X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354041503000

Well Details

Well ID: 0354041503000
Loading map...
Location: 00/03-15-035-04W4/0
Location Alias: 00/03-15-35-04 W4M
Location Alias 2: 00/03-15-035-04 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 15
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 3-15-35-4
Operator Name: Rolling Hills Energy Ltd.
License Number: 0480698
License Date: 2016-10-11
License Status: Issued
Spud Date: 2016-10-21
Final Drill Date: 2016-10-28
Well Total Depth: 1604.00 m
Surface Hole Latitude: 52.006730
Surface Hole Longitude: -110.501722

For data sources see[1][2]

Well History

Date Event
2016-10-11 Obtained License
2016-10-21 Surface Casing Operation Performed
2016-10-27 Direction Drilling Operation Performed - Deviate
2016-10-28 Direction Drilling Operation Performed - Horizontal
2016-10-28 Finished Drilling
2016-10-28 Well Log Performed
2016-10-28 Well Mode changed to Drilled and Cased
2016-10-29 Production Casing Operation Performed
2016-10-29 Rig Released
2016-11-07 Well Log Performed
2016-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-27 Well Began Production
2016-11-27 Well Fluid changed to Crude Oil
2016-11-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-10-21 Predator Drilling Inc. 7 N/A Set Surface
2016-10-27 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-27 374.00 Deviate (5 - 79 degrees)
2016-10-28 862.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-24 Multi-Stage Fracture 1568.90 1570.80 0
2016-11-24 Multi-Stage Fracture 1336.40 1338.30 0
2016-11-24 Multi-Stage Fracture 1310.40 1312.30 0
2016-11-24 Multi-Stage Fracture 1284.90 1286.80 0
2016-11-24 Multi-Stage Fracture 1259.00 1260.90 0
2016-11-24 Multi-Stage Fracture 1219.70 1221.60 0
2016-11-24 Multi-Stage Fracture 1182.50 1184.40 0
2016-11-24 Multi-Stage Fracture 1156.50 1158.40 0
2016-11-24 Multi-Stage Fracture 1130.80 1132.70 0
2016-11-24 Multi-Stage Fracture 1104.80 1106.70 0
2016-11-24 Multi-Stage Fracture 1078.90 1080.80 0
2016-11-24 Multi-Stage Fracture 1544.80 1546.70 0
2016-11-24 Multi-Stage Fracture 1052.90 1054.80 0
2016-11-24 Multi-Stage Fracture 1026.90 1028.80 0
2016-11-24 Multi-Stage Fracture 989.90 991.70 0
2016-11-24 Multi-Stage Fracture 964.00 965.80 0
2016-11-24 Multi-Stage Fracture 937.90 939.70 0
2016-11-24 Multi-Stage Fracture 1518.70 1520.60 0
2016-11-24 Multi-Stage Fracture 1493.00 1494.90 0
2016-11-24 Multi-Stage Fracture 1466.90 1468.80 0
2016-11-24 Multi-Stage Fracture 1440.70 1442.60 0
2016-11-24 Multi-Stage Fracture 1414.70 1416.60 0
2016-11-24 Multi-Stage Fracture 1388.40 1390.30 0
2016-11-24 Multi-Stage Fracture 1362.20 1364.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-24 2016-11-24 699 960 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 70.7764 N/A
FRAC SAND. 16/30 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 21.3722 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 7.0945 N/A
Magnacide 785 Baker Hughes Bactericide/Biocide Didecyl dimethyl ammonium chloride 7173-51-5 100 0.0352 N/A
Ethanol 64-17-5 100 0.0352 N/A
Methanol 67-56-1 100 0.0352 N/A
Water 7732-18-5 100 0.0352 N/A
Breaker FLC Baker Hughes Breaker Ethylene glycol 107-21-1 100 0.0001 N/A
Hemicellulase enzyme concentrate 9025-56-3 100 0.0001 N/A
Sucrose 57-50-1 100 0.0001 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0313 N/A
ClayMix Baker Hughes Clay Control Complex polyamine salt 138879-94-4 100 0.1533 N/A
Non-hazardous Not Available 100 0.1533 N/A
CXB-2 Baker Hughes Crosslinker Methanol 67-56-1 100 0.2619 N/A
Non-hazardous Not Available 100 0.2619 N/A
Sodium borate 7775-19-1 100 0.2619 N/A
Sodium hydroxide 1310-73-2 100 0.2619 N/A
NE-118 Baker Hughes Demulsifier 1.2.4-Trimethyl benzene 95-63-6 100 0.0586 N/A
1.3.5-Trimethyl benzene 108-67-8 100 0.0586 N/A
Ethoxylated alcohols. C6-C12 68439-45-2 100 0.0586 N/A
Isopropanol 67-63-0 100 0.0586 N/A
Light aromatic solvent naphtha 64742-95-6 100 0.0586 N/A
Oxyalkylated phenolic resin 63428-92-2 100 0.0586 N/A
Xylene 1330-20-7 100 0.0586 N/A
GW-3 Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.1811 N/A
GW-3SLR Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.0348 N/A
Low toxicity base oils - Non-WHMIS Controlled Not Available 100 0.0348 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-21 2016-11-21 Surface Water - Runoff 1100

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 813 0.0 0.0 0.0
2017 8528 0.0 0.0 0.0
2018 4199 0.0 0.0 0.0
2019 3319 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-29 No Incident Encountered 0.00 0.00
2016-11-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References