X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354051213030

Well Details

Well ID: 0354051213030
Loading map...
Location: 03/13-12-035-05W4/0
Location Alias: 03/13-12-35-05 W4M
Location Alias 2: 03/13-12-035-05 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 05
Section: 12
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 03 PROVOST 13-12-35-5
Operator Name: Karve Energy Inc.
License Number: 0479743
License Date: 2016-06-23
License Status: Issued
Spud Date: 2016-07-16
Final Drill Date: 2016-07-18
Well Total Depth: 1730.00 m
Surface Hole Latitude: 51.994606
Surface Hole Longitude: -110.583785

For data sources see[1][2]

Well History

Date Event
2016-06-23 Obtained License
2016-07-16 Surface Casing Operation Performed
2016-07-17 Direction Drilling Operation Performed - Deviate
2016-07-17 Direction Drilling Operation Performed - Horizontal
2016-07-18 Finished Drilling
2016-07-18 Well Log Performed
2016-07-18 Well Mode changed to Drilled and Cased
2016-07-19 Production Casing Operation Performed
2016-07-19 Rig Released
2016-08-09 Well Began Production
2016-08-09 Well Fluid changed to Crude Oil
2016-08-09 Well Mode changed to Flowing
2016-08-13 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-16 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-07-17 465.00 Deviate (5 - 79 degrees)
2016-07-17 839.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-13 Multi-Stage Fracture 1679.50 1679.60 0
2016-08-13 Multi-Stage Fracture 1322.50 1322.60 0
2016-08-13 Multi-Stage Fracture 1278.40 1278.50 0
2016-08-13 Multi-Stage Fracture 1247.60 1247.70 0
2016-08-13 Multi-Stage Fracture 1203.50 1203.60 0
2016-08-13 Multi-Stage Fracture 1172.70 1172.80 0
2016-08-13 Multi-Stage Fracture 1128.60 1128.70 0
2016-08-13 Multi-Stage Fracture 1097.80 1097.90 0
2016-08-13 Multi-Stage Fracture 1053.70 1053.80 0
2016-08-13 Multi-Stage Fracture 1022.90 1023.00 0
2016-08-13 Multi-Stage Fracture 992.10 992.20 0
2016-08-13 Multi-Stage Fracture 1622.10 1622.20 0
2016-08-13 Multi-Stage Fracture 948.00 948.10 0
2016-08-13 Multi-Stage Fracture 1591.30 1591.40 0
2016-08-13 Multi-Stage Fracture 1547.20 1547.30 0
2016-08-13 Multi-Stage Fracture 1516.40 1516.50 0
2016-08-13 Multi-Stage Fracture 1472.30 1472.40 0
2016-08-13 Multi-Stage Fracture 1441.50 1441.60 0
2016-08-13 Multi-Stage Fracture 1397.40 1397.50 0
2016-08-13 Multi-Stage Fracture 1366.60 1366.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-13 2016-08-13 740 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - KCL ( 5%) Not Available 100 72.5429 N/A
Sand (16/30) Canyon Technical Services Aluminum Oxide 1344-28-1 100 22.8236 N/A
Crystalline silica. quartz 14808-60-7 100 22.8236 N/A
Iron Oxide 1309-37-1 100 22.8236 N/A
Titanium Oxide 13463-67-7 100 22.8238 N/A
Sand (20/40) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.8039 N/A
Crystalline silica. quartz 14808-60-7 100 3.8039 N/A
Iron Oxide 1309-37-1 100 3.8039 N/A
Titanium Oxide 13463-67-7 100 3.804 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0097 N/A
Water 7732-18-5 100 0.0097 N/A
CAN-2300 Breaker (Enzyme HpH) Canyon Technical Services Breaker Cellulase Enzyme Solution Not Available 100 0.0148 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0831 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0831 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.141 N/A
Monoethanolamine 141-43-5 100 0.141 N/A
Water 7732-18-5 100 0.141 N/A
CAN-2413 Non-emulsifier Canyon Technical Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0336 N/A
Methanol 67-56-1 100 0.0336 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0336 N/A
Sulfonic Acids (Petroleum) 61789-85-3 100 0.0337 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.4368 N/A
paraFLO 2 Canyon Technical Services Scale Inhibitor Non-hazardous base ingredient(s) Not Available 100 0.1101 N/A
Silica. crystalline-quartz 14808-60-7 100 0.1101 N/A
White mineral oil 8042-47-5 100 0.1101 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-13 2016-08-13 Surface Water - Runoff 754

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2767 0.0 0.0 0.0
2017 6269 0.0 0.0 0.0
2018 8643 0.0 0.0 0.0
2019 6040 0.0 0.0 0.0
2020 1943 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-19 No Incident Encountered 0.00 0.00
2016-08-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References