X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354043314000

Well Details

Well ID: 0354043314000
Loading map...
Location: 00/14-33-035-04W4/0
Location Alias: 00/14-33-35-04 W4M
Location Alias 2: 00/14-33-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 33
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ PROVOST 14-33-35-4
Operator Name: Karve Energy Inc.
License Number: 0484626
License Date: 2017-07-20
License Status: Issued
Spud Date: 2017-07-29
Final Drill Date: 2017-07-31
Well Total Depth: 2285.00 m
Surface Hole Latitude: 52.039176
Surface Hole Longitude: -110.522671

For data sources see[1][2]

Well History

Date Event
2017-07-20 Obtained License
2017-07-29 Surface Casing Operation Performed
2017-07-30 Direction Drilling Operation Performed - Deviate
2017-07-30 Direction Drilling Operation Performed - Horizontal
2017-07-31 Finished Drilling
2017-07-31 Production Casing Operation Performed
2017-07-31 Well Log Performed
2017-07-31 Well Mode changed to Drilled and Cased
2017-08-01 Rig Released
2017-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-13 Well Began Production
2017-09-13 Well Fluid changed to Crude Oil
2017-09-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-29 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-30 399.90 Deviate (5 - 79 degrees)
2017-07-30 854.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-02 Multi-Stage Fracture 2230.60 2230.70 0
2017-09-02 Multi-Stage Fracture 1878.80 1878.90 0
2017-09-02 Multi-Stage Fracture 1849.80 1849.90 0
2017-09-02 Multi-Stage Fracture 1820.40 1820.50 0
2017-09-02 Multi-Stage Fracture 1791.00 1791.10 0
2017-09-02 Multi-Stage Fracture 1765.40 1765.50 0
2017-09-02 Multi-Stage Fracture 1736.50 1736.60 0
2017-09-02 Multi-Stage Fracture 1707.80 1707.90 0
2017-09-02 Multi-Stage Fracture 1679.50 1679.60 0
2017-09-02 Multi-Stage Fracture 1650.10 1650.20 0
2017-09-02 Multi-Stage Fracture 1620.60 1620.70 0
2017-09-02 Multi-Stage Fracture 2187.70 2187.80 0
2017-09-02 Multi-Stage Fracture 1591.70 1591.80 0
2017-09-02 Multi-Stage Fracture 1562.40 1562.50 0
2017-09-02 Multi-Stage Fracture 1533.50 1533.60 0
2017-09-02 Multi-Stage Fracture 1504.00 1504.10 0
2017-09-02 Multi-Stage Fracture 1461.10 1461.20 0
2017-09-02 Multi-Stage Fracture 1418.10 1418.20 0
2017-09-02 Multi-Stage Fracture 1375.60 1375.70 0
2017-09-02 Multi-Stage Fracture 1332.60 1332.70 0
2017-09-02 Multi-Stage Fracture 1303.40 1303.50 0
2017-09-02 Multi-Stage Fracture 1260.50 1260.60 0
2017-09-02 Multi-Stage Fracture 2152.70 2152.80 0
2017-09-02 Multi-Stage Fracture 1231.00 1231.10 0
2017-09-02 Multi-Stage Fracture 1201.50 1201.60 0
2017-09-02 Multi-Stage Fracture 1172.10 1172.20 0
2017-09-02 Multi-Stage Fracture 1129.20 1129.30 0
2017-09-02 Multi-Stage Fracture 1100.30 1100.40 0
2017-09-02 Multi-Stage Fracture 1071.40 1071.50 0
2017-09-02 Multi-Stage Fracture 1041.90 1042.00 0
2017-09-02 Multi-Stage Fracture 1012.70 1012.80 0
2017-09-02 Multi-Stage Fracture 964.10 964.20 0
2017-09-02 Multi-Stage Fracture 938.60 938.70 0
2017-09-02 Multi-Stage Fracture 2109.70 2109.80 0
2017-09-02 Multi-Stage Fracture 909.50 909.60 0
2017-09-02 Multi-Stage Fracture 2071.10 2071.20 0
2017-09-02 Multi-Stage Fracture 2028.20 2028.30 0
2017-09-02 Multi-Stage Fracture 1988.80 1988.90 0
2017-09-02 Multi-Stage Fracture 1946.00 1946.10 0
2017-09-02 Multi-Stage Fracture 1907.70 1907.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-02 2017-09-02 708 1,692 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 80.1845 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 9.6079 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0519 N/A
water 7732-18-5 100 0.0519 N/A
IH-BEZ-6D Fusion Technologies Inc. Breaker Ethylene glycol 107-21-1 100 0.0498 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1178 N/A
Ethylene glycol 107-21-1 100 0.1178 N/A
Potassium Carbonate 584-08-7 100 0.1178 N/A
Potassium Hydroxide 1310-58-3 100 0.1178 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.0312 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2818 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0668 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0668 N/A
water 7732-18-5 100 0.0668 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-02 2017-09-02 Groundwater - Saline 1692

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2635 0.0 0.0 0.0
2018 8398 0.0 0.0 0.0
2019 8199 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-01 No Incident Encountered 0.00 0.00
2017-08-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References