If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354092609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.035524,"lon":-111.174721,"icon":""}]} |
Location: 00/09-26-035-09W4/0 | |
Location Alias: 00/09-26-35-09 W4M | |
Location Alias 2: 00/09-26-035-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 26 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL PROVOST 9-26-35-9 | |
Operator Name: Karve Energy Inc. | |
License Number: 0442467 | |
License Date: 2012-01-06 | |
License Status: Issued | |
Spud Date: 2012-01-17 | |
Final Drill Date: 2012-01-19 | |
Well Total Depth: 946.00 m | |
Surface Hole Latitude: 52.035524 | |
Surface Hole Longitude: -111.174721 |
Date | Event |
---|---|
2012-01-06 | Obtained License |
2012-01-17 | Surface Casing Operation Performed |
2012-01-19 | Finished Drilling |
2012-01-19 | Well Log Performed |
2012-01-19 | Well Mode changed to Drilled and Cased |
2012-01-20 | Production Casing Operation Performed |
2012-01-20 | Rig Released |
2012-01-27 | Well Log Performed |
2012-01-29 | Perforation Treatment Performed - Jet Perforation |
2012-02-13 | Perforation Treatment Performed - Fractured |
2012-06-01 | Well Began Production |
2012-06-01 | Well Fluid changed to Crude Oil |
2012-06-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-17 | Akita Drilling Ltd. | 4 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-29 | Perforation | 902.50 | 906.50 | 17 |
2012-01-29 | Perforation | 907.50 | 912.50 | 17 |
2012-02-13 | Fracture | 902.50 | 912.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4858 | 0.0 | 0.0 | 0.0 |
2013 | 8729 | 0.0 | 0.0 | 0.0 |
2014 | 8724 | 0.0 | 0.0 | 0.0 |
2015 | 8669 | 0.0 | 0.0 | 0.0 |
2016 | 8526 | 0.0 | 0.0 | 0.0 |
2017 | 7400 | 0.0 | 0.0 | 0.0 |
2018 | 8729 | 0.0 | 0.0 | 0.0 |
2019 | 8622 | 0.0 | 0.0 | 0.0 |
2020 | 2048 | 0.0 | 0.0 | 0.0 |
For data sources see[6]