X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354130411032

Well Details

Well ID: 0354130411032
Loading map...
Location: 03/11-04-035-13W4/2
Location Alias: 03/11-04-35-13 W4M
Location Alias 2: 03/11-04-035-13 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 13
Section: 04
County/Municipality: County of Paintearth No. 18
Well Name: FORDEN ENERGY SULLVNLK 11-4-35-13
Operator Name: Forden Energy Inc.
License Number: 0419032
License Date: 2010-03-03
License Status: Suspension
Spud Date: 2010-03-08
Final Drill Date: 2010-03-11
Well Total Depth: 1182.00 m
Surface Hole Latitude: 51.975712
Surface Hole Longitude: -111.807843

For data sources see[1][2]

Well History

Date Event
2010-03-03 Obtained License
2010-03-09 Surface Casing Operation Performed
2010-03-11 Finished Drilling
2010-03-11 Well Mode changed to Drilled and Cased
2010-03-12 Production Casing Operation Performed
2010-03-12 Rig Released
2010-03-12 Well Log Performed
2010-04-28 Perforation Treatment Performed - Jet Perforation
2010-05-13 Perforation Treatment Performed - Jet Perforation
2010-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-15 Perforation Treatment Performed - Jet Perforation
2010-05-15 Plug Back Performed
2010-06-03 Perforation Treatment Performed - Fractured
2010-07-09 Well Began Production
2010-07-09 Well Fluid changed to Crude Oil
2010-07-09 Well Mode changed to Pumping
2011-08-27 Well Fluid changed to Crude Oil
2011-08-27 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-28 Perforation 1156.00 1157.00 7
2010-06-03 Fracture 1099.00 1101.00 0
2010-04-28 Perforation 1153.00 1155.00 7
2010-04-28 Perforation 1147.00 1148.00 7
2010-04-28 Perforation 1132.50 1136.50 7
2010-05-13 Perforation 1127.00 1128.50 17
2010-05-15 Packing Device Capped w/Cement 1117.00 1125.00 0
2010-05-15 Perforation 1104.50 1106.50 13
2010-05-15 Perforation 1099.00 1101.00 13
2010-06-03 Fracture 1104.50 1106.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2565 0.0 0.0 0.0
2011 523 0.0 0.0 0.0

For data sources see[5]

References