X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354091415000

Well Details

Well ID: 0354091415000
Loading map...
Location: 00/15-14-035-09W4/0
Location Alias: 00/15-14-35-09 W4M
Location Alias 2: 00/15-14-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 14
County/Municipality: Special Areas No. 4
Well Name: ENERPLUS ET AL PROVO 15-14-35-9
Operator Name: Enerplus Corporation
License Number: 0036230
License Date: 1969-05-22
License Status: RecCertified
Spud Date: 1969-05-26
Final Drill Date: 1969-06-01
Well Total Depth: 1189.90 m
Surface Hole Latitude: 52.009962
Surface Hole Longitude: -111.179791

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-22 Obtained License
1969-06-01 Finished Drilling
1969-06-01 Well Mode changed to Drilled and Cased
1969-06-02 Drill Stem Test Performed
1969-06-02 Production Casing Operation Performed
1969-09-28 Perforation Treatment Performed - Cement Squeeze
1969-09-28 Perforation Treatment Performed - Jet Perforation
1969-10-01 Perforation Treatment Performed - Jet Perforation
1969-10-28 Perforation Treatment Performed - Fractured
1969-11-07 Well Began Production
1969-11-07 Well Fluid changed to Crude Oil
1969-11-07 Well Mode changed to Flowing
1989-10-01 Well Fluid changed to Crude Oil
1989-10-01 Well Mode changed to Suspended
1993-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-07 Perforation Treatment Performed - Cement Plug
1993-10-07 Perforation Treatment Performed - Jet Perforation
1993-10-07 Perforation Treatment Performed - Remedial Casing
1993-10-07 Plug Back Performed
1993-10-07 Well Abandoned
1993-10-07 Well Fluid changed to Crude Oil
1993-10-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-28 Perforation 1126.50 1129.00 7
1969-09-28 Perforation 1130.20 1132.00 7
1969-09-28 Cement Squeeze 1126.50 1132.00 0
1969-10-01 Perforation 913.40 914.40 7
1969-10-28 Fracture 913.40 914.40 0
1993-10-07 Packing Device Capped w/Cement 892.00 900.00 0
1993-10-07 Perforation 347.50 356.50 13
1993-10-07 Remedial Casing Cementing 347.50 356.50 0
1993-10-07 Cement Plug 204.00 357.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 648 0.0 0.0 0.0
1970 7421 0.0 0.0 0.0
1971 8417 0.0 0.0 0.0
1972 8363 0.0 0.0 0.0
1973 8602 0.0 0.0 0.0
1974 8711 0.0 0.0 0.0
1975 8496 0.0 0.0 0.0
1976 8704 0.0 0.0 0.0
1977 8539 0.0 0.0 0.0
1978 8289 0.0 0.0 0.0
1979 8748 0.0 0.0 0.0
1980 8681 0.0 0.0 0.0
1981 8611 0.0 0.0 0.0
1982 8592 0.0 0.0 0.0
1983 8523 0.0 0.0 0.0
1984 7584 0.0 0.0 0.0
1985 5486 0.0 0.0 0.0
1986 8735 0.0 0.0 0.0
1987 8685 0.0 0.0 0.0
1988 8327 0.0 0.0 0.0
1989 3067 0.0 0.0 0.0

For data sources see[5]

References