X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354070903000

Well Details

Well ID: 0354070903000
Loading map...
Location: 00/03-09-035-07W4/0
Location Alias: 00/03-09-35-07 W4M
Location Alias 2: 00/03-09-035-07 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 07
Section: 09
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 3-9-35-7
Operator Name: Tamarack Acquisition Corp.
License Number: 0135386
License Date: 1988-08-08
License Status: Issued
Spud Date: 1988-08-08
Final Drill Date: 1988-08-15
Well Total Depth: 1125.00 m
Surface Hole Latitude: 51.987103
Surface Hole Longitude: -110.949861

For data sources see[1][2]

Well History

Date Event
1988-08-08 Obtained License
1988-08-09 Surface Casing Operation Performed
1988-08-10 Direction Drilling Operation Performed - Deviate
1988-08-15 Finished Drilling
1988-08-15 Well Log Performed
1988-08-15 Well Mode changed to Drilled and Cased
1988-08-16 Drill Stem Test Performed
1988-08-16 Well Log Performed
1988-08-18 Well Log Performed
1988-08-21 Production Casing Operation Performed
1988-08-21 Rig Released
1988-08-22 Well Log Performed
1988-09-24 Perforation Treatment Performed - Jet Perforation
1988-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-29 Perforation Treatment Performed - Fractured
1988-09-29 Perforation Treatment Performed - Jet Perforation
1988-09-29 Plug Back Performed
1989-01-26 Well Began Production
1989-01-26 Well Fluid changed to Crude Oil
1989-01-26 Well Mode changed to Pumping
1989-09-17 Well Log Performed
1989-12-10 Well Log Performed
1990-03-09 Perforation Treatment Performed - Jet Perforation
1990-03-13 Perforation Treatment Performed - Remedial Casing
2006-12-01 Well Fluid changed to Crude Oil
2006-12-01 Well Mode changed to Suspended
2009-09-16 Perforation Treatment Performed - Jet Perforation
2010-01-01 Well Fluid changed to Crude Oil
2010-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-08-10 244.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-24 Perforation 1090.00 1093.00 13
1988-09-29 Packing Device Capped w/Cement 1076.80 1084.80 0
1988-09-29 Perforation 878.00 880.00 13
1988-09-29 Fracture 878.00 880.00 0
1990-03-09 Perforation 425.00 426.00 13
1990-03-13 Remedial Casing Cementing 425.00 426.00 0
2009-09-16 Perforation 875.50 881.00 17
2009-09-16 Perforation 871.00 875.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 6955 0.0 0.0 0.0
1990 5882 0.0 0.0 0.0
1991 8696 0.0 0.0 0.0
1992 8511 0.0 0.0 0.0
1993 7845 0.0 0.0 0.0
1995 978 0.0 0.0 0.0
1996 8722 0.0 0.0 0.0
1997 8505 0.0 0.0 0.0
1998 8270 0.0 0.0 0.0
1999 8610 0.0 0.0 0.0
2000 8706 0.0 0.0 0.0
2001 8637 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8566 0.0 0.0 0.0
2004 504 0.0 0.0 0.0
2010 7524 0.0 0.0 0.0
2011 7464 0.0 0.0 0.0
2012 7871 0.0 0.0 0.0
2013 3000 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8775 0.0 0.0 0.0
2017 6288 0.0 0.0 0.0
2018 2856 0.0 0.0 0.0
2019 5975 0.0 0.0 0.0

For data sources see[6]

References