X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354083001000

Well Details

Well ID: 0354083001000
Loading map...
Location: 00/01-30-035-08W4/0
Location Alias: 00/01-30-35-08 W4M
Location Alias 2: 00/01-30-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 30
County/Municipality: Special Areas No. 4
Well Name: KARVE HZ PROVOST 1-30-35-8
Operator Name: Karve Energy Inc.
License Number: 0482609
License Date: 2017-01-27
License Status: Issued
Spud Date: 2017-03-09
Final Drill Date: 2017-03-11
Well Total Depth: 2113.00 m
Surface Hole Latitude: 52.039623
Surface Hole Longitude: -111.126376

For data sources see[1][2]

Well History

Date Event
2017-01-27 Obtained License
2017-03-10 Direction Drilling Operation Performed - Deviate
2017-03-10 Surface Casing Operation Performed
2017-03-11 Direction Drilling Operation Performed - Horizontal
2017-03-11 Finished Drilling
2017-03-11 Well Log Performed
2017-03-11 Well Mode changed to Drilled and Cased
2017-03-12 Production Casing Operation Performed
2017-03-12 Well Log Performed
2017-03-13 Rig Released
2017-03-14 Well Log Performed
2017-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-09 Well Began Production
2017-04-09 Well Fluid changed to Crude Oil
2017-04-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-03-09 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-10 667.80 Deviate (5 - 79 degrees)
2017-03-11 965.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-04-02 Multi-Stage Fracture 2073.60 2073.70 0
2017-04-02 Multi-Stage Fracture 1738.80 1738.90 0
2017-04-02 Multi-Stage Fracture 1713.20 1713.30 0
2017-04-02 Multi-Stage Fracture 1641.20 1641.30 0
2017-04-02 Multi-Stage Fracture 1603.90 1604.00 0
2017-04-02 Multi-Stage Fracture 1566.70 1566.80 0
2017-04-02 Multi-Stage Fracture 1529.50 1529.60 0
2017-04-02 Multi-Stage Fracture 1492.30 1492.40 0
2017-04-02 Multi-Stage Fracture 1455.10 1455.20 0
2017-04-02 Multi-Stage Fracture 1417.90 1418.00 0
2017-04-02 Multi-Stage Fracture 1380.70 1380.80 0
2017-04-02 Multi-Stage Fracture 2037.40 2037.50 0
2017-04-02 Multi-Stage Fracture 1343.40 1343.50 0
2017-04-03 Multi-Stage Fracture 1306.10 1306.20 0
2017-04-03 Multi-Stage Fracture 1280.60 1280.70 0
2017-04-03 Multi-Stage Fracture 1243.30 1243.40 0
2017-04-03 Multi-Stage Fracture 1206.10 1206.20 0
2017-04-03 Multi-Stage Fracture 1168.80 1168.90 0
2017-04-03 Multi-Stage Fracture 1120.00 1120.10 0
2017-04-03 Multi-Stage Fracture 1094.40 1094.50 0
2017-04-03 Multi-Stage Fracture 1057.10 1057.20 0
2017-04-03 Multi-Stage Fracture 1028.50 1028.60 0
2017-04-02 Multi-Stage Fracture 2000.10 2000.20 0
2017-04-02 Multi-Stage Fracture 1962.80 1962.90 0
2017-04-02 Multi-Stage Fracture 1937.10 1937.20 0
2017-04-02 Multi-Stage Fracture 1876.60 1876.70 0
2017-04-02 Multi-Stage Fracture 1839.30 1839.40 0
2017-04-02 Multi-Stage Fracture 1813.60 1813.70 0
2017-04-02 Multi-Stage Fracture 1776.20 1776.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-02 2017-04-03 876 845 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 69.1151 N/A
16/30 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 19.006 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 11.8788 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0143 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0143 N/A
ELEGB-2 Element Breaker Ethylene Glycol 80/20 107-21-1 100 0 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1635 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.1635 N/A
ELEBX-2 Element Crosslinker Boric acid. sodium salt 1333-73-9 100 0.0981 N/A
Ethylene glycol 107-21-1 100 0.0981 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0981 N/A
ELEWG-12 Element Gelling Agent Distillates (petroleum). hydrotreated light 64742-47-8 100 0.3433 N/A
Guar 9000-30-0 100 0.3433 N/A
Hydrotreated light paraffinic distillate 64742-55-8 100 0.3433 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche
d
127087-87-0 100 0.3433 N/A
ELEFE-1 IFTR Element Surfactant Alcohols. C9-11. ethoxylated 68439-46-3 100 0.0735 N/A
Methanol 67-56-1 100 0.0735 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0735 N/A
Poly(oxy-1.2-ethanediyl). alpha-undecyl-omega-hydroxy- 34398-01-1 100 0.0735 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-30 2017-03-31 Municipal Water 405
2017-03-30 2017-03-30 Central Water Distribution Facility 120
2017-03-30 2017-03-30 Central Water Distribution Facility 410
2017-04-02 2017-04-02 Central Water Distribution Facility 75

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6299 0.0 0.0 0.0
2018 8677 0.0 0.0 0.0
2019 7242 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-13 No Incident Encountered 0.00 0.00
2017-04-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References