 | Perforation | 398.60 | 401.60 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7357 | 0.0 | 0.0 | 0.0 |
2013 | 8524 | 0.0 | 0.0 | 0.0 |
2014 | 8610 | 0.0 | 0.0 | 0.0 |
2015 | 8715 | 0.0 | 0.0 | 0.0 |
2016 | 8641 | 0.0 | 0.0 | 0.0 |
2017 | 8566 | 0.0 | 0.0 | 0.0 |
2018 | 8448 | 0.0 | 0.0 | 0.0 |
2019 | 8585 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[7]