X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354021602020

Well Details

Well ID: 0354021602020
Loading map...
Location: 02/02-16-035-02W4/0
Location Alias: 02/02-16-35-02 W4M
Location Alias 2: 02/02-16-035-02 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 02
Section: 16
County/Municipality: Special Areas No. 4
Well Name: HIGH GROUND HZ 02 PROVOST 2-16-35-2
Operator Name: Karve Energy Inc.
License Number: 0489123
License Date: 2018-05-11
License Status: Issued
Spud Date: 2018-09-05
Final Drill Date: 2018-09-08
Well Total Depth: 2273.00 m
Surface Hole Latitude: 52.013469
Surface Hole Longitude: -110.229841

For data sources see[1][2]

Well History

Date Event
2018-05-11 Obtained License
2018-09-06 Direction Drilling Operation Performed - Deviate
2018-09-06 Surface Casing Operation Performed
2018-09-07 Direction Drilling Operation Performed - Horizontal
2018-09-08 Finished Drilling
2018-09-08 Well Log Performed
2018-09-08 Well Mode changed to Drilled and Cased
2018-09-09 Production Casing Operation Performed
2018-09-09 Rig Released
2018-10-20 Well Log Performed
2018-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-28 Well Began Production
2018-10-28 Well Fluid changed to Crude Oil
2018-10-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-05 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-06 455.60 Deviate (5 - 79 degrees)
2018-09-07 897.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-27 Multi-Stage Fracture 2238.60 2238.70 0
2018-10-27 Multi-Stage Fracture 1975.10 1975.20 0
2018-10-27 Multi-Stage Fracture 1919.90 1920.00 0
2018-10-27 Multi-Stage Fracture 1892.00 1892.10 0
2018-10-28 Multi-Stage Fracture 1864.10 1864.20 0
2018-10-28 Multi-Stage Fracture 1836.10 1836.20 0
2018-10-28 Multi-Stage Fracture 1808.20 1808.30 0
2018-10-28 Multi-Stage Fracture 1739.90 1740.00 0
2018-10-28 Multi-Stage Fracture 1712.20 1712.30 0
2018-10-28 Multi-Stage Fracture 1684.50 1684.60 0
2018-10-28 Multi-Stage Fracture 1656.60 1656.70 0
2018-10-27 Multi-Stage Fracture 2210.60 2210.70 0
2018-10-28 Multi-Stage Fracture 1628.70 1628.80 0
2018-10-28 Multi-Stage Fracture 1600.90 1601.00 0
2018-10-28 Multi-Stage Fracture 1573.10 1573.20 0
2018-10-28 Multi-Stage Fracture 1507.80 1507.90 0
2018-10-28 Multi-Stage Fracture 1480.00 1480.10 0
2018-10-28 Multi-Stage Fracture 1452.60 1452.70 0
2018-10-28 Multi-Stage Fracture 1424.60 1424.70 0
2018-10-28 Multi-Stage Fracture 1396.90 1397.00 0
2018-10-28 Multi-Stage Fracture 1369.10 1369.20 0
2018-10-28 Multi-Stage Fracture 1341.20 1341.30 0
2018-10-27 Multi-Stage Fracture 2183.50 2183.60 0
2018-10-28 Multi-Stage Fracture 1313.40 1313.50 0
2018-10-28 Multi-Stage Fracture 1244.70 1244.80 0
2018-10-28 Multi-Stage Fracture 1216.80 1216.90 0
2018-10-28 Multi-Stage Fracture 1188.90 1189.00 0
2018-10-28 Multi-Stage Fracture 1162.00 1162.10 0
2018-10-28 Multi-Stage Fracture 1134.10 1134.20 0
2018-10-28 Multi-Stage Fracture 1092.80 1092.90 0
2018-10-28 Multi-Stage Fracture 1065.00 1065.10 0
2018-10-28 Multi-Stage Fracture 1037.40 1037.50 0
2018-10-28 Multi-Stage Fracture 1009.40 1009.50 0
2018-10-27 Multi-Stage Fracture 2155.90 2156.00 0
2018-10-28 Multi-Stage Fracture 981.50 981.60 0
2018-10-27 Multi-Stage Fracture 2127.90 2128.00 0
2018-10-27 Multi-Stage Fracture 2086.80 2086.90 0
2018-10-27 Multi-Stage Fracture 2058.80 2058.90 0
2018-10-27 Multi-Stage Fracture 2030.90 2031.00 0
2018-10-27 Multi-Stage Fracture 2003.00 2003.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-27 2018-10-28 764 1,611 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 79.2423 N/A
16/30 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 16.1018 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 4.0254 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.011 N/A
Methyl Alcohol 67-56-1 100 0.011 N/A
Non-Hazardous Ingredients Not Available 100 0.011 N/A
SBE-2 (Breaker) Step Energy Services Breaker Non-Hazardous Ingredients Not Available 100 0.0728 N/A
Sodium chloride 7647-14-5 100 0.0728 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.0861 N/A
Water 7732-18-5 100 0.0861 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0369 N/A
Non-Hazardous Ingredients Not Available 100 0.0369 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0369 N/A
SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.3509 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.3509 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0728 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0728 N/A
Methanol 67-56-1 100 0.0728 N/A
Monoethanolamine 141-43-5 100 0.0728 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0728 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0728 N/A
Water 7732-18-5 100 0.0728 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-27 2018-10-28 Groundwater - Non-saline greater than 150m deep 806
2018-10-27 2018-10-28 Waste Water - Oilfield 806
2018-10-27 2018-10-28 Groundwater - Saline 805

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 888 0.0 0.0 0.0
2019 8469 0.0 0.0 0.0
2020 2131 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-09 No Incident Encountered 0.00 0.00
2018-11-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References