If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354090802002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.984855,"lon":-111.251753,"icon":""}]} |
Location: 00/02-08-035-09W4/2 | |
Location Alias: 00/02-08-35-09 W4M | |
Location Alias 2: 00/02-08-035-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 09 | |
Section: 08 | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: BLUENOSE ET AL HAMIL 2-8-35-9 | |
Operator Name: Devon Canada Corporation | |
License Number: 0034553 | |
License Date: 1968-08-01 | |
License Status: RecCertified | |
Spud Date: 1968-08-16 | |
Final Drill Date: 1968-08-19 | |
Well Total Depth: 921.10 m | |
Surface Hole Latitude: 51.984855 | |
Surface Hole Longitude: -111.251753 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-04-12 | Perforation Treatment Performed - Open-Hole Completion |
1956-11-16 | Perforation Treatment Performed - Cement Plug |
1968-08-01 | Obtained License |
1968-08-19 | Finished Drilling |
1968-08-19 | Well Mode changed to Drilled and Cased |
1970-03-26 | Perforation Treatment Performed - Jet Perforation |
1970-03-26 | Well Began Injection |
1970-03-26 | Well Fluid changed to Water |
1970-03-26 | Well Type changed to Injection |
1973-09-12 | Perforation Treatment Performed - Cement Plug |
1973-09-12 | Well Abandoned |
1973-09-12 | Well Fluid changed to Water |
1973-09-12 | Well Mode changed to Abandoned |
1973-09-12 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-04-12 | Open Hole/Barefoot Completion | 893.40 | 902.20 | 0 |
1956-11-16 | Cement Plug | 869.90 | 899.20 | 0 |
1970-03-26 | Perforation | 899.20 | 901.30 | 13 |
1973-09-12 | Cement Plug | 800.10 | 877.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]