If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354192006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.017519,"lon":-112.686962,"icon":""}]} |
Location: 00/06-20-035-19W4/0 | |
Location Alias: 00/06-20-35-19 W4M | |
Location Alias 2: 00/06-20-035-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 19 | |
Section: 20 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: EMBER FENNBV 6-20-35-19 | |
Operator Name: Ember Resources Inc. | |
License Number: 0383550 | |
License Date: 2007-10-22 | |
License Status: Amended | |
Spud Date: 2008-10-03 | |
Final Drill Date: 2008-10-04 | |
Well Total Depth: 403.00 m | |
Surface Hole Latitude: 52.017519 | |
Surface Hole Longitude: -112.686962 |
Date | Event |
---|---|
2007-10-22 | Obtained License |
2008-10-03 | Surface Casing Operation Performed |
2008-10-04 | Finished Drilling |
2008-10-04 | Production Casing Operation Performed |
2008-10-04 | Rig Released |
2008-10-04 | Well Mode changed to Drilled and Cased |
2008-10-15 | Well Log Performed |
2008-10-25 | Perforation Treatment Performed - Jet Perforation |
2008-10-25 | Well Log Performed |
2008-10-31 | Perforation Treatment Performed - Fractured |
2008-11-05 | Well Began Production |
2008-11-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-11-05 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-25 | Perforation | 363.10 | 363.60 | 13 |
2008-10-25 | Perforation | 223.00 | 223.50 | 13 |
2008-10-25 | Perforation | 219.40 | 221.90 | 13 |
2008-10-25 | Perforation | 211.70 | 212.20 | 13 |
2008-10-25 | Perforation | 207.80 | 208.30 | 13 |
2008-10-25 | Perforation | 205.70 | 206.70 | 13 |
2008-10-25 | Perforation | 203.10 | 203.60 | 13 |
2008-10-25 | Perforation | 200.30 | 200.80 | 13 |
2008-10-25 | Perforation | 192.50 | 193.50 | 13 |
2008-10-25 | Perforation | 158.30 | 159.30 | 13 |
2008-10-25 | Perforation | 153.00 | 154.50 | 13 |
2008-10-25 | Perforation | 316.90 | 317.40 | 13 |
2008-10-25 | Perforation | 135.20 | 136.20 | 13 |
2008-10-31 | Fracture | 363.10 | 363.60 | 0 |
2008-10-31 | Fracture | 316.90 | 317.40 | 0 |
2008-10-31 | Fracture | 311.10 | 311.60 | 0 |
2008-10-31 | Fracture | 297.30 | 297.80 | 0 |
2008-10-31 | Fracture | 292.80 | 293.30 | 0 |
2008-10-31 | Fracture | 248.10 | 248.60 | 0 |
2008-10-31 | Fracture | 246.40 | 246.90 | 0 |
2008-10-31 | Fracture | 235.50 | 236.00 | 0 |
2008-10-31 | Fracture | 231.20 | 231.70 | 0 |
2008-10-25 | Perforation | 311.10 | 311.60 | 13 |
2008-10-31 | Fracture | 223.00 | 223.50 | 0 |
2008-10-31 | Fracture | 219.40 | 221.90 | 0 |
2008-10-31 | Fracture | 211.70 | 212.20 | 0 |
2008-10-31 | Fracture | 207.80 | 208.30 | 0 |
2008-10-31 | Fracture | 205.70 | 206.70 | 0 |
2008-10-31 | Fracture | 203.10 | 203.60 | 0 |
2008-10-31 | Fracture | 200.30 | 200.80 | 0 |
2008-10-31 | Fracture | 192.50 | 193.50 | 0 |
2008-10-31 | Fracture | 158.30 | 159.30 | 0 |
2008-10-31 | Fracture | 153.00 | 154.50 | 0 |
2008-10-25 | Perforation | 297.30 | 297.80 | 13 |
2008-10-31 | Fracture | 135.20 | 136.20 | 0 |
2008-10-25 | Perforation | 292.80 | 293.30 | 13 |
2008-10-25 | Perforation | 248.10 | 248.60 | 13 |
2008-10-25 | Perforation | 246.40 | 246.90 | 13 |
2008-10-25 | Perforation | 235.50 | 236.00 | 13 |
2008-10-25 | Perforation | 231.20 | 231.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1346 | 0.0 | 0.0 | 0.0 |
2009 | 8363 | 0.0 | 0.0 | 0.0 |
2010 | 8083 | 0.0 | 0.0 | 0.0 |
2011 | 8297 | 0.0 | 0.0 | 0.0 |
2012 | 8702 | 0.0 | 0.0 | 0.0 |
2013 | 5739 | 0.0 | 0.0 | 0.0 |
2014 | 8754 | 0.0 | 0.0 | 0.0 |
2015 | 8700 | 0.0 | 0.0 | 0.0 |
2016 | 8581 | 0.0 | 0.0 | 0.0 |
2017 | 8554 | 0.0 | 0.0 | 0.0 |
2018 | 8567 | 0.0 | 0.0 | 0.0 |
2019 | 8460 | 0.0 | 0.0 | 0.0 |
2020 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[5]