X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354093403020

Well Details

Well ID: 0354093403020
Loading map...
Location: 02/03-34-035-09W4/0
Location Alias: 02/03-34-35-09 W4M
Location Alias 2: 02/03-34-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 34
County/Municipality: Special Areas No. 4
Well Name: KARVE 102 HZ PROVOST 3-34-35-9
Operator Name: Karve Energy Inc.
License Number: 0489328
License Date: 2018-05-30
License Status: Issued
Spud Date: 2018-07-16
Final Drill Date: 2018-07-17
Well Total Depth: 1617.00 m
Surface Hole Latitude: 52.047873
Surface Hole Longitude: -111.202757

For data sources see[1][2]

Well History

Date Event
2018-05-30 Obtained License
2018-07-16 Surface Casing Operation Performed
2018-07-17 Direction Drilling Operation Performed - Deviate
2018-07-17 Direction Drilling Operation Performed - Horizontal
2018-07-17 Finished Drilling
2018-07-17 Well Log Performed
2018-07-17 Well Mode changed to Drilled and Cased
2018-07-18 Production Casing Operation Performed
2018-07-18 Rig Released
2018-07-18 Well Log Performed
2018-07-20 Well Log Performed
2018-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-13 Well Began Production
2018-08-13 Well Fluid changed to Crude Oil
2018-08-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-16 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-17 625.10 Deviate (5 - 79 degrees)
2018-07-17 997.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-30 Multi-Stage Fracture 1580.00 1580.10 0
2018-07-30 Multi-Stage Fracture 1333.90 1334.00 0
2018-07-30 Multi-Stage Fracture 1310.20 1310.30 0
2018-07-30 Multi-Stage Fracture 1275.00 1275.10 0
2018-07-30 Multi-Stage Fracture 1251.30 1251.40 0
2018-07-30 Multi-Stage Fracture 1216.10 1216.20 0
2018-07-30 Multi-Stage Fracture 1181.00 1181.10 0
2018-07-30 Multi-Stage Fracture 1145.80 1145.90 0
2018-07-30 Multi-Stage Fracture 1122.10 1122.20 0
2018-07-30 Multi-Stage Fracture 1098.70 1098.80 0
2018-07-30 Multi-Stage Fracture 1074.90 1075.00 0
2018-07-30 Multi-Stage Fracture 1556.30 1556.40 0
2018-07-30 Multi-Stage Fracture 1051.30 1051.40 0
2018-07-30 Multi-Stage Fracture 1532.80 1532.90 0
2018-07-30 Multi-Stage Fracture 1509.20 1509.30 0
2018-07-30 Multi-Stage Fracture 1485.60 1485.70 0
2018-07-30 Multi-Stage Fracture 1450.50 1450.60 0
2018-07-30 Multi-Stage Fracture 1404.00 1404.10 0
2018-07-30 Multi-Stage Fracture 1380.70 1380.80 0
2018-07-30 Multi-Stage Fracture 1357.50 1357.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-30 2018-07-30 912 647 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 70.6839 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 28.4873 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0114 N/A
Methyl Alcohol 67-56-1 100 0.0114 N/A
Non-Hazardous Ingredients Not Available 100 0.0114 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0674 N/A
Sodium chloride 7647-14-5 100 0.0674 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.0984 N/A
Non-Hazardous Ingredients Not Available 100 0.0984 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1088 N/A
Water 7732-18-5 100 0.1088 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0466 N/A
Non-Hazardous Ingredients Not Available 100 0.0466 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0466 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3679 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3679 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.1279 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.1279 N/A
Methanol 67-56-1 100 0.1279 N/A
Monoethanolamine 141-43-5 100 0.1279 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.1279 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.1279 N/A
Water 7732-18-5 100 0.1279 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-20 2018-07-20 Municipal Water 160
2018-07-20 2018-07-20 Central Water Distribution Facility 26
2018-07-20 2018-07-20 Central Water Distribution Facility 115
2018-07-20 2018-07-20 Central Water Distribution Facility 40
2018-07-20 2018-07-20 Central Water Distribution Facility 195
2018-07-20 2018-07-20 Central Water Distribution Facility 175

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3400 0.0 0.0 0.0
2019 8572 0.0 0.0 0.0
2020 2067 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-18 No Incident Encountered 0.00 0.00
2018-08-13 No Incident Encountered 0.00 0.00

For data sources see[10]

References