If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354052215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.013614,"lon":-110.630419,"icon":""}]} |
Location: 00/15-22-035-05W4/0 | |
Location Alias: 00/15-22-35-05 W4M | |
Location Alias 2: 00/15-22-035-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 05 | |
Section: 22 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND PROVOST 15-22-35-5 | |
Operator Name: Karve Energy Inc. | |
License Number: 0443320 | |
License Date: 2012-01-25 | |
License Status: Issued | |
Spud Date: 2012-02-01 | |
Final Drill Date: 2012-02-04 | |
Well Total Depth: 1855.00 m | |
Surface Hole Latitude: 52.013614 | |
Surface Hole Longitude: -110.630419 |
Date | Event |
---|---|
2012-01-25 | Obtained License |
2012-02-01 | Well Log Performed |
2012-02-02 | Direction Drilling Operation Performed - Horizontal |
2012-02-02 | Surface Casing Operation Performed |
2012-02-04 | Finished Drilling |
2012-02-04 | Well Log Performed |
2012-02-04 | Well Mode changed to Drilled and Cased |
2012-02-05 | Production Casing Operation Performed |
2012-02-05 | Rig Released |
2012-02-23 | Well Log Performed |
2012-05-16 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-05-16 | Perforation Treatment Performed - Fractured |
2012-05-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-17 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-05-17 | Perforation Treatment Performed - Fractured |
2012-05-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-20 | Well Began Production |
2012-05-20 | Well Fluid changed to Crude Oil |
2012-05-20 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-01 | Bonanza Drilling Inc. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-02 | 520.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-16 | Hydra Jet Perforation | 1715.00 | 1715.10 | 0 |
2012-05-17 | Multi-Stage Fracture | 1311.60 | 1311.70 | 0 |
2012-05-17 | Hydra Jet Perforation | 1260.00 | 1260.10 | 0 |
2012-05-17 | Fracture | 1260.00 | 1260.10 | 0 |
2012-05-17 | Multi-Stage Fracture | 1208.70 | 1208.80 | 0 |
2012-05-17 | Multi-Stage Fracture | 1162.40 | 1162.50 | 0 |
2012-05-17 | Multi-Stage Fracture | 1116.00 | 1116.10 | 0 |
2012-05-17 | Multi-Stage Fracture | 1069.70 | 1069.80 | 0 |
2012-05-17 | Multi-Stage Fracture | 1020.20 | 1020.30 | 0 |
2012-05-17 | Multi-Stage Fracture | 960.50 | 960.60 | 0 |
2012-05-16 | Fracture | 1715.00 | 1715.10 | 0 |
2012-05-16 | Multi-Stage Fracture | 1664.00 | 1664.10 | 0 |
2012-05-16 | Hydra Jet Perforation | 1591.00 | 1591.10 | 0 |
2012-05-16 | Fracture | 1591.00 | 1591.10 | 0 |
2012-05-17 | Hydra Jet Perforation | 1560.00 | 1560.10 | 0 |
2012-05-17 | Fracture | 1560.00 | 1560.10 | 0 |
2012-05-17 | Multi-Stage Fracture | 1524.30 | 1524.40 | 0 |
2012-05-17 | Multi-Stage Fracture | 1411.30 | 1411.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4315 | 0.0 | 0.0 | 0.0 |
2013 | 8343 | 0.0 | 0.0 | 0.0 |
2014 | 7651 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8473 | 0.0 | 0.0 | 0.0 |
2017 | 4219 | 0.0 | 0.0 | 0.0 |
2018 | 2448 | 0.0 | 0.0 | 0.0 |
2019 | 5084 | 0.0 | 0.0 | 0.0 |
2020 | 1931 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]