X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354101415000

Well Details

Well ID: 0354101415000
Loading map...
Location: 00/15-14-035-10W4/0
Location Alias: 00/15-14-35-10 W4M
Location Alias 2: 00/15-14-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: PAI PROVO 15-14-35-10
Operator Name: Pembina NGL Corporation
License Number: 0022055
License Date: 1962-02-06
License Status: Abandoned
Spud Date: 1962-04-25
Final Drill Date: 1962-04-29
Well Total Depth: 912.30 m
Surface Hole Latitude: 52.010361
Surface Hole Longitude: -111.322518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-06 Obtained License
1962-04-29 Finished Drilling
1962-04-29 Well Mode changed to Drilled and Cased
1962-04-30 Drill Stem Test Performed
1962-05-01 Production Casing Operation Performed
1962-05-29 Perforation Treatment Performed - Jet Perforation
1962-06-18 Perforation Treatment Performed - Fractured
1962-08-14 Well Began Production
1962-08-14 Well Fluid changed to Crude Oil
1962-08-14 Well Mode changed to Pumping
1962-10-28 Perforation Treatment Performed - Condensate Squeeze
1962-11-06 Well Began Injection
1962-11-06 Well Fluid changed to Water
1962-11-06 Well Type changed to Injection
1968-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-31 Perforation Treatment Performed - Condensate Squeeze
1971-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-16 Perforation Treatment Performed - Chemical Squeeze
1972-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-27 Perforation Treatment Performed - Chemical Squeeze
1976-06-27 Perforation Treatment Performed - Chemical Squeeze
1990-11-12 Well Log Performed
1990-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-13 Perforation Treatment Performed - Jet Perforation
1990-11-13 Plug Back Performed
1990-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-14 Perforation Treatment Performed - Cement Plug
1990-11-14 Perforation Treatment Performed - Jet Perforation
1990-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-15 Perforation Treatment Performed - Cement Plug
1990-11-15 Perforation Treatment Performed - Jet Perforation
1990-11-15 Perforation Treatment Performed - Remedial Casing
1990-11-15 Well Abandoned
1990-11-15 Well Fluid changed to Water
1990-11-15 Well Mode changed to Abandoned
1990-11-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-05-29 Perforation 883.90 884.20 13
1972-07-18 Acid Treatment 883.90 885.10 0
1973-08-27 Acid Treatment 883.90 885.10 0
1974-11-07 Acid Treatment 883.60 885.10 0
1975-10-27 Acid Treatment 883.60 885.10 0
1975-10-27 Chemical Squeeze 883.60 885.10 0
1976-06-27 Chemical Squeeze 883.60 885.10 0
1990-11-13 Packing Device Capped w/Cement 867.00 875.00 0
1990-11-13 Perforation 274.00 274.50 13
1990-11-14 Acid Treatment 274.00 274.50 0
1990-11-14 Cement Plug 249.00 299.50 0
1962-05-29 Perforation 884.50 885.10 13
1990-11-14 Perforation 220.00 220.50 13
1990-11-15 Acid Treatment 220.00 220.50 0
1990-11-15 Cement Plug 195.00 245.50 0
1990-11-15 Perforation 120.00 120.50 13
1990-11-15 Acid Treatment 120.00 120.50 0
1990-11-15 Remedial Casing Cementing 120.00 120.50 0
1962-06-18 Fracture 883.90 885.10 0
1962-10-28 Condensate Squeeze 883.90 885.10 0
1968-02-13 Acid Treatment 883.90 885.10 0
1971-03-22 Acid Treatment 883.90 885.10 0
1971-03-31 Condensate Squeeze 883.90 885.10 0
1971-07-08 Acid Treatment 883.90 885.10 0
1972-03-16 Chemical Squeeze 883.90 885.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References