X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354042009020

Well Details

Well ID: 0354042009020
Loading map...
Location: 02/09-20-035-04W4/0
Location Alias: 02/09-20-35-04 W4M
Location Alias 2: 02/09-20-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 20
County/Municipality: Special Areas No. 4
Well Name: KARVE 102 HZ PROVOST 9-20-35-4
Operator Name: Karve Energy Inc.
License Number: 0496072
License Date: 2019-10-16
License Status: Issued
Spud Date: 2020-01-14
Final Drill Date: 2020-01-17
Well Total Depth: 2030.00 m
Surface Hole Latitude: 52.021615
Surface Hole Longitude: -110.550073

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-14 Ensign Drilling Inc. 348 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-15 545.60 Deviate (5 - 79 degrees)
2020-01-16 894.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-22 Perforation 1958.00 1958.50 11
2020-01-22 Perforation 1690.00 1690.50 11
2020-01-22 Perforation 1660.00 1660.50 11
2020-01-22 Perforation 1562.00 1562.50 11
2020-01-22 Perforation 1523.00 1523.50 11
2020-01-22 Perforation 1455.00 1455.50 11
2020-01-22 Perforation 1424.00 1424.50 11
2020-01-22 Perforation 1395.00 1395.50 11
2020-01-22 Perforation 1365.00 1365.50 11
2020-01-22 Perforation 1335.00 1335.50 11
2020-01-22 Perforation 1304.00 1304.50 11
2020-01-22 Perforation 1930.00 1930.50 11
2020-01-22 Perforation 1264.00 1264.50 11
2020-01-22 Perforation 1235.00 1235.50 11
2020-01-22 Perforation 1195.00 1195.50 11
2020-01-22 Perforation 1165.00 1165.50 11
2020-01-22 Perforation 1135.00 1135.50 11
2020-01-22 Perforation 1103.00 1103.50 11
2020-01-22 Perforation 1075.00 1075.50 11
2020-01-22 Perforation 1045.00 1045.50 11
2020-01-22 Perforation 1015.00 1015.50 11
2020-01-22 Perforation 983.00 983.50 11
2020-01-22 Perforation 1900.00 1900.50 11
2020-01-22 Perforation 955.00 955.50 11
2020-01-22 Perforation 925.00 925.50 11
2020-01-22 Perforation 895.00 895.50 11
2020-01-27 Multi-Stage Fracture 1958.00 1958.10 0
2020-01-27 Multi-Stage Fracture 1930.00 1930.10 0
2020-01-27 Multi-Stage Fracture 1900.00 1900.10 0
2020-01-28 Multi-Stage Fracture 1870.00 1870.10 0
2020-01-28 Multi-Stage Fracture 1843.00 1843.10 0
2020-01-28 Multi-Stage Fracture 1810.00 1810.10 0
2020-01-28 Multi-Stage Fracture 1780.00 1780.10 0
2020-01-22 Perforation 1870.00 1870.50 11
2020-01-28 Multi-Stage Fracture 1750.00 1750.10 0
2020-01-28 Multi-Stage Fracture 1718.00 1718.10 0
2020-01-28 Multi-Stage Fracture 1690.00 1690.10 0
2020-01-28 Multi-Stage Fracture 1660.00 1660.10 0
2020-01-28 Multi-Stage Fracture 1562.00 1562.10 0
2020-01-28 Multi-Stage Fracture 1523.00 1523.10 0
2020-01-28 Multi-Stage Fracture 1455.00 1455.10 0
2020-01-28 Multi-Stage Fracture 1424.00 1424.10 0
2020-01-28 Multi-Stage Fracture 1395.00 1395.10 0
2020-01-28 Multi-Stage Fracture 1365.00 1365.10 0
2020-01-22 Perforation 1843.00 1843.50 11
2020-01-28 Multi-Stage Fracture 1335.00 1335.10 0
2020-01-28 Multi-Stage Fracture 1304.00 1304.10 0
2020-01-28 Multi-Stage Fracture 1264.00 1264.10 0
2020-01-28 Multi-Stage Fracture 1235.00 1235.10 0
2020-01-28 Multi-Stage Fracture 1195.00 1195.10 0
2020-01-28 Multi-Stage Fracture 1165.00 1165.10 0
2020-01-28 Multi-Stage Fracture 1135.00 1135.10 0
2020-01-28 Multi-Stage Fracture 1103.00 1103.10 0
2020-01-28 Multi-Stage Fracture 1075.00 1075.10 0
2020-01-28 Multi-Stage Fracture 1045.00 1045.10 0
2020-01-22 Perforation 1810.00 1810.50 11
2020-01-28 Multi-Stage Fracture 1015.00 1015.10 0
2020-01-28 Multi-Stage Fracture 983.00 983.10 0
2020-01-28 Multi-Stage Fracture 955.00 955.10 0
2020-01-28 Multi-Stage Fracture 925.00 925.10 0
2020-01-28 Multi-Stage Fracture 895.00 895.10 0
2020-01-22 Perforation 1780.00 1780.50 11
2020-01-22 Perforation 1750.00 1750.50 11
2020-01-22 Perforation 1718.00 1718.50 11

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-01-27 2020-01-28 777 795 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 78.7787 N/A
16/30 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 21.1178 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0095 N/A
Methyl Alcohol 67-56-1 100 0.0095 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0708 N/A
Sodium chloride 7647-14-5 100 0.0708 N/A
SCS-1 (Clay Control) Step Energy Services Clay Control Choline chloride 67-48-1 100 0.1093 N/A
Non-Hazardous Ingredients Not Available 100 0.1093 N/A
SBX-2C (Crosslinker) STEP Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0468 N/A
Ethylene Glycol 107-21-1 100 0.0468 N/A
Monoethanolamine 141-43-5 100 0.0468 N/A
Water 7732-18-5 100 0.0468 N/A
SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Mineral Oil 8012-95-1 100 0.0551 N/A
Polyacrylamide 5/8/9003 100 0.0551 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.0551 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.0551 N/A
Sodium Acrylate 7446-81-3 100 0.0551 N/A
Water 7732-18-5 100 0.0551 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3931 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3931 N/A
SNE-2C (Non-Emulsifier) STEP Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0784 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0784 N/A
Methanol 67-56-1 100 0.0784 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0784 N/A
Water 7732-18-5 100 0.0784 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2020-01-18 2020-01-18 Municipal Water 334
2020-01-18 2020-01-18 Municipal Water 546
2020-01-18 2020-01-18 Central Water Distribution Facility 154

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1238 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-20 No Incident Encountered 0.00 0.00
2020-02-13 No Incident Encountered 0.00 0.00

For data sources see[9]

References