X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354101413000

Well Details

Well ID: 0354101413000
Loading map...
Location: 00/13-14-035-10W4/0
Location Alias: 00/13-14-35-10 W4M
Location Alias 2: 00/13-14-035-10 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 10
Section: 14
County/Municipality: County of Paintearth No. 18
Well Name: PAI PROVO 13-14-35-10
Operator Name: Pembina NGL Corporation
License Number: 0030808
License Date: 1966-08-10
License Status: Abandoned
Spud Date: 1966-09-01
Final Drill Date: 1966-09-04
Well Total Depth: 905.30 m
Surface Hole Latitude: 52.010303
Surface Hole Longitude: -111.335026

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-10 Obtained License
1966-09-04 Finished Drilling
1966-09-05 Production Casing Operation Performed
1966-10-15 Perforation Treatment Performed - Fractured
1966-10-15 Perforation Treatment Performed - Jet Perforation
1967-07-21 Well Mode changed to Drilled and Cased
1968-04-17 Well Began Production
1968-04-17 Well Fluid changed to Crude Oil
1968-04-17 Well Mode changed to Pumping
1969-08-26 Well Began Injection
1969-08-26 Well Fluid changed to Water
1969-08-26 Well Type changed to Injection
1971-03-31 Perforation Treatment Performed - Condensate Squeeze
1972-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-01 Well Fluid changed to Water
1985-05-01 Well Mode changed to Suspended
1985-05-01 Well Type changed to Injection
1990-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-09 Perforation Treatment Performed - Jet Perforation
1990-11-09 Plug Back Performed
1990-11-09 Well Fluid changed to Water
1990-11-09 Well Log Performed
1990-11-09 Well Mode changed to Abandoned
1990-11-09 Well Type changed to Injection
1990-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-10 Perforation Treatment Performed - Cement Plug
1990-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-11 Perforation Treatment Performed - Cement Plug
1990-11-11 Perforation Treatment Performed - Jet Perforation
1990-11-11 Well Log Performed
1990-11-12 Perforation Treatment Performed - Remedial Casing
1990-11-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-15 Perforation 881.50 883.60 13
1990-11-10 Acid Treatment 271.00 272.00 0
1990-11-10 Cement Plug 257.00 300.20 0
1990-11-11 Perforation 220.00 221.00 13
1990-11-11 Acid Treatment 220.00 221.00 0
1990-11-11 Cement Plug 195.00 252.20 0
1990-11-11 Perforation 115.00 116.00 13
1990-11-12 Remedial Casing Cementing 115.00 116.00 0
1966-10-15 Fracture 881.50 883.60 0
1971-03-31 Condensate Squeeze 881.50 883.60 0
1972-04-20 Acid Treatment 881.50 883.60 0
1973-10-04 Acid Treatment 881.50 883.60 0
1974-11-19 Acid Treatment 881.50 883.60 0
1975-10-27 Acid Treatment 881.50 883.60 0
1990-11-09 Packing Device Capped w/Cement 852.00 860.00 0
1990-11-09 Perforation 271.00 272.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 7 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References