X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354052004020

Well Details

Well ID: 0354052004020
Loading map...
Location: 02/04-20-035-05W4/0
Location Alias: 02/04-20-35-05 W4M
Location Alias 2: 02/04-20-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 20
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 02 PROVOST 4-20-35-5
Operator Name: Karve Energy Inc.
License Number: 0485089
License Date: 2017-08-21
License Status: Issued
Spud Date: 2017-09-12
Final Drill Date: 2017-09-15
Well Total Depth: 2344.00 m
Surface Hole Latitude: 52.027944
Surface Hole Longitude: -110.691087

For data sources see[1][2]

Well History

Date Event
2017-08-21 Obtained License
2017-09-13 Direction Drilling Operation Performed - Deviate
2017-09-13 Surface Casing Operation Performed
2017-09-14 Direction Drilling Operation Performed - Horizontal
2017-09-15 Finished Drilling
2017-09-15 Production Casing Operation Performed
2017-09-15 Well Log Performed
2017-09-15 Well Mode changed to Drilled and Cased
2017-09-16 Rig Released
2017-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-14 Well Began Production
2017-10-14 Well Fluid changed to Crude Oil
2017-10-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-12 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-13 460.10 Deviate (5 - 79 degrees)
2017-09-14 921.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-29 Multi-Stage Fracture 2311.90 2312.00 0
2017-09-29 Multi-Stage Fracture 1972.10 1972.20 0
2017-09-29 Multi-Stage Fracture 1942.70 1942.80 0
2017-09-29 Multi-Stage Fracture 1913.30 1913.40 0
2017-09-29 Multi-Stage Fracture 1885.40 1885.50 0
2017-09-29 Multi-Stage Fracture 1855.90 1856.00 0
2017-09-29 Multi-Stage Fracture 1826.50 1826.60 0
2017-09-29 Multi-Stage Fracture 1797.10 1797.20 0
2017-09-29 Multi-Stage Fracture 1767.80 1767.90 0
2017-09-29 Multi-Stage Fracture 1711.40 1711.50 0
2017-09-29 Multi-Stage Fracture 1682.00 1682.10 0
2017-09-29 Multi-Stage Fracture 2283.00 2283.10 0
2017-09-29 Multi-Stage Fracture 1652.70 1652.80 0
2017-09-29 Multi-Stage Fracture 1623.30 1623.40 0
2017-09-29 Multi-Stage Fracture 1595.00 1595.10 0
2017-09-29 Multi-Stage Fracture 1565.80 1565.90 0
2017-09-29 Multi-Stage Fracture 1536.80 1536.90 0
2017-09-29 Multi-Stage Fracture 1507.40 1507.50 0
2017-09-29 Multi-Stage Fracture 1478.00 1478.10 0
2017-09-29 Multi-Stage Fracture 1448.60 1448.70 0
2017-09-29 Multi-Stage Fracture 1419.70 1419.80 0
2017-09-29 Multi-Stage Fracture 1391.10 1391.20 0
2017-09-29 Multi-Stage Fracture 2254.30 2254.40 0
2017-09-29 Multi-Stage Fracture 1361.90 1362.00 0
2017-09-29 Multi-Stage Fracture 1332.50 1332.60 0
2017-09-29 Multi-Stage Fracture 1303.30 1303.40 0
2017-09-29 Multi-Stage Fracture 1273.90 1274.00 0
2017-09-29 Multi-Stage Fracture 1245.10 1245.20 0
2017-09-29 Multi-Stage Fracture 1215.70 1215.80 0
2017-09-29 Multi-Stage Fracture 1186.30 1186.40 0
2017-09-29 Multi-Stage Fracture 1157.70 1157.80 0
2017-09-29 Multi-Stage Fracture 1128.20 1128.30 0
2017-09-29 Multi-Stage Fracture 1098.80 1098.90 0
2017-09-29 Multi-Stage Fracture 2212.50 2212.60 0
2017-09-29 Multi-Stage Fracture 1069.70 1069.80 0
2017-09-29 Multi-Stage Fracture 2117.40 2117.50 0
2017-09-29 Multi-Stage Fracture 2088.50 2088.60 0
2017-09-29 Multi-Stage Fracture 2060.40 2060.50 0
2017-09-29 Multi-Stage Fracture 2031.00 2031.10 0
2017-09-29 Multi-Stage Fracture 2001.50 2001.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-29 2017-09-29 783 1,697 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 80.1522 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.6041 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0554 N/A
water 7732-18-5 100 0.0554 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.063 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1323 N/A
Ethylene glycol 107-21-1 100 0.1323 N/A
Potassium Carbonate 584-08-7 100 0.1323 N/A
Potassium Hydroxide 1310-58-3 100 0.1323 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0314 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2867 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0704 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0704 N/A
water 7732-18-5 100 0.0704 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-29 2017-09-29 Groundwater - Saline 1697

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1850 0.0 0.0 0.0
2018 8670 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-17 No Incident Encountered 0.00 0.00
2017-09-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References