If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354210307020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.972434,"lon":-112.920658,"icon":""}]} |
Location: 02/07-03-035-21W4/0 | |
Location Alias: 02/07-03-35-21 W4M | |
Location Alias 2: 02/07-03-035-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 21 | |
Section: 03 | |
County/Municipality: Red Deer County | |
Well Name: EMBER 102 RICH 7-3-35-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425523 | |
License Date: 2010-11-04 | |
License Status: Issued | |
Spud Date: 2010-12-10 | |
Final Drill Date: 2010-12-12 | |
Well Total Depth: 702.00 m | |
Surface Hole Latitude: 51.972434 | |
Surface Hole Longitude: -112.920658 |
Date | Event |
---|---|
2010-11-04 | Obtained License |
2010-12-10 | Surface Casing Operation Performed |
2010-12-12 | Finished Drilling |
2010-12-12 | Production Casing Operation Performed |
2010-12-12 | Rig Released |
2010-12-12 | Well Mode changed to Drilled and Cased |
2011-01-03 | Well Log Performed |
2011-01-26 | Perforation Treatment Performed - Jet Perforation |
2011-02-08 | Perforation Treatment Performed - Fractured |
2011-02-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-11 | Well Mode changed to Testing |
2011-02-15 | Well Began Production |
2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-26 | Perforation | 278.90 | 279.40 | 13 |
2011-01-26 | Perforation | 216.60 | 217.10 | 13 |
2011-01-26 | Perforation | 218.30 | 220.80 | 13 |
2011-01-26 | Perforation | 208.70 | 209.70 | 13 |
2011-01-26 | Perforation | 210.50 | 211.50 | 13 |
2011-01-26 | Perforation | 237.70 | 238.20 | 13 |
2011-01-26 | Perforation | 244.90 | 246.40 | 13 |
2011-01-26 | Perforation | 225.30 | 226.30 | 13 |
2011-01-26 | Perforation | 229.10 | 230.10 | 13 |
2011-01-26 | Perforation | 415.60 | 416.60 | 13 |
2011-01-26 | Perforation | 444.60 | 445.10 | 13 |
2011-01-26 | Perforation | 280.80 | 283.30 | 13 |
2011-01-26 | Perforation | 683.00 | 685.00 | 13 |
2011-01-26 | Perforation | 404.10 | 404.60 | 13 |
2011-01-26 | Perforation | 641.30 | 641.80 | 13 |
2011-01-26 | Perforation | 668.30 | 669.30 | 13 |
2011-01-26 | Perforation | 637.50 | 638.50 | 13 |
2011-01-26 | Perforation | 638.90 | 639.40 | 13 |
2011-01-26 | Perforation | 375.90 | 376.90 | 13 |
2011-01-26 | Perforation | 358.20 | 359.70 | 13 |
2011-01-26 | Perforation | 353.40 | 353.90 | 13 |
2011-01-26 | Perforation | 352.40 | 352.90 | 13 |
2011-01-26 | Perforation | 262.80 | 263.80 | 13 |
2011-01-26 | Perforation | 407.00 | 409.00 | 13 |
2011-01-26 | Perforation | 383.00 | 386.00 | 13 |
2011-01-26 | Perforation | 233.30 | 236.30 | 13 |
2011-02-08 | Fracture | 208.70 | 376.90 | 0 |
2011-02-08 | Fracture | 233.30 | 409.00 | 0 |
2011-02-08 | Fracture | 404.10 | 669.30 | 0 |
2011-01-26 | Perforation | 273.40 | 274.40 | 13 |
2011-01-26 | Perforation | 309.00 | 314.50 | 13 |
2011-01-26 | Perforation | 336.90 | 337.90 | 13 |
2011-01-26 | Perforation | 302.80 | 304.80 | 13 |
2011-01-26 | Perforation | 306.80 | 308.30 | 13 |
2011-01-26 | Perforation | 257.80 | 260.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7675 | 0.0 | 0.0 | 0.0 |
2012 | 8545 | 0.0 | 0.0 | 0.0 |
2013 | 8572 | 0.0 | 0.0 | 0.0 |
2014 | 8610 | 0.0 | 0.0 | 0.0 |
2015 | 8715 | 0.0 | 0.0 | 0.0 |
2016 | 8641 | 0.0 | 0.0 | 0.0 |
2017 | 8566 | 0.0 | 0.0 | 0.0 |
2018 | 8448 | 0.0 | 0.0 | 0.0 |
2019 | 8585 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]