X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354042616000

Well Details

Well ID: 0354042616000
Loading map...
Location: 00/16-26-035-04W4/0
Location Alias: 00/16-26-35-04 W4M
Location Alias 2: 00/16-26-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 26
County/Municipality: Special Areas No. 4
Well Name: TUDOR CORP LTD SUPR PROVO 16-26-35-4
Operator Name: Fairwest Energy Corporation
License Number: 0315327
License Date: 2004-09-24
License Status: Amended
Spud Date: 2004-10-07
Final Drill Date: 2004-10-08
Well Total Depth: 1115.00 m
Surface Hole Latitude: 52.036407
Surface Hole Longitude: -110.463103

For data sources see[1][2]

Well History

Date Event
2004-09-24 Obtained License
2004-10-04 Surface Casing Operation Performed
2004-10-07 Direction Drilling Operation Performed - Deviate
2004-10-08 Finished Drilling
2004-10-08 Well Mode changed to Drilled and Cased
2004-11-06 Production Casing Operation Performed
2004-11-06 Well Log Performed
2004-11-07 Rig Released
2004-11-17 Perforation Treatment Performed - Jet Perforation
2004-11-27 Perforation Treatment Performed - Fractured
2005-02-01 Well Began Production
2005-02-01 Well Fluid changed to Gas
2005-02-01 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2011-12-01 Well Fluid changed to Gas
2011-12-01 Well Mode changed to Flowing
2015-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-09 Perforation Treatment Performed - Cement Squeeze
2015-08-09 Plug Back Performed
2015-10-02 Perforation Treatment Performed - Jet Perforation
2015-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-03 Perforation Treatment Performed - Cement Squeeze
2015-10-03 Plug Back Performed
2015-10-07 Perforation Treatment Performed - Jet Perforation
2015-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-08 Perforation Treatment Performed - Cement Squeeze
2015-10-08 Plug Back Performed
2015-10-08 Well Fluid changed to Gas
2015-10-08 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-10-07 203.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-17 Perforation 919.00 926.00 17
2015-10-08 Packing Device Capped w/Cement 665.40 689.00 0
2004-11-27 Fracture 919.00 926.00 0
2015-08-09 Cement Squeeze 919.00 926.00 0
2015-08-09 Packing Device Capped w/Cement 904.80 914.40 0
2015-10-02 Perforation 834.00 837.00 17
2015-10-03 Cement Squeeze 834.00 837.00 0
2015-10-03 Packing Device Capped w/Cement 790.80 829.80 0
2015-10-07 Perforation 695.00 698.00 17
2015-10-08 Cement Squeeze 695.00 698.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 7699 0.0 0.0 0.0
2006 8646 0.0 0.0 0.0
2007 8691 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 7967 0.0 0.0 0.0
2010 2519 0.0 0.0 0.0
2011 336 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 6527 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-08 No Incident Encountered 0.00 0.00
2015-10-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References