X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354051509020

Well Details

Well ID: 0354051509020
Loading map...
Location: 02/09-15-035-05W4/0
Location Alias: 02/09-15-35-05 W4M
Location Alias 2: 02/09-15-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 15
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND PROVOST 9-15-35-5
Operator Name: Karve Energy Inc.
License Number: 0443317
License Date: 2012-01-25
License Status: Amended
Spud Date: 2012-02-16
Final Drill Date: 2012-02-19
Well Total Depth: 1704.00 m
Surface Hole Latitude: 52.013364
Surface Hole Longitude: -110.629905

For data sources see[1][2]

Well History

Date Event
2012-01-25 Obtained License
2012-02-16 Surface Casing Operation Performed
2012-02-17 Direction Drilling Operation Performed - Horizontal
2012-02-17 Well Log Performed
2012-02-19 Finished Drilling
2012-02-19 Well Log Performed
2012-02-19 Well Mode changed to Drilled and Cased
2012-02-20 Production Casing Operation Performed
2012-02-20 Rig Released
2012-02-23 Well Log Performed
2012-05-13 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-05-13 Perforation Treatment Performed - Fractured
2012-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-15 Well Began Production
2012-05-15 Well Fluid changed to Crude Oil
2012-05-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-02-17 544.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-13 Hydra Jet Perforation 1688.00 1688.30 0
2012-05-13 Multi-Stage Fracture 1382.40 1382.50 0
2012-05-13 Multi-Stage Fracture 1324.60 1324.70 0
2012-05-14 Multi-Stage Fracture 1266.90 1267.00 0
2012-05-14 Multi-Stage Fracture 1209.10 1209.20 0
2012-05-14 Multi-Stage Fracture 1138.50 1138.60 0
2012-05-14 Multi-Stage Fracture 1080.70 1080.80 0
2012-05-14 Multi-Stage Fracture 1022.90 1023.00 0
2012-05-14 Multi-Stage Fracture 965.00 965.10 0
2012-05-13 Fracture 1688.00 1688.30 0
2012-05-13 Hydra Jet Perforation 1636.00 1636.30 0
2012-05-13 Fracture 1636.00 1636.30 0
2012-05-13 Multi-Stage Fracture 1587.80 1587.90 0
2012-05-13 Multi-Stage Fracture 1491.50 1491.60 0
2012-05-13 Hydra Jet Perforation 1482.00 1482.30 0
2012-05-13 Hydra Jet Perforation 1457.00 1457.30 0
2012-05-13 Fracture 1457.00 1457.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4366 0.0 0.0 0.0
2013 8653 0.0 0.0 0.0
2014 8730 0.0 0.0 0.0
2015 8559 0.0 0.0 0.0
2016 8569 0.0 0.0 0.0
2017 4122 0.0 0.0 0.0
2018 3312 0.0 0.0 0.0
2019 6164 0.0 0.0 0.0
2020 2051 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References