Well Details

Well ID: 0354052113000
Loading map...
Location: 00/13-21-035-05W4/0
Location Alias: 00/13-21-35-05 W4M
Location Alias 2: 00/13-21-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 21
County/Municipality: Special Areas No. 4
Well Name: ACL HZ PROVOST 13-21-35-5
Operator Name: Karve Energy Inc.
License Number: 0454103
License Date: 2013-01-25
License Status: Issued
Spud Date: 2013-02-22
Final Drill Date: 2013-02-26
Well Total Depth: 1814.00 m
Surface Hole Latitude: 52.021675
Surface Hole Longitude: -110.653501

For data sources see[1][2]

Well History

Date Event
2013-01-25 Obtained License
2013-01-26 Well Log Performed
2013-02-22 Surface Casing Operation Performed
2013-02-23 Direction Drilling Operation Performed - Deviate
2013-02-23 Direction Drilling Operation Performed - Horizontal
2013-02-26 Finished Drilling
2013-02-26 Well Log Performed
2013-02-26 Well Mode changed to Drilled and Cased
2013-02-28 Intermediate Casing Operation Performed
2013-02-28 Perforation Treatment Performed - Open-Hole Completion
2013-02-28 Production Casing Operation Performed
2013-02-28 Rig Released
2013-06-06 Well Log Performed
2013-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-26 Well Began Production
2013-07-26 Well Fluid changed to Crude Oil
2013-07-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-22 Bonanza Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-23 420.00 Deviate (5 - 79 degrees)
2013-02-23 950.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-28 Open Hole/Barefoot Completion 1791.50 1814.00 0
2013-06-14 Multi-Stage Fracture 1127.00 1127.10 0
2013-06-14 Multi-Stage Fracture 1375.40 1375.50 0
2013-06-14 Multi-Stage Fracture 1437.20 1437.30 0
2013-06-14 Multi-Stage Fracture 1499.00 1499.10 0
2013-06-14 Multi-Stage Fracture 1560.70 1560.80 0
2013-06-14 Multi-Stage Fracture 1622.90 1623.00 0
2013-06-14 Multi-Stage Fracture 1684.50 1684.60 0
2013-06-14 Multi-Stage Fracture 1747.40 1747.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-14 2013-06-14 773 759 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 potassium chloride 7447-40-7 100 83.813 N/A
water 7732-18-5 100 83.813 N/A
Sand (16/30) Trican silica crystalline 14808-60-7 100 14.7977 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 0.2262 N/A
PROBIO-100 Trican Bactericide/Biocide non-hazardous ingredients Not Available 100 0.1304 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0868 N/A
non-hazardous ingredients Not Available 100 0.0868 N/A
triethanolamine 102-71-6 100 0.0868 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0403 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.1253 N/A
pH-6 Trican Buffer formic acid 64-18-6 100 0.1736 N/A
water 7732-18-5 100 0.1736 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1738 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1738 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.4325 N/A
polysaccharide blend Not Available 100 0.4325 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-06-14 2013-06-20 Waste Water - Municipal 759

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3751 0.0 0.0 0.0
2014 8569 0.0 0.0 0.0
2015 8683 0.0 0.0 0.0
2016 8291 0.0 0.0 0.0
2017 8493 0.0 0.0 0.0
2018 8333 0.0 0.0 0.0
2019 8430 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-28 No Incident Encountered 0.00 0.00
2013-07-09 No Incident Encountered 0.00 0.00

For data sources see[10]