X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354060103000

Well Details

Well ID: 0354060103000
Loading map...
Location: 00/03-01-035-06W4/0
Location Alias: 00/03-01-35-06 W4M
Location Alias 2: 00/03-01-035-06 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 06
Section: 01
County/Municipality: Special Areas No. 4
Well Name: SPUR HZ PROVOST 3-1-35-6
Operator Name: Tamarack Acquisition Corp.
License Number: 0449616
License Date: 2012-10-30
License Status: Issued
Spud Date: 2012-11-27
Final Drill Date: 2012-11-30
Well Total Depth: 1494.00 m
Surface Hole Latitude: 51.976848
Surface Hole Longitude: -110.735538

For data sources see[1][2]

Well History

Date Event
2012-10-30 Obtained License
2012-11-28 Surface Casing Operation Performed
2012-11-29 Direction Drilling Operation Performed - Deviate
2012-11-29 Direction Drilling Operation Performed - Horizontal
2012-11-30 Finished Drilling
2012-11-30 Well Log Performed
2012-11-30 Well Mode changed to Drilled and Cased
2012-12-02 Production Casing Operation Performed
2012-12-03 Rig Released
2012-12-12 Well Log Performed
2012-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-25 Well Began Production
2012-12-25 Well Fluid changed to Crude Oil
2012-12-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-27 Savanna Drilling Corp. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-29 593.00 Deviate (5 - 79 degrees)
2012-11-29 902.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-16 Multi-Stage Fracture 1473.00 1474.80 0
2012-12-16 Multi-Stage Fracture 985.00 986.80 0
2012-12-16 Multi-Stage Fracture 1429.00 1430.80 0
2012-12-16 Multi-Stage Fracture 1385.00 1386.80 0
2012-12-16 Multi-Stage Fracture 1328.00 1329.80 0
2012-12-16 Multi-Stage Fracture 1271.00 1272.80 0
2012-12-16 Multi-Stage Fracture 1213.00 1214.80 0
2012-12-16 Multi-Stage Fracture 1156.00 1157.80 0
2012-12-16 Multi-Stage Fracture 1099.00 1100.80 0
2012-12-16 Multi-Stage Fracture 1042.00 1043.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 168 0.0 0.0 0.0
2013 6257 0.0 0.0 0.0
2014 6974 0.0 0.0 0.0
2015 2262 0.0 0.0 0.0
2016 1694 0.0 0.0 0.0
2017 5152 0.0 0.0 0.0
2018 8327 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-30 No Incident Encountered 0.00 0.00
2012-12-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References