If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354042910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.034685,"lon":-110.526991,"icon":""}]} |
Location: 00/10-29-035-04W4/0 | |
Location Alias: 00/10-29-35-04 W4M | |
Location Alias 2: 00/10-29-035-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 04 | |
Section: 29 | |
County/Municipality: Special Areas No. 4 | |
Well Name: KARVE HZ PROVOST 10-29-35-4 | |
Operator Name: Karve Energy Inc. | |
License Number: 0485307 | |
License Date: 2017-09-07 | |
License Status: Issued | |
Spud Date: 2018-01-05 | |
Final Drill Date: 2018-01-07 | |
Well Total Depth: 1461.00 m | |
Surface Hole Latitude: 52.034685 | |
Surface Hole Longitude: -110.526991 |
Date | Event |
---|---|
2017-09-07 | Obtained License |
2018-01-06 | Direction Drilling Operation Performed - Deviate |
2018-01-06 | Direction Drilling Operation Performed - Horizontal |
2018-01-06 | Surface Casing Operation Performed |
2018-01-07 | Finished Drilling |
2018-01-07 | Production Casing Operation Performed |
2018-01-07 | Well Log Performed |
2018-01-07 | Well Mode changed to Drilled and Cased |
2018-01-08 | Rig Released |
2018-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-02-10 | Well Began Production |
2018-02-10 | Well Fluid changed to Crude Oil |
2018-02-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-05 | Ensign Drilling Inc. | 348 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-06 | 484.00 | Deviate (5 - 79 degrees) |
2018-01-06 | 797.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-01-28 | Multi-Stage Fracture | 1423.90 | 1424.00 | 0 |
2018-01-28 | Multi-Stage Fracture | 1209.00 | 1209.10 | 0 |
2018-01-28 | Multi-Stage Fracture | 1173.70 | 1173.80 | 0 |
2018-01-28 | Multi-Stage Fracture | 1138.50 | 1138.60 | 0 |
2018-01-28 | Multi-Stage Fracture | 1092.30 | 1092.40 | 0 |
2018-01-28 | Multi-Stage Fracture | 1068.30 | 1068.40 | 0 |
2018-01-28 | Multi-Stage Fracture | 1032.90 | 1033.00 | 0 |
2018-01-28 | Multi-Stage Fracture | 997.90 | 998.00 | 0 |
2018-01-28 | Multi-Stage Fracture | 962.90 | 963.00 | 0 |
2018-01-28 | Multi-Stage Fracture | 927.60 | 927.70 | 0 |
2018-01-28 | Multi-Stage Fracture | 892.20 | 892.30 | 0 |
2018-01-28 | Multi-Stage Fracture | 1400.10 | 1400.20 | 0 |
2018-01-28 | Multi-Stage Fracture | 856.90 | 857.00 | 0 |
2018-01-28 | Multi-Stage Fracture | 1376.40 | 1376.50 | 0 |
2018-01-28 | Multi-Stage Fracture | 1352.30 | 1352.40 | 0 |
2018-01-28 | Multi-Stage Fracture | 1328.40 | 1328.50 | 0 |
2018-01-28 | Multi-Stage Fracture | 1304.50 | 1304.60 | 0 |
2018-01-28 | Multi-Stage Fracture | 1280.50 | 1280.60 | 0 |
2018-01-28 | Multi-Stage Fracture | 1256.80 | 1256.90 | 0 |
2018-01-28 | Multi-Stage Fracture | 1233.00 | 1233.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-01-28 | 2018-01-28 | 715 | 765 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 73.9613 | N/A | |||
16/30 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 25.2571 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0067 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0067 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0067 | N/A | ||||
SBE-2 (Breaker) | Step Energy Services | Breaker | Non-Hazardous Ingredients | Not Available | 100 | 0.0658 | N/A | |
Sodium chloride | 7647-14-5 | 100 | 0.0658 | N/A | ||||
SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.1047 | N/A | |
SBX-2 (Crosslinker) | Step Energy Services | Crosslinker | Proprietary | Trade Secret | 100 | 0.1091 | N/A | |
Water | 7732-18-5 | 100 | 0.1091 | N/A | ||||
SWG-101L (Gellant) | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.3628 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.3628 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.1321 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.1321 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.1321 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.1321 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.1321 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.1321 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1321 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-12 | 2018-01-25 | Municipal Water | 618 |
2018-01-12 | 2018-01-12 | Central Water Distribution Facility | 120 |
2018-01-28 | 2018-01-28 | Central Water Distribution Facility | 62 |
2018-01-15 | 2018-01-15 | Central Water Distribution Facility | 46 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7877 | 0.0 | 0.0 | 0.0 |
2019 | 8544 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-08 | No Incident Encountered | 0.00 | 0.00 |
2018-02-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]