X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354200312000

Well Details

Well ID: 0354200312000
Loading map...
Location: 00/12-03-035-20W4/0
Location Alias: 00/12-03-35-20 W4M
Location Alias 2: 00/12-03-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 03
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 12-3-35-20
Operator Name: Enhance Energy Inc.
License Number: 0002310
License Date: 1950-11-16
License Status: Abandoned
Spud Date: 1950-11-30
Final Drill Date: 1950-12-29
Well Total Depth: 1628.50 m
Surface Hole Latitude: 51.977346
Surface Hole Longitude: -112.787742

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-16 Obtained License
1950-12-13 Drill Stem Test Performed
1950-12-29 Drill Stem Test Performed
1950-12-29 Finished Drilling
1950-12-29 Well Mode changed to Drilled and Cased
1950-12-31 Production Casing Operation Performed
1951-01-03 Perforation Treatment Performed - Bullet Perforation
1951-01-06 Well Began Production
1951-01-06 Well Fluid changed to Crude Oil
1951-01-06 Well Mode changed to Pumping
1961-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-07 Well Fluid changed to Crude Oil
1966-05-07 Well Mode changed to Flowing
1971-03-31 Perforation Treatment Performed - Cement Squeeze
1971-04-02 Perforation Treatment Performed - Jet Perforation
1971-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-07 Well Fluid changed to Crude Oil
1973-12-07 Well Mode changed to Pumping
1982-10-14 Perforation Treatment Performed - Cement Squeeze
1982-10-20 Perforation Treatment Performed - Jet Perforation
1982-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-17 Well Began Injection
1983-02-17 Well Fluid changed to Solvent
1983-02-17 Well Type changed to Injection
1983-08-03 Well Log Performed
1983-10-04 Well Log Performed
1984-10-02 Well Log Performed
1985-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-24 Well Log Performed
1985-09-25 Well Log Performed
1986-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-06 Well Log Performed
1986-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-22 Well Log Performed
1988-04-19 Well Log Performed
1988-05-10 Well Log Performed
1993-06-12 Perforation Treatment Performed - Cement Squeeze
1993-06-16 Perforation Treatment Performed - Cement Squeeze
1993-06-19 Perforation Treatment Performed - Cement Squeeze
1993-06-22 Well Log Performed
1993-06-23 Perforation Treatment Performed - Jet Perforation
1993-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-01 Well Fluid changed to Water
2000-01-01 Well Type changed to Injection
2000-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-03 Perforation Treatment Performed - Jet Perforation
2000-11-03 Plug Back Performed
2000-11-03 Well Log Performed
2000-11-06 Perforation Treatment Performed - Cement Plug
2000-11-28 Well Abandoned
2000-11-28 Well Fluid changed to Water
2000-11-28 Well Mode changed to Abandoned
2000-11-28 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-01-03 Bullet Perforation 1591.10 1603.20 13
1985-06-14 Acid Treatment 1594.10 1606.30 0
1986-03-21 Acid Treatment 1593.20 1606.30 0
1986-10-11 Acid Treatment 1593.20 1606.30 0
1993-06-12 Cement Squeeze 1593.20 1606.30 0
1993-06-16 Cement Squeeze 1593.20 1606.30 0
1993-06-19 Cement Squeeze 1593.20 1606.30 0
1993-06-23 Perforation 1606.30 1609.30 13
1993-06-24 Acid Treatment 1606.30 1609.30 0
2000-11-03 Packing Device Capped w/Cement 1584.00 1592.00 0
2000-11-03 Perforation 335.00 336.00 13
1961-11-03 Acid Wash 1591.10 1603.20 0
2000-11-06 Cement Plug 193.00 335.00 0
1961-11-03 Acid Treatment 1591.10 1603.20 0
1971-03-31 Cement Squeeze 1597.20 1603.20 0
1971-04-02 Perforation 1593.20 1596.20 7
1971-04-04 Acid Treatment 1593.20 1596.20 0
1982-10-14 Cement Squeeze 1591.10 1597.20 0
1982-10-20 Perforation 1594.10 1606.30 13
1982-11-24 Acid Treatment 1594.10 1606.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1971 4683 0.0 0.0 0.0
1972 8167 0.0 0.0 0.0
1973 7761 0.0 0.0 0.0
1974 5508 0.0 0.0 0.0
1975 6078 0.0 0.0 0.0
1976 8771 0.0 0.0 0.0
1977 8264 0.0 0.0 0.0
1978 8445 0.0 0.0 0.0
1979 8621 0.0 0.0 0.0
1980 312 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References