X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354080611020

Well Details

Well ID: 0354080611020
Loading map...
Location: 02/11-06-035-08W4/0
Location Alias: 02/11-06-35-08 W4M
Location Alias 2: 02/11-06-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 06
County/Municipality: Special Areas No. 4
Well Name: TAC 8-6 HZ 102 PROVOST 11-6-35-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0489411
License Date: 2018-06-01
License Status: Issued
Spud Date: 2018-06-18
Final Drill Date: 2018-06-27
Well Total Depth: 1918.00 m
Surface Hole Latitude: 51.974291
Surface Hole Longitude: -111.128526

For data sources see[1][2]

Well History

Date Event
2018-06-01 Obtained License
2018-06-19 Surface Casing Operation Performed
2018-06-26 Direction Drilling Operation Performed - Deviate
2018-06-26 Direction Drilling Operation Performed - Horizontal
2018-06-27 Finished Drilling
2018-06-27 Production Casing Operation Performed
2018-06-27 Well Log Performed
2018-06-27 Well Mode changed to Drilled and Cased
2018-06-28 Rig Released
2018-07-11 Perforation Treatment Performed - Jet Perforation
2018-07-19 Perforation Treatment Performed - Fractured
2018-08-02 Well Began Production
2018-08-02 Well Fluid changed to Crude Oil
2018-08-02 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-06-13 Predator Drilling Inc. 27 N/A Set Surface
2018-06-18 Predator Drilling Inc. 27 N/A Set Surface
2018-06-26 Tempco Drilling Company Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-06-26 220.70 Deviate (5 - 79 degrees)
2018-06-26 1053.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-11 Perforation 1895.00 1895.50 20
2018-07-11 Perforation 1590.00 1590.50 20
2018-07-11 Perforation 1555.00 1555.50 20
2018-07-11 Perforation 1520.00 1520.50 20
2018-07-11 Perforation 1483.00 1483.50 20
2018-07-11 Perforation 1447.00 1447.50 20
2018-07-11 Perforation 1413.00 1413.50 20
2018-07-11 Perforation 1377.00 1377.50 20
2018-07-11 Perforation 1342.00 1342.50 20
2018-07-11 Perforation 1307.00 1307.50 20
2018-07-11 Perforation 1272.00 1272.50 20
2018-07-11 Perforation 1872.00 1872.50 20
2018-07-11 Perforation 1237.00 1237.50 20
2018-07-11 Perforation 1202.00 1202.50 20
2018-07-11 Perforation 1164.00 1164.50 20
2018-07-11 Perforation 1129.00 1129.50 20
2018-07-19 Fracture 1895.00 1895.50 0
2018-07-19 Fracture 1872.00 1872.50 0
2018-07-19 Fracture 1835.00 1835.50 0
2018-07-19 Fracture 1800.00 1800.50 0
2018-07-19 Fracture 1765.00 1765.50 0
2018-07-19 Fracture 1730.00 1730.50 0
2018-07-11 Perforation 1835.00 1835.50 20
2018-07-19 Fracture 1695.00 1695.50 0
2018-07-19 Fracture 1661.00 1661.50 0
2018-07-19 Fracture 1626.00 1626.50 0
2018-07-19 Fracture 1590.00 1590.50 0
2018-07-19 Fracture 1555.00 1555.50 0
2018-07-19 Fracture 1520.00 1520.50 0
2018-07-19 Fracture 1483.00 1483.50 0
2018-07-19 Fracture 1447.00 1447.50 0
2018-07-19 Fracture 1413.00 1413.50 0
2018-07-19 Fracture 1377.00 1377.50 0
2018-07-11 Perforation 1800.00 1800.50 20
2018-07-19 Fracture 1342.00 1342.50 0
2018-07-19 Fracture 1307.00 1307.50 0
2018-07-19 Fracture 1272.00 1272.50 0
2018-07-19 Fracture 1237.00 1237.50 0
2018-07-19 Fracture 1202.00 1202.50 0
2018-07-19 Fracture 1164.00 1164.50 0
2018-07-19 Fracture 1129.00 1129.50 0
2018-07-11 Perforation 1765.00 1765.50 20
2018-07-11 Perforation 1730.00 1730.50 20
2018-07-11 Perforation 1695.00 1695.50 20
2018-07-11 Perforation 1661.00 1661.50 20
2018-07-11 Perforation 1626.00 1626.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-19 2018-07-19 900 774 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 82.2136 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 17.1695 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0545 N/A
water 7732-18-5 100 0.0545 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0243 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1623 N/A
Ethylene glycol 107-21-1 100 0.1623 N/A
Potassium Carbonate 584-08-7 100 0.1623 N/A
Potassium Hydroxide 1310-58-3 100 0.1623 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0176 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2865 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0714 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0714 N/A
water 7732-18-5 100 0.0714 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-13 2018-07-21 Oilfield Produced Water 958
2018-07-13 2018-07-21 Oilfield Produced Water 64
2018-07-13 2018-07-21 Central Water Distribution Facility 24

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3557 0.0 0.0 0.0
2019 8717 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-06-28 No Incident Encountered 0.00 0.00
2018-07-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References