X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354060412002

Well Details

Well ID: 0354060412002
Loading map...
Location: 00/12-04-035-06W4/2
Location Alias: 00/12-04-35-06 W4M
Location Alias 2: 00/12-04-035-06 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 04
County/Municipality: Special Areas No. 4
Well Name: ACL PROVOST 12-4-35-6
Operator Name: Karve Energy Inc.
License Number: 0154452
License Date: 1992-11-10
License Status: Abandoned
Spud Date: 1992-11-13
Final Drill Date: 1992-11-17
Well Total Depth: 1011.00 m
Surface Hole Latitude: 51.975167
Surface Hole Longitude: -110.813090

For data sources see[1][2]

Well History

Date Event
1992-11-10 Obtained License
1992-11-14 Direction Drilling Operation Performed - Deviate
1992-11-14 Surface Casing Operation Performed
1992-11-17 Finished Drilling
1992-11-17 Well Log Performed
1992-11-17 Well Mode changed to Drilled and Cased
1992-11-18 Production Casing Operation Performed
1992-11-18 Rig Released
1992-11-18 Well Log Performed
1992-12-02 Well Log Performed
1992-12-04 Perforation Treatment Performed - Jet Perforation
1992-12-05 Well Log Performed
1999-08-26 Perforation Treatment Performed - Jet Perforation
1999-08-26 Well Log Performed
1999-08-26 Well Mode changed to Drilled and Cased
1999-08-28 Perforation Treatment Performed - Jet Perforation
1999-08-28 Well Log Performed
2000-01-30 Perforation Treatment Performed - Fractured
2000-04-14 Well Began Production
2000-04-14 Well Fluid changed to Gas
2000-04-14 Well Mode changed to Flowing
2002-09-13 Perforation Treatment Performed - Cement Squeeze
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-16 Well Log Performed
2002-09-18 Perforation Treatment Performed - Cement Squeeze
2002-09-18 Plug Back Performed
2002-09-18 Well Fluid changed to Gas
2002-09-18 Well Mode changed to Abandoned Zone
2016-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-05-31 Plug Back Performed
2016-07-14 Well Abandoned
2016-07-14 Well Fluid changed to Gas
2016-07-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-14 131.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-04 Perforation 966.50 969.00 13
1999-08-26 Perforation 952.50 953.50 18
1999-08-28 Perforation 952.50 954.00 14
2000-01-30 Fracture 952.50 954.00 0
2002-09-13 Cement Squeeze 952.50 954.00 0
2002-09-16 Perforation 948.00 949.00 17
2002-09-16 Perforation 950.50 952.00 17
2002-09-18 Cement Squeeze 948.00 952.00 0
2016-05-31 Packing Device Capped w/Cement 932.00 940.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5410 0.0 0.0 0.0
2001 4020 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References