X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354043316000

Well Details

Well ID: 0354043316000
Loading map...
Location: 00/16-33-035-04W4/0
Location Alias: 00/16-33-35-04 W4M
Location Alias 2: 00/16-33-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 33
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 16-33-35-4
Operator Name: Karve Energy Inc.
License Number: 0483612
License Date: 2017-05-18
License Status: Issued
Spud Date: 2017-07-25
Final Drill Date: 2017-07-27
Well Total Depth: 2308.00 m
Surface Hole Latitude: 52.039177
Surface Hole Longitude: -110.512243

For data sources see[1][2]

Well History

Date Event
2017-05-18 Obtained License
2017-07-25 Surface Casing Operation Performed
2017-07-26 Direction Drilling Operation Performed - Deviate
2017-07-26 Direction Drilling Operation Performed - Horizontal
2017-07-27 Finished Drilling
2017-07-27 Well Log Performed
2017-07-27 Well Mode changed to Drilled and Cased
2017-07-28 Production Casing Operation Performed
2017-07-28 Rig Released
2017-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-12 Well Began Production
2017-09-12 Well Fluid changed to Crude Oil
2017-09-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-25 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-26 403.70 Deviate (5 - 79 degrees)
2017-07-26 819.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-02 Multi-Stage Fracture 2257.10 2257.20 0
2017-09-03 Multi-Stage Fracture 1912.10 1912.20 0
2017-09-03 Multi-Stage Fracture 1886.50 1886.60 0
2017-09-03 Multi-Stage Fracture 1861.30 1861.40 0
2017-09-03 Multi-Stage Fracture 1836.30 1836.40 0
2017-09-03 Multi-Stage Fracture 1807.00 1807.10 0
2017-09-03 Multi-Stage Fracture 1777.60 1777.70 0
2017-09-03 Multi-Stage Fracture 1752.40 1752.50 0
2017-09-03 Multi-Stage Fracture 1726.70 1726.80 0
2017-09-03 Multi-Stage Fracture 1700.90 1701.00 0
2017-09-03 Multi-Stage Fracture 1658.30 1658.40 0
2017-09-02 Multi-Stage Fracture 2214.20 2214.30 0
2017-09-03 Multi-Stage Fracture 1615.40 1615.50 0
2017-09-03 Multi-Stage Fracture 1589.50 1589.60 0
2017-09-03 Multi-Stage Fracture 1564.20 1564.30 0
2017-09-03 Multi-Stage Fracture 1534.80 1534.90 0
2017-09-03 Multi-Stage Fracture 1505.60 1505.70 0
2017-09-03 Multi-Stage Fracture 1480.10 1480.20 0
2017-09-03 Multi-Stage Fracture 1458.60 1458.70 0
2017-09-03 Multi-Stage Fracture 1436.60 1436.70 0
2017-09-03 Multi-Stage Fracture 1401.50 1401.60 0
2017-09-03 Multi-Stage Fracture 1358.60 1358.70 0
2017-09-02 Multi-Stage Fracture 2171.40 2171.50 0
2017-09-03 Multi-Stage Fracture 1315.90 1316.00 0
2017-09-03 Multi-Stage Fracture 1259.90 1260.00 0
2017-09-03 Multi-Stage Fracture 1230.60 1230.70 0
2017-09-03 Multi-Stage Fracture 1201.20 1201.30 0
2017-09-03 Multi-Stage Fracture 1172.10 1172.20 0
2017-09-03 Multi-Stage Fracture 1142.70 1142.80 0
2017-09-03 Multi-Stage Fracture 1099.80 1099.90 0
2017-09-03 Multi-Stage Fracture 1043.40 1043.50 0
2017-09-03 Multi-Stage Fracture 1014.00 1014.10 0
2017-09-03 Multi-Stage Fracture 984.60 984.70 0
2017-09-02 Multi-Stage Fracture 2128.50 2128.60 0
2017-09-02 Multi-Stage Fracture 2099.30 2099.40 0
2017-09-02 Multi-Stage Fracture 2056.40 2056.50 0
2017-09-02 Multi-Stage Fracture 2027.00 2027.10 0
2017-09-03 Multi-Stage Fracture 1984.20 1984.30 0
2017-09-03 Multi-Stage Fracture 1941.50 1941.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-02 2017-09-03 703 1,714 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 80.612 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.4033 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0511 N/A
water 7732-18-5 100 0.0511 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0497 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1162 N/A
Ethylene glycol 107-21-1 100 0.1162 N/A
Potassium Carbonate 584-08-7 100 0.1162 N/A
Potassium Hydroxide 1310-58-3 100 0.1162 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0293 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2682 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0666 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0666 N/A
water 7732-18-5 100 0.0666 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-02 2017-09-03 Groundwater - Saline 1714

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2653 0.0 0.0 0.0
2018 8380 0.0 0.0 0.0
2019 8267 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-28 No Incident Encountered 0.00 0.00
2017-08-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References