X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354080614000

Well Details

Well ID: 0354080614000
Loading map...
Location: 00/14-06-035-08W4/0
Location Alias: 00/14-06-35-08 W4M
Location Alias 2: 00/14-06-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 06
County/Municipality: Special Areas No. 4
Well Name: TAC 8-6 HZ PROVOST 14-6-35-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0489413
License Date: 2018-06-01
License Status: Issued
Spud Date: 2018-06-20
Final Drill Date: 2018-07-08
Well Total Depth: 1893.00 m
Surface Hole Latitude: 51.974292
Surface Hole Longitude: -111.127943

For data sources see[1][2]

Well History

Date Event
2018-06-01 Obtained License
2018-06-20 Surface Casing Operation Performed
2018-07-07 Direction Drilling Operation Performed - Deviate
2018-07-07 Direction Drilling Operation Performed - Horizontal
2018-07-08 Finished Drilling
2018-07-08 Production Casing Operation Performed
2018-07-08 Well Log Performed
2018-07-08 Well Mode changed to Drilled and Cased
2018-07-09 Rig Released
2018-07-10 Perforation Treatment Performed - Jet Perforation
2018-07-23 Perforation Treatment Performed - Fractured
2018-08-02 Well Began Production
2018-08-02 Well Fluid changed to Crude Oil
2018-08-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-07 Tempco Drilling Company Inc. 5 N/A Drill To LD
2018-06-20 Predator Drilling Inc. 27 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-07 219.30 Deviate (5 - 79 degrees)
2018-07-07 1052.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-10 Perforation 1870.00 1870.50 20
2018-07-10 Perforation 1551.00 1551.50 20
2018-07-10 Perforation 1516.00 1516.50 20
2018-07-10 Perforation 1478.00 1478.50 20
2018-07-10 Perforation 1443.00 1443.50 20
2018-07-10 Perforation 1408.00 1408.50 20
2018-07-10 Perforation 1373.00 1373.50 20
2018-07-10 Perforation 1338.00 1338.50 20
2018-07-10 Perforation 1303.00 1303.50 20
2018-07-10 Perforation 1268.00 1268.50 20
2018-07-10 Perforation 1232.00 1232.50 20
2018-07-10 Perforation 1833.00 1833.50 20
2018-07-10 Perforation 1197.00 1197.50 20
2018-07-10 Perforation 1162.00 1162.50 20
2018-07-10 Perforation 1137.00 1137.50 20
2018-07-10 Perforation 1111.00 1111.50 20
2018-07-23 Fracture 1870.00 1870.50 0
2018-07-23 Fracture 1833.00 1833.50 0
2018-07-23 Fracture 1798.00 1798.50 0
2018-07-23 Fracture 1762.00 1762.50 0
2018-07-23 Fracture 1727.00 1727.50 0
2018-07-23 Fracture 1692.00 1692.50 0
2018-07-10 Perforation 1798.00 1798.50 20
2018-07-23 Fracture 1657.00 1657.50 0
2018-07-23 Fracture 1622.00 1622.50 0
2018-07-23 Fracture 1586.00 1586.50 0
2018-07-23 Fracture 1551.00 1551.50 0
2018-07-23 Fracture 1516.00 1516.50 0
2018-07-23 Fracture 1478.00 1478.50 0
2018-07-23 Fracture 1443.00 1443.50 0
2018-07-23 Fracture 1408.00 1408.50 0
2018-07-23 Fracture 1373.00 1373.50 0
2018-07-23 Fracture 1338.00 1338.50 0
2018-07-10 Perforation 1762.00 1762.50 20
2018-07-23 Fracture 1303.00 1303.50 0
2018-07-23 Fracture 1268.00 1268.50 0
2018-07-23 Fracture 1232.00 1232.50 0
2018-07-23 Fracture 1197.00 1197.50 0
2018-07-23 Fracture 1162.00 1162.50 0
2018-07-23 Fracture 1137.00 1137.50 0
2018-07-23 Fracture 1111.00 1111.50 0
2018-07-10 Perforation 1727.00 1727.50 20
2018-07-10 Perforation 1692.00 1692.50 20
2018-07-10 Perforation 1657.00 1657.50 20
2018-07-10 Perforation 1622.00 1622.50 20
2018-07-10 Perforation 1586.00 1586.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-23 2018-07-23 897 767 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 81.9459 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 17.4549 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0543 N/A
water 7732-18-5 100 0.0543 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0237 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1483 N/A
Ethylene glycol 107-21-1 100 0.1483 N/A
Potassium Carbonate 584-08-7 100 0.1483 N/A
Potassium Hydroxide 1310-58-3 100 0.1483 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0201 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.279 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0734 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0734 N/A
water 7732-18-5 100 0.0734 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-13 2018-07-21 Oilfield Produced Water 959
2018-07-13 2018-07-21 Oilfield Produced Water 65
2018-07-13 2018-07-21 Central Water Distribution Facility 23

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3557 0.0 0.0 0.0
2019 8717 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-09 No Incident Encountered 0.00 0.00
2018-07-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References