X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354043310030

Well Details

Well ID: 0354043310030
Loading map...
Location: 03/10-33-035-04W4/0
Location Alias: 03/10-33-35-04 W4M
Location Alias 2: 03/10-33-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 33
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 03 PROVOST 10-33-35-4
Operator Name: Karve Energy Inc.
License Number: 0479641
License Date: 2016-06-09
License Status: Issued
Spud Date: 2016-06-28
Final Drill Date: 2016-07-01
Well Total Depth: 1937.00 m
Surface Hole Latitude: 52.038774
Surface Hole Longitude: -110.515630

For data sources see[1][2]

Well History

Date Event
2016-06-09 Obtained License
2016-06-29 Surface Casing Operation Performed
2016-06-30 Direction Drilling Operation Performed - Deviate
2016-06-30 Direction Drilling Operation Performed - Horizontal
2016-07-01 Finished Drilling
2016-07-01 Well Log Performed
2016-07-01 Well Mode changed to Drilled and Cased
2016-07-02 Production Casing Operation Performed
2016-07-02 Rig Released
2016-07-14 Well Log Performed
2016-07-15 Well Began Production
2016-07-15 Well Fluid changed to Crude Oil
2016-07-15 Well Mode changed to Flowing
2016-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-07-26 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-06-28 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-06-30 443.00 Deviate (5 - 79 degrees)
2016-06-30 783.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-24 Multi-Stage Fracture 1698.50 1698.60 0
2016-07-24 Multi-Stage Fracture 1408.40 1408.50 0
2016-07-24 Multi-Stage Fracture 1377.70 1377.80 0
2016-07-24 Multi-Stage Fracture 1346.90 1347.00 0
2016-07-24 Multi-Stage Fracture 1316.10 1316.20 0
2016-07-24 Multi-Stage Fracture 1285.30 1285.40 0
2016-07-24 Multi-Stage Fracture 1254.60 1254.70 0
2016-07-24 Multi-Stage Fracture 1223.80 1223.90 0
2016-07-24 Multi-Stage Fracture 1193.00 1193.10 0
2016-07-24 Multi-Stage Fracture 1162.30 1162.40 0
2016-07-24 Multi-Stage Fracture 1131.50 1131.60 0
2016-07-24 Multi-Stage Fracture 1667.80 1667.90 0
2016-07-24 Multi-Stage Fracture 1100.90 1101.00 0
2016-07-24 Multi-Stage Fracture 1070.20 1070.30 0
2016-07-24 Multi-Stage Fracture 1039.40 1039.50 0
2016-07-24 Multi-Stage Fracture 1008.60 1008.70 0
2016-07-24 Multi-Stage Fracture 977.80 977.90 0
2016-07-24 Multi-Stage Fracture 947.10 947.20 0
2016-07-24 Multi-Stage Fracture 1637.00 1637.10 0
2016-07-24 Multi-Stage Fracture 1592.90 1593.00 0
2016-07-24 Multi-Stage Fracture 1562.20 1562.30 0
2016-07-24 Multi-Stage Fracture 1531.40 1531.50 0
2016-07-24 Multi-Stage Fracture 1500.70 1500.80 0
2016-07-24 Multi-Stage Fracture 1469.90 1470.00 0
2016-07-24 Multi-Stage Fracture 1439.20 1439.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-24 2016-07-24 702 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water - KCL ( 5%) Not Available 100 76.2635 N/A
Sand (16/30) Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.2548 N/A
Crystalline silica. quartz 14808-60-7 100 3.2548 N/A
Iron Oxide 1309-37-1 100 3.2547 N/A
Titanium Oxide 13463-67-7 100 3.2547 N/A
Sand (20/40) Canyon Technical Services Aluminum Oxide 1344-28-1 100 19.5288 N/A
Crystalline silica. quartz 14808-60-7 100 19.5288 N/A
Iron Oxide 1309-37-1 100 19.5288 N/A
Titanium Oxide 13463-67-7 100 19.5289 N/A
Tolcide PS75LT Canyon Technical Services Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.016 N/A
Water 7732-18-5 100 0.016 N/A
CAN-2300 Breaker (Enzyme HpH) Canyon Technical Services Breaker Cellulase Enzyme Solution Not Available 100 0.0204 N/A
CAN-2301 Breaker (Oxidizer) Canyon Technical Services Breaker Ammonium Persulfate 7727-54-0 100 0.0912 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0912 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Technical Services Crosslinker Boric Acid 10043-35-3 100 0.1682 N/A
Monoethanolamine 141-43-5 100 0.1682 N/A
Water 7732-18-5 100 0.1682 N/A
CAN-2411 Non-emulsifier Canyon Technical Services Demulsifier Ethylene glycol 107-21-1 100 0.0772 N/A
Isopropanol 67-63-0 100 0.0772 N/A
Water 7732-18-5 100 0.0772 N/A
CAN-2000 Gellant (Guar) Canyon Technical Services Gelling Agent Polysacharide Suspension Not Available 100 0.4689 N/A
paraFLO 2 Canyon Technical Services Scale Inhibitor Non-hazardous base ingredient(s) Not Available 100 0.1107 N/A
Silica. crystalline-quartz 14808-60-7 100 0.1107 N/A
White mineral oil 8042-47-5 100 0.1107 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-24 2016-07-24 Surface Water - Runoff 1157

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3043 0.0 0.0 0.0
2017 6793 0.0 0.0 0.0
2018 7688 0.0 0.0 0.0
2019 8478 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-02 No Incident Encountered 0.00 0.00
2016-07-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References