X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354052112020

Well Details

Well ID: 0354052112020
Loading map...
Location: 02/12-21-035-05W4/0
Location Alias: 02/12-21-35-05 W4M
Location Alias 2: 02/12-21-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 21
County/Municipality: Special Areas No. 4
Well Name: ACL 102 HZ PROVOST 12-21-35-5
Operator Name: Karve Energy Inc.
License Number: 0454102
License Date: 2013-01-25
License Status: Issued
Spud Date: 2013-02-16
Final Drill Date: 2013-02-20
Well Total Depth: 1775.00 m
Surface Hole Latitude: 52.021496
Surface Hole Longitude: -110.653529

For data sources see[1][2]

Well History

Date Event
2013-01-25 Obtained License
2013-02-16 Surface Casing Operation Performed
2013-02-17 Direction Drilling Operation Performed - Deviate
2013-02-17 Direction Drilling Operation Performed - Horizontal
2013-02-18 Well Log Performed
2013-02-20 Finished Drilling
2013-02-20 Well Log Performed
2013-02-20 Well Mode changed to Drilled and Cased
2013-02-21 Intermediate Casing Operation Performed
2013-02-21 Perforation Treatment Performed - Open-Hole Completion
2013-02-21 Production Casing Operation Performed
2013-02-21 Rig Released
2013-06-06 Well Log Performed
2013-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-26 Well Began Production
2013-07-26 Well Fluid changed to Crude Oil
2013-07-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-16 Bonanza Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-17 460.00 Deviate (5 - 79 degrees)
2013-02-17 914.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-21 Open Hole/Barefoot Completion 1771.00 1775.00 0
2013-06-15 Multi-Stage Fracture 1745.50 1745.60 0
2013-06-15 Multi-Stage Fracture 1024.10 1024.20 0
2013-06-15 Multi-Stage Fracture 1159.50 1159.60 0
2013-06-15 Multi-Stage Fracture 1206.60 1206.70 0
2013-06-15 Multi-Stage Fracture 1343.40 1343.50 0
2013-06-15 Multi-Stage Fracture 1508.10 1508.20 0
2013-06-15 Multi-Stage Fracture 1568.90 1569.00 0
2013-06-15 Multi-Stage Fracture 1616.20 1616.30 0
2013-06-15 Multi-Stage Fracture 1677.60 1677.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-06-15 2013-06-15 773 714 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 potassium chloride 7447-40-7 100 85.5854 N/A
water 7732-18-5 100 85.5854 N/A
Sand (16/30) Trican silica crystalline 14808-60-7 100 14.377 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 0.4604 N/A
PROBIO-100 Trican Bactericide/Biocide non-hazardous ingredients Not Available 100 0.1331 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0887 N/A
non-hazardous ingredients Not Available 100 0.0887 N/A
triethanolamine 102-71-6 100 0.0887 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0412 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.1222 N/A
pH-6 Trican Buffer formic acid 64-18-6 100 0.1774 N/A
water 7732-18-5 100 0.1774 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1695 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1695 N/A
WG-111L Rapid Gellant Trican Gelling Agent distillates (petroleum). hydrotreated middle 64742-46-7 100 0.442 N/A
polysaccharide blend Not Available 100 0.442 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-06-14 2013-06-20 Waste Water - Municipal 756

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3760 0.0 0.0 0.0
2014 8573 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8447 0.0 0.0 0.0
2017 7953 0.0 0.0 0.0
2018 5241 0.0 0.0 0.0
2019 8248 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-21 No Incident Encountered 0.00 0.00
2013-07-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References