X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090914000

Well Details

Well ID: 0354090914000
Loading map...
Location: 00/14-09-035-09W4/0
Location Alias: 00/14-09-35-09 W4M
Location Alias 2: 00/14-09-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 09
County/Municipality: Special Areas No. 4
Well Name: ACL PROVOST 14-9-35-9
Operator Name: Karve Energy Inc.
License Number: 0287805
License Date: 2003-05-30
License Status: Suspension
Spud Date: 2003-07-07
Final Drill Date: 2003-07-11
Well Total Depth: 1103.00 m
Surface Hole Latitude: 51.996698
Surface Hole Longitude: -111.235814

For data sources see[1][2]

Well History

Date Event
2003-05-30 Obtained License
2003-07-08 Surface Casing Operation Performed
2003-07-11 Finished Drilling
2003-07-11 Well Mode changed to Drilled and Cased
2003-07-12 Well Log Performed
2003-07-15 Drill Stem Test Performed
2003-07-15 Production Casing Operation Performed
2003-07-16 Rig Released
2003-09-13 Perforation Treatment Performed - Jet Perforation
2003-09-13 Well Log Performed
2003-09-17 Perforation Treatment Performed - Fractured
2003-10-25 Well Began Production
2003-10-25 Well Fluid changed to Crude Oil
2003-10-25 Well Mode changed to Pumping
2010-07-01 Well Fluid changed to Crude Oil
2010-07-01 Well Mode changed to Suspended
2013-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-20 Plug Back Performed
2013-07-20 Well Fluid changed to Crude Oil
2013-07-20 Well Log Performed
2013-07-20 Well Mode changed to Abandoned Zone
2013-07-21 Perforation Treatment Performed - Jet Perforation
2013-07-21 Well Log Performed
2013-10-02 Perforation Treatment Performed - Jet Perforation
2013-10-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-13 Perforation 901.00 903.00 17
2003-09-17 Fracture 901.00 903.00 0
2013-07-20 Packing Device Capped w/Cement 889.00 897.00 0
2013-07-21 Perforation 393.00 395.00 17
2013-07-21 Perforation 396.00 397.00 17
2013-07-21 Perforation 398.00 399.00 17
2013-07-21 Perforation 400.00 405.00 17
2013-10-02 Perforation 318.40 325.70 17
2013-10-02 Perforation 335.00 340.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 72 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-22 No Incident Encountered 0.00 0.00
2013-10-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References