X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354030202000

Well Details

Well ID: 0354030202000
Loading map...
Location: 00/02-02-035-03W4/0
Location Alias: 00/02-02-35-03 W4M
Location Alias 2: 00/02-02-035-03 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 03
Section: 02
County/Municipality: Special Areas No. 4
Well Name: RHE PROVOST 2-2-35-3
Operator Name: Rolling Hills Energy Ltd.
License Number: 0410637
License Date: 2009-05-27
License Status: Abandoned
Spud Date: 2009-07-12
Final Drill Date: 2009-07-14
Well Total Depth: 942.00 m
Surface Hole Latitude: 51.969886
Surface Hole Longitude: -110.322395

For data sources see[1][2]

Well History

Date Event
2009-05-27 Obtained License
2009-07-12 Surface Casing Operation Performed
2009-07-13 Direction Drilling Operation Performed - Deviate
2009-07-14 Finished Drilling
2009-07-14 Well Log Performed
2009-07-14 Well Mode changed to Drilled and Cased
2009-07-15 Production Casing Operation Performed
2009-07-15 Rig Released
2009-07-15 Well Log Performed
2009-07-22 Perforation Treatment Performed - Jet Perforation
2009-07-22 Well Log Performed
2009-07-23 Well Began Production
2009-07-23 Well Fluid changed to Crude Oil
2009-07-23 Well Mode changed to Pumping
2010-10-31 Well Fluid changed to Crude Oil
2010-10-31 Well Mode changed to Suspended
2017-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-04 Plug Back Performed
2017-02-04 Well Abandoned
2017-02-04 Well Fluid changed to Crude Oil
2017-02-04 Well Log Performed
2017-02-04 Well Mode changed to Abandoned Zone
2018-02-04 Well Fluid changed to Crude Oil
2018-02-04 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-07-13 389.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-07-22 Perforation 899.00 902.00 17
2009-07-22 Perforation 899.00 902.00 17
2017-02-04 Packing Device Capped w/Cement 879.50 887.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1025 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References