If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354052216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.013447,"lon":-110.630077,"icon":""}]} |
Location: 00/16-22-035-05W4/0 | |
Location Alias: 00/16-22-35-05 W4M | |
Location Alias 2: 00/16-22-035-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 05 | |
Section: 22 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND PROVOST 16-22-35-5 | |
Operator Name: Karve Energy Inc. | |
License Number: 0443321 | |
License Date: 2012-01-25 | |
License Status: Issued | |
Spud Date: 2012-02-10 | |
Final Drill Date: 2012-02-14 | |
Well Total Depth: 2005.00 m | |
Surface Hole Latitude: 52.013447 | |
Surface Hole Longitude: -110.630077 |
Date | Event |
---|---|
2012-01-25 | Obtained License |
2012-02-11 | Surface Casing Operation Performed |
2012-02-11 | Well Log Performed |
2012-02-12 | Direction Drilling Operation Performed - Horizontal |
2012-02-14 | Finished Drilling |
2012-02-14 | Well Log Performed |
2012-02-14 | Well Mode changed to Drilled and Cased |
2012-02-15 | Production Casing Operation Performed |
2012-02-15 | Rig Released |
2012-02-23 | Well Log Performed |
2012-05-14 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-05-14 | Perforation Treatment Performed - Fractured |
2012-05-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-05-15 | Perforation Treatment Performed - Fractured |
2012-05-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-17 | Well Began Production |
2012-05-17 | Well Fluid changed to Crude Oil |
2012-05-17 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-10 | Bonanza Drilling Inc. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-12 | 520.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-14 | Hydra Jet Perforation | 1992.00 | 1992.30 | 0 |
2012-05-14 | Hydra Jet Perforation | 1690.00 | 1690.30 | 0 |
2012-05-14 | Fracture | 1690.00 | 1690.30 | 0 |
2012-05-15 | Hydra Jet Perforation | 1661.00 | 1661.30 | 0 |
2012-05-15 | Fracture | 1661.00 | 1661.30 | 0 |
2012-05-15 | Hydra Jet Perforation | 1641.00 | 1641.30 | 0 |
2012-05-15 | Fracture | 1641.00 | 1641.30 | 0 |
2012-05-15 | Multi-Stage Fracture | 1544.60 | 1544.70 | 0 |
2012-05-15 | Multi-Stage Fracture | 1474.10 | 1474.20 | 0 |
2012-05-15 | Multi-Stage Fracture | 1416.30 | 1416.40 | 0 |
2012-05-15 | Multi-Stage Fracture | 1357.60 | 1357.70 | 0 |
2012-05-14 | Hydra Jet Perforation | 1954.00 | 1954.30 | 0 |
2012-05-15 | Multi-Stage Fracture | 1299.10 | 1299.20 | 0 |
2012-05-15 | Multi-Stage Fracture | 1239.90 | 1240.00 | 0 |
2012-05-15 | Multi-Stage Fracture | 1181.10 | 1181.20 | 0 |
2012-05-15 | Multi-Stage Fracture | 1121.30 | 1121.40 | 0 |
2012-05-15 | Multi-Stage Fracture | 1062.10 | 1062.20 | 0 |
2012-05-15 | Multi-Stage Fracture | 1003.30 | 1003.40 | 0 |
2012-05-14 | Fracture | 1954.00 | 1954.30 | 0 |
2012-05-14 | Multi-Stage Fracture | 1917.10 | 1917.20 | 0 |
2012-05-14 | Multi-Stage Fracture | 1846.30 | 1846.40 | 0 |
2012-05-14 | Hydra Jet Perforation | 1786.00 | 1786.30 | 0 |
2012-05-14 | Fracture | 1786.00 | 1786.30 | 0 |
2012-05-14 | Hydra Jet Perforation | 1737.10 | 1737.40 | 0 |
2012-05-14 | Fracture | 1737.10 | 1737.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4337 | 0.0 | 0.0 | 0.0 |
2013 | 8473 | 0.0 | 0.0 | 0.0 |
2014 | 8707 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8559 | 0.0 | 0.0 | 0.0 |
2017 | 4051 | 0.0 | 0.0 | 0.0 |
2018 | 2976 | 0.0 | 0.0 | 0.0 |
2019 | 6548 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]