X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354090204030

Well Details

Well ID: 0354090204030
Loading map...
Location: 03/04-02-035-09W4/0
Location Alias: 03/04-02-35-09 W4M
Location Alias 2: 03/04-02-035-09 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 09
Section: 02
County/Municipality: Special Areas No. 4
Well Name: KARVE 103 HZ PROVOST 4-2-35-9
Operator Name: Karve Energy Inc.
License Number: 0489718
License Date: 2018-06-25
License Status: Issued
Spud Date: 2018-07-14
Final Drill Date: 2018-07-16
Well Total Depth: 1684.00 m
Surface Hole Latitude: 51.976556
Surface Hole Longitude: -111.197445

For data sources see[1][2]

Well History

Date Event
2018-06-25 Obtained License
2018-07-14 Surface Casing Operation Performed
2018-07-15 Direction Drilling Operation Performed - Deviate
2018-07-15 Direction Drilling Operation Performed - Horizontal
2018-07-16 Finished Drilling
2018-07-16 Production Casing Operation Performed
2018-07-16 Rig Released
2018-07-16 Well Log Performed
2018-07-16 Well Mode changed to Drilled and Cased
2018-07-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-19 Well Began Production
2018-08-19 Well Fluid changed to Crude Oil
2018-08-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-14 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-15 569.80 Deviate (5 - 79 degrees)
2018-07-15 1005.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-29 Multi-Stage Fracture 1625.30 1625.40 0
2018-07-29 Multi-Stage Fracture 1382.30 1382.40 0
2018-07-29 Multi-Stage Fracture 1347.90 1348.00 0
2018-07-29 Multi-Stage Fracture 1313.80 1313.90 0
2018-07-29 Multi-Stage Fracture 1279.20 1279.30 0
2018-07-29 Multi-Stage Fracture 1244.10 1244.20 0
2018-07-29 Multi-Stage Fracture 1209.00 1209.10 0
2018-07-29 Multi-Stage Fracture 1174.10 1174.20 0
2018-07-29 Multi-Stage Fracture 1139.30 1139.40 0
2018-07-29 Multi-Stage Fracture 1104.50 1104.60 0
2018-07-29 Multi-Stage Fracture 1070.30 1070.40 0
2018-07-29 Multi-Stage Fracture 1602.10 1602.20 0
2018-07-29 Multi-Stage Fracture 1579.10 1579.20 0
2018-07-29 Multi-Stage Fracture 1555.90 1556.00 0
2018-07-29 Multi-Stage Fracture 1532.70 1532.80 0
2018-07-29 Multi-Stage Fracture 1509.30 1509.40 0
2018-07-29 Multi-Stage Fracture 1486.30 1486.40 0
2018-07-29 Multi-Stage Fracture 1451.80 1451.90 0
2018-07-29 Multi-Stage Fracture 1416.90 1417.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-29 2018-07-29 899 651 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 70.8382 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 28.3281 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0108 N/A
Methyl Alcohol 67-56-1 100 0.0108 N/A
Non-Hazardous Ingredients Not Available 100 0.0108 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.1175 N/A
Sodium chloride 7647-14-5 100 0.1175 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1016 N/A
Non-Hazardous Ingredients Not Available 100 0.1016 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1046 N/A
Water 7732-18-5 100 0.1046 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0467 N/A
Non-Hazardous Ingredients Not Available 100 0.0467 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0467 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3707 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3707 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0814 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0814 N/A
Methanol 67-56-1 100 0.0814 N/A
Monoethanolamine 141-43-5 100 0.0814 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0814 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0814 N/A
Water 7732-18-5 100 0.0814 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-24 2018-07-24 Municipal Water 448
2018-07-24 2018-07-24 Municipal Water 238
2018-07-24 2018-07-24 Central Water Distribution Facility 105
2018-07-24 2018-07-24 Central Water Distribution Facility 56

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3192 0.0 0.0 0.0
2019 8304 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-16 No Incident Encountered 0.00 0.00
2018-08-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References