X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354052215000

Well Details

Well ID: 0354052215000
Loading map...
Location: 00/15-22-035-05W4/0
Location Alias: 00/15-22-35-05 W4M
Location Alias 2: 00/15-22-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 22
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND PROVOST 15-22-35-5
Operator Name: Karve Energy Inc.
License Number: 0443320
License Date: 2012-01-25
License Status: Issued
Spud Date: 2012-02-01
Final Drill Date: 2012-02-04
Well Total Depth: 1855.00 m
Surface Hole Latitude: 52.013614
Surface Hole Longitude: -110.630419

For data sources see[1][2]

Well History

Date Event
2012-01-25 Obtained License
2012-02-01 Well Log Performed
2012-02-02 Direction Drilling Operation Performed - Horizontal
2012-02-02 Surface Casing Operation Performed
2012-02-04 Finished Drilling
2012-02-04 Well Log Performed
2012-02-04 Well Mode changed to Drilled and Cased
2012-02-05 Production Casing Operation Performed
2012-02-05 Rig Released
2012-02-23 Well Log Performed
2012-05-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-05-16 Perforation Treatment Performed - Fractured
2012-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-05-17 Perforation Treatment Performed - Fractured
2012-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-20 Well Began Production
2012-05-20 Well Fluid changed to Crude Oil
2012-05-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-01 Bonanza Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-02 520.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-16 Hydra Jet Perforation 1715.00 1715.10 0
2012-05-17 Multi-Stage Fracture 1311.60 1311.70 0
2012-05-17 Hydra Jet Perforation 1260.00 1260.10 0
2012-05-17 Fracture 1260.00 1260.10 0
2012-05-17 Multi-Stage Fracture 1208.70 1208.80 0
2012-05-17 Multi-Stage Fracture 1162.40 1162.50 0
2012-05-17 Multi-Stage Fracture 1116.00 1116.10 0
2012-05-17 Multi-Stage Fracture 1069.70 1069.80 0
2012-05-17 Multi-Stage Fracture 1020.20 1020.30 0
2012-05-17 Multi-Stage Fracture 960.50 960.60 0
2012-05-16 Fracture 1715.00 1715.10 0
2012-05-16 Multi-Stage Fracture 1664.00 1664.10 0
2012-05-16 Hydra Jet Perforation 1591.00 1591.10 0
2012-05-16 Fracture 1591.00 1591.10 0
2012-05-17 Hydra Jet Perforation 1560.00 1560.10 0
2012-05-17 Fracture 1560.00 1560.10 0
2012-05-17 Multi-Stage Fracture 1524.30 1524.40 0
2012-05-17 Multi-Stage Fracture 1411.30 1411.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4315 0.0 0.0 0.0
2013 8343 0.0 0.0 0.0
2014 7651 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8473 0.0 0.0 0.0
2017 4219 0.0 0.0 0.0
2018 2448 0.0 0.0 0.0
2019 5084 0.0 0.0 0.0
2020 1931 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References