X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354041012W02

Well Details

Well ID: 0354041012W02
Loading map...
Location: W0/12-10-035-04W4/2
Location Alias: W0/12-10-35-04 W4M
Location Alias 2: W0/12-10-035-04 W4/02
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 04
Section: 10
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND PROVOST 12-10-35-4
Operator Name: Karve Energy Inc.
License Number: 0323327
License Date: 2005-01-05
License Status: Suspension
Spud Date: 2005-02-25
Final Drill Date: 2005-02-27
Well Total Depth: 816.00 m
Surface Hole Latitude: 51.993276
Surface Hole Longitude: -110.503389

For data sources see[1][2]

Well History

Date Event
2005-01-05 Obtained License
2005-02-25 Surface Casing Operation Performed
2005-02-26 Direction Drilling Operation Performed - Deviate
2005-02-27 Finished Drilling
2005-02-27 Well Mode changed to Drilled and Cased
2005-02-28 Production Casing Operation Performed
2005-02-28 Rig Released
2005-02-28 Well Log Performed
2005-03-04 Well Log Performed
2005-05-27 Perforation Treatment Performed - Jet Perforation
2005-05-27 Well Log Performed
2005-12-07 Perforation Treatment Performed - Fractured
2006-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-21 Perforation Treatment Performed - Jet Perforation
2006-02-21 Plug Back Performed
2006-02-21 Well Log Performed
2006-03-15 Well Began Production
2006-03-15 Well Fluid changed to Gas
2006-03-15 Well Mode changed to Flowing
2018-09-30 Well Fluid changed to Gas
2018-09-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-02-26 190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-05-27 Perforation 748.50 754.50 17
2005-12-07 Fracture 748.50 754.50 0
2006-02-21 Packing Device Capped w/Cement 727.00 735.00 0
2006-02-21 Perforation 698.00 702.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2188 0.0 0.0 0.0
2007 7866 0.0 0.0 0.0
2008 8656 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 7995 0.0 0.0 0.0
2011 8508 0.0 0.0 0.0
2012 8710 0.0 0.0 0.0
2013 8497 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8692 0.0 0.0 0.0
2016 8678 0.0 0.0 0.0
2017 4521 0.0 0.0 0.0
2018 1054 0.0 0.0 0.0

For data sources see[6]

References