If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354051209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.998514,"lon":-110.584715,"icon":""}]} |
Location: 00/09-12-035-05W4/0 | |
Location Alias: 00/09-12-35-05 W4M | |
Location Alias 2: 00/09-12-035-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 05 | |
Section: 12 | |
County/Municipality: Special Areas No. 4 | |
Well Name: HIGH GROUND 2-13 H PROVOST 9-12-35-5 | |
Operator Name: Karve Energy Inc. | |
License Number: 0481451 | |
License Date: 2016-11-15 | |
License Status: Issued | |
Spud Date: 2016-12-20 | |
Final Drill Date: 2016-12-30 | |
Well Total Depth: 1676.50 m | |
Surface Hole Latitude: 51.998514 | |
Surface Hole Longitude: -110.584715 |
Date | Event |
---|---|
2016-11-15 | Obtained License |
2016-12-20 | Surface Casing Operation Performed |
2016-12-28 | Direction Drilling Operation Performed - Deviate |
2016-12-29 | Direction Drilling Operation Performed - Horizontal |
2016-12-30 | Finished Drilling |
2016-12-30 | Production Casing Operation Performed |
2016-12-30 | Rig Released |
2016-12-30 | Well Log Performed |
2016-12-30 | Well Mode changed to Drilled and Cased |
2017-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-08 | Well Began Production |
2017-02-08 | Well Fluid changed to Crude Oil |
2017-02-08 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-20 | Bonanza Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-12-28 | 511.90 | Deviate (5 - 79 degrees) |
2016-12-29 | 906.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-01-13 | Multi-Stage Fracture | 1646.10 | 1646.20 | 0 |
2017-01-13 | Multi-Stage Fracture | 1301.80 | 1301.90 | 0 |
2017-01-13 | Multi-Stage Fracture | 1270.90 | 1271.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 1240.40 | 1240.50 | 0 |
2017-01-13 | Multi-Stage Fracture | 1209.50 | 1209.60 | 0 |
2017-01-13 | Multi-Stage Fracture | 1178.60 | 1178.70 | 0 |
2017-01-13 | Multi-Stage Fracture | 1147.80 | 1147.90 | 0 |
2017-01-13 | Multi-Stage Fracture | 1116.90 | 1117.00 | 0 |
2017-01-13 | Multi-Stage Fracture | 1086.00 | 1086.10 | 0 |
2017-01-13 | Multi-Stage Fracture | 1055.20 | 1055.30 | 0 |
2017-01-13 | Multi-Stage Fracture | 1024.30 | 1024.40 | 0 |
2017-01-13 | Multi-Stage Fracture | 1602.00 | 1602.10 | 0 |
2017-01-13 | Multi-Stage Fracture | 993.50 | 993.60 | 0 |
2017-01-13 | Multi-Stage Fracture | 1557.80 | 1557.90 | 0 |
2017-01-13 | Multi-Stage Fracture | 1513.60 | 1513.70 | 0 |
2017-01-13 | Multi-Stage Fracture | 1469.40 | 1469.50 | 0 |
2017-01-13 | Multi-Stage Fracture | 1425.20 | 1425.30 | 0 |
2017-01-13 | Multi-Stage Fracture | 1394.40 | 1394.50 | 0 |
2017-01-13 | Multi-Stage Fracture | 1363.50 | 1363.60 | 0 |
2017-01-13 | Multi-Stage Fracture | 1332.70 | 1332.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-13 | 2017-01-13 | 750 | 869 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Potassium Chloride | 7447-40-7 | 100 | 75.3031 | N/A | |||
Water | 7732-18-5 | 100 | 75.3031 | N/A | ||||
Sand (16/30) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 20.4693 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 20.4693 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 20.4693 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 20.4693 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.4115 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.4115 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.4115 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.4114 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0116 | N/A | |
Water | 7732-18-5 | 100 | 0.0116 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0092 | N/A | |
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0672 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0672 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1415 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1415 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1415 | N/A | ||||
CAN-2413 Non-emulsifier | Canyon Technical Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0393 | N/A | |
Methanol | 67-56-1 | 100 | 0.0393 | N/A | ||||
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0393 | N/A | ||||
Sulfonic Acids (Petroleum) | 61789-85-3 | 100 | 0.0393 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4148 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1318 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1318 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1318 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-13 | 2017-01-13 | Surface Water - Runoff | 869 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7348 | 0.0 | 0.0 | 0.0 |
2018 | 8526 | 0.0 | 0.0 | 0.0 |
2019 | 8402 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-30 | No Incident Encountered | 0.00 | 0.00 |
2017-01-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]