If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354062502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.029342,"lon":-110.728249,"icon":""}]} |
Location: 00/02-25-035-06W4/0 | |
Location Alias: 00/02-25-35-06 W4M | |
Location Alias 2: 00/02-25-035-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 06 | |
Section: 25 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ACL PROVO 2-25-35-6 | |
Operator Name: Battle River Energy Ltd. | |
License Number: 0336969 | |
License Date: 2005-08-24 | |
License Status: Suspension | |
Spud Date: 2005-09-09 | |
Final Drill Date: 2005-09-11 | |
Well Total Depth: 832.00 m | |
Surface Hole Latitude: 52.029342 | |
Surface Hole Longitude: -110.728249 |
Date | Event |
---|---|
2005-08-24 | Obtained License |
2005-09-09 | Well Log Performed |
2005-09-10 | Surface Casing Operation Performed |
2005-09-11 | Finished Drilling |
2005-09-11 | Well Mode changed to Drilled and Cased |
2005-09-19 | Production Casing Operation Performed |
2005-09-19 | Rig Released |
2005-09-21 | Well Log Performed |
2005-09-22 | Well Log Performed |
2005-09-23 | Perforation Treatment Performed - Jet Perforation |
2005-10-25 | Well Began Production |
2005-10-25 | Well Fluid changed to Gas |
2005-10-25 | Well Mode changed to Pumping |
2015-03-30 | Well Fluid changed to Gas |
2015-03-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-23 | Perforation | 792.50 | 793.50 | 17 |
2005-09-23 | Perforation | 795.00 | 802.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 696 | 0.0 | 0.0 | 0.0 |
2006 | 8759 | 0.0 | 0.0 | 0.0 |
2007 | 8711 | 0.0 | 0.0 | 0.0 |
2008 | 8687 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8736 | 0.0 | 0.0 | 0.0 |
2011 | 8616 | 0.0 | 0.0 | 0.0 |
2012 | 5495 | 0.0 | 0.0 | 0.0 |
2013 | 1200 | 0.0 | 0.0 | 0.0 |
2014 | 1272 | 0.0 | 0.0 | 0.0 |
For data sources see[5]