X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354080512030

Well Details

Well ID: 0354080512030
Loading map...
Location: 03/12-05-035-08W4/0
Location Alias: 03/12-05-35-08 W4M
Location Alias 2: 03/12-05-035-08 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 08
Section: 05
County/Municipality: Special Areas No. 4
Well Name: TAC 16-32 HZ 103 PROVOST 12-5-35-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0494225
License Date: 2019-04-18
License Status: Issued
Spud Date: 2019-06-26
Final Drill Date: 2019-08-10
Well Total Depth: 2563.00 m
Surface Hole Latitude: 51.968077
Surface Hole Longitude: -111.097318

For data sources see[1][2]

Well History

Date Event
2019-04-18 Obtained License
2019-06-26 Set Surface
2019-06-26 Surface Casing Operation Performed
2019-08-09 Direction Drilling Operation Performed - Deviate
2019-08-09 Direction Drilling Operation Performed - Horizontal
2019-08-09 Drill To LD
2019-08-10 Finished Drilling
2019-08-10 Production Casing Operation Performed
2019-08-10 Well Log Performed
2019-08-10 Well Mode changed to Drilled and Cased
2019-08-11 Rig Released
2019-08-20 Perforation Treatment Performed - Jet Perforation
2019-08-23 Perforation Treatment Performed - Fractured
2019-08-24 Perforation Treatment Performed - Fractured
2019-08-30 Well Began Production
2019-08-30 Well Fluid changed to Crude Oil
2019-08-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-08-09 Tempco Drilling Company Inc. 5 Drill To LD
2019-06-26 Predator Drilling Inc. 27 Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-08-09 303.30 Deviate (5 - 79 degrees)
2019-08-09 1193.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-20 Perforation 2538.00 2538.50 20
2019-08-20 Perforation 2215.00 2216.50 20
2019-08-20 Perforation 2173.00 2174.50 20
2019-08-20 Perforation 2015.00 2015.50 20
2019-08-20 Perforation 1976.00 1976.50 20
2019-08-20 Perforation 1943.00 1943.50 20
2019-08-20 Perforation 1908.00 1908.50 20
2019-08-20 Perforation 1876.00 1876.50 20
2019-08-20 Perforation 1840.00 1840.50 20
2019-08-20 Perforation 1808.00 1808.50 20
2019-08-20 Perforation 1769.00 1769.50 20
2019-08-20 Perforation 2499.00 2499.50 20
2019-08-20 Perforation 1732.00 1732.50 20
2019-08-20 Perforation 1700.00 1700.50 20
2019-08-20 Perforation 1664.00 1664.50 20
2019-08-20 Perforation 1632.00 1632.50 20
2019-08-20 Perforation 1596.00 1596.50 20
2019-08-20 Perforation 1564.00 1564.50 20
2019-08-20 Perforation 1528.00 1528.50 20
2019-08-20 Perforation 1496.00 1496.50 20
2019-08-20 Perforation 1460.00 1460.50 20
2019-08-20 Perforation 1422.00 1422.50 20
2019-08-20 Perforation 2467.00 2467.50 20
2019-08-20 Perforation 1389.00 1389.50 20
2019-08-20 Perforation 1354.00 1354.50 20
2019-08-20 Perforation 1313.00 1313.50 20
2019-08-20 Perforation 1274.00 1274.50 20
2019-08-23 Fracture 2538.00 2538.50 0
2019-08-23 Fracture 2499.00 2499.50 0
2019-08-23 Fracture 2467.00 2467.50 0
2019-08-23 Fracture 2430.00 2430.50 0
2019-08-23 Fracture 2393.00 2393.50 0
2019-08-23 Fracture 2361.00 2361.50 0
2019-08-20 Perforation 2430.00 2430.50 20
2019-08-23 Fracture 2324.00 2324.50 0
2019-08-23 Fracture 2287.00 2287.50 0
2019-08-23 Fracture 2255.00 2255.50 0
2019-08-23 Fracture 2015.00 2015.50 0
2019-08-23 Fracture 1976.00 1976.50 0
2019-08-23 Fracture 1943.00 1943.50 0
2019-08-23 Fracture 1908.00 1908.50 0
2019-08-23 Fracture 1876.00 1876.50 0
2019-08-24 Fracture 1840.00 1840.50 0
2019-08-24 Fracture 1808.00 1808.50 0
2019-08-20 Perforation 2393.00 2393.50 20
2019-08-24 Fracture 1769.00 1769.50 0
2019-08-24 Fracture 1732.00 1732.50 0
2019-08-24 Fracture 1700.00 1700.50 0
2019-08-24 Fracture 1664.00 1664.50 0
2019-08-24 Fracture 1632.00 1632.50 0
2019-08-24 Fracture 1596.00 1596.50 0
2019-08-24 Fracture 1564.00 1564.50 0
2019-08-24 Fracture 1528.00 1528.50 0
2019-08-24 Fracture 1496.00 1496.50 0
2019-08-24 Fracture 1460.00 1460.50 0
2019-08-20 Perforation 2361.00 2361.50 20
2019-08-24 Fracture 1422.00 1422.50 0
2019-08-24 Fracture 1389.00 1389.50 0
2019-08-24 Fracture 1354.00 1354.50 0
2019-08-24 Fracture 1313.00 1313.50 0
2019-08-24 Fracture 1274.00 1274.50 0
2019-08-20 Perforation 2324.00 2324.50 20
2019-08-20 Perforation 2287.00 2287.50 20
2019-08-20 Perforation 2255.00 2255.50 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-23 2019-08-24 904 857 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 83.5778 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 14.3651 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.1118 N/A
water 7732-18-5 100 0.1118 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0184 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.158 N/A
Ethylene glycol 107-21-1 100 0.158 N/A
Potassium Carbonate 584-08-7 100 0.158 N/A
Potassium Hydroxide 1310-58-3 100 0.158 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0128 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2939 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0716 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0716 N/A
water 7732-18-5 100 0.0716 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-19 2019-08-23 Oilfield Produced Water 948
2019-08-19 2019-08-23 Oilfield Produced Water 22
2019-08-19 2019-08-23 Oilfield Produced Water 4
2019-08-19 2019-08-23 Oilfield Produced Water 15
2019-08-19 2019-08-23 Oilfield Produced Water 6
2019-08-19 2019-08-23 Central Water Distribution Facility 11

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2960 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-11 No Incident Encountered 0.00 0.00
2019-08-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References