X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354060202002

Well Details

Well ID: 0354060202002
Loading map...
Location: 00/02-02-035-06W4/2
Location Alias: 00/02-02-35-06 W4M
Location Alias 2: 00/02-02-035-06 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 02
County/Municipality: Special Areas No. 4
Well Name: SPUR ET AL PROVOST 2-2-35-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0123533
License Date: 1986-07-25
License Status: Abandoned
Spud Date: 1986-08-01
Final Drill Date: 1986-08-05
Well Total Depth: 1012.00 m
Surface Hole Latitude: 51.969926
Surface Hole Longitude: -110.753009

For data sources see[1][2]

Well History

Date Event
1986-07-25 Obtained License
1986-08-02 Surface Casing Operation Performed
1986-08-05 Finished Drilling
1986-08-05 Production Casing Operation Performed
1986-08-05 Rig Released
1986-08-05 Well Log Performed
1986-08-05 Well Mode changed to Drilled and Cased
1986-09-26 Perforation Treatment Performed - Jet Perforation
1986-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-22 Plug Back Performed
1986-10-25 Perforation Treatment Performed - Fractured
1986-10-25 Perforation Treatment Performed - Jet Perforation
1997-06-10 Perforation Treatment Performed - Jet Perforation
1997-06-10 Well Mode changed to Drilled and Cased
2008-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-18 Plug Back Performed
2008-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-19 Plug Back Performed
2008-12-19 Well Mode changed to Abandoned Zone
2012-11-19 Well Abandoned
2012-11-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-26 Perforation 900.00 908.00 13
1986-10-22 Packing Device Capped w/Cement 880.00 890.00 0
1986-10-25 Perforation 801.50 805.50 13
1986-10-25 Fracture 801.50 805.50 0
1997-06-10 Perforation 232.00 234.00 13
1997-06-10 Perforation 245.00 248.00 13
1997-06-10 Perforation 288.00 291.00 13
2008-12-18 Packing Device Capped w/Cement 779.00 795.00 0
2008-12-19 Packing Device Capped w/Cement 212.00 228.00 0

For data sources see[4]



References